• ZGK12 12M lifting height, 200kg rated loads,hydraulic drive,self-propelled articulated work platform System 1
  • ZGK12 12M lifting height, 200kg rated loads,hydraulic drive,self-propelled articulated work platform System 2
  • ZGK12 12M lifting height, 200kg rated loads,hydraulic drive,self-propelled articulated work platform System 3
  • ZGK12 12M lifting height, 200kg rated loads,hydraulic drive,self-propelled articulated work platform System 4
ZGK12 12M lifting height, 200kg rated loads,hydraulic drive,self-propelled articulated work platform

ZGK12 12M lifting height, 200kg rated loads,hydraulic drive,self-propelled articulated work platform

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
15 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specifications

1.Aerial work platform 12M 
2.Full hydraulic drive 
3.Strong steel structure 
4.Max working range 14m 
5.360 degree rotation 

ZGK12 12M lifting height, 200kg rated loads,hydraulic drive,self-propelled articulated work platform  

 

1.Aerial work platform 12M
2.Full hydraulic drive
3.Strong steel structure
4.Max working range 14m
5.360 degree rotation

 

 

Technical parameters for ZGK12 self-propelled articulated work platform

 

Project

Design value

Total length (mm)

5150

Total width (mm)

2010

Total height (mm)

3040

Front overhang(mm)

920

Rear overhang (mm)

1000

Front Protraction (mm)

Rear Protraction (mm)

Minimum ground clearance (mm)

190

Approach Angle (°)

29

Departure angle (°)

16

Minimum turning diameter (mm)

13800

Wheel tread

Front (mm)

1190

Rear (mm)

1150

Wheelbase (mm)

2930

Total weight (kg)

2650

The load weight of the front axle (kg)

1200

The load weight of rear axle (kg)

1450

Maximum traveling speed (km/h)

20

Maximum grade ability (%)

20

Hundred kilometers oil consumption (L)

4

Steering Type

Steering wheel

Number of steel plate spring (front/rear)

4/5

Number of tires

4

Tire type

Front 5.00-12 /rear5.50-16

Axes

2

Platform lifts and falls time without loading anything (s)

Whole journey time of rising arm

109

Whole journey time of falling arm

70

Platform lifts and falls time at its full load

Whole journey time of extending

120

Whole journey time of shrinking

109

Extending and shrinking hydraulic ram time (s)

Vertical hydraulic ram

Shrinking time

6

Extending

9

Swing speed (r/min)

1/4

Length of boom arm I (mm)

3411

Length of boom arm I II (mm)

4697

Maximum lifting height of platform (mm)

12000

Maximum working height of platform (mm)

14000

Rated load platform (kg)

200

Rated vertical leg span (left / right) (mm)

4430

Horizontal leg span (front / rear) (mm)

2660

 

Q: The difference between energy-saving and other frequency station
The business model is now using online consignment line, under the city manager with the equipment model, and credit quality and even the ability to repay the buyer to provide armored financial services.
Q: i need machinery to make MDF out of palm tree branches
Please list your technical expertise, financial resources, experience with industrial machinery, desired output, size of facility, level of automation desired, marketing expertise, and location (so I can estimate level of governmental interference with environmental concerns). When you provide that background information your question has a shot at being answered.
Q: A recent study has shown that the most effective way for most firms to improve worker productivity is to increase expenditures on machinery and equipment.true?
Not true. Machinery and equipment does not make anyone more productive. Money, status, a title, perks - are human worker motivators. Machine(s) reduces the need for staff, and are more suited for repetitive work. Peace.
Q: To ask, I have better supply of construction machinery here, I would like to foreign trade, I do not know how the international market in the near future, engineering machinery, foreign trade to prepare what knowledge?
Unexpected debt crisis in Europe is likely to enter the global financial crisis of second act "-- before the international financial predators Soros made such a point of view. For the Chinese enterprises, the export situation in the coming months seems to be very dense. Construction machinery industry exports suffered a severe blow in the financial crisis. In 2010, the export situation is still the key factor restricting the growth of the industry.
Q: A) it was assembled from two anaerobic systems that had originated in different types of bacteriaB) it obtains electrons by splitting waterC) it involved a modified version of electron transportD) it evolved relatively late in the evolution of prokaryotes, sometime after eukaryotes had arisenE) it caused Earth's atmosphere to become an oxidizing one
D) seems wrong to me
Q: We found this little shed right outside Virginia City, NV.Inside was this old machinery.. it was probably used for mining.
Yep, it looks like a winch to me too. I see a second drum, so perhaps it was a winch that could pull a cable in two directions, with the cable looped around a pulley at some distant point and being wound onto one of the drums as it is unwound from the other. (hard to see the gearing, etc., from that image). As for age, that electric motor looks like it's about 100 years old! (just a wild guess, of course)
Q: I want to start export machinery spares parts from India. I don't know how to start? I did some research sent some email to foreign company but nobody replied..?? Please guide me step by step process. 1. How to approach foreign traders/foreign importers?2. How do I market my company?3. What are the legal procedure to export from India?4. What is market position for exporting machinery spare parts from India?
Go to your board of trade in your community,importing Exporting the canadain goverment has booklets,when you dealing with another country you have to register your bussiness thats,insurance,bondable,frieght insurance,and the person that can help you is a custom broker there in the yellow pages,and you would have to look upindia custom,there tarrifs,its a lot but my suggestin is look for gov help,look on web site exporting products
Q: why are safety symbols placed near electrical machinery ?
Because it can be dangerous.
Q: Suppose I have a business and I install Energy saving lights in my factory . Can I get any higher depriciation?
There is no such provision in Income tax Act. Since you will be spending more, you will get higher depreciation. Under electricity equipments, there is no separate rate. Some states in India provide concession up to 5% on the electricity bill.
Q: How long will it take to see results?
join a mma gym,no, you wont have to fight anyone, its all you will need, weights are for meatheads, a good trainer will wear you out, you will have results in one session mentally, (once you feel what it takes to drop weight) if you can take two classes a week, you will see it soon

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords