Specifications
80% of the power frequency withstand voltage
the leak rate is low
high operating reliability
good safety performance
Introduction :
Release time :
2012-8-22 Product Description: Product role With 72.5 ~ 550kV GIS Current Transformer, sulfur hexafluoride gas insulation, mainly used in power systems power measurement, current measurement and relay protection.
Product structure
Features
1, insulation stable: 80% of the power frequency withstand voltage under the partial discharge amount not greater than 5pC.
2, the leak rate is low: annual leakage rate of less than 0.3%, far better than the 1% of the requirements of the GB.
3, high operating reliability: pressure SF6 gas zero table, safe operation can be a long time.
4, good safety performance: explosion-proof device with excellent explosion-proof performance.
5, high precision: measurement up to meet the 0.1 level.
6 protection: protect the winding core of high permeability and saturation flux density is high (greater than 1.8T).
Technical parameters
Type | L (S) R-72.5 | L (S) R-126 | LR-220 | LR-500 | ||
The devices rated voltage, kV | 66 | 110 | 220 | 500 | ||
The * Device highest voltage, kV | 72.5 | 126 | 252 | 550 | ||
Rated frequency Hz | 50-60 | |||||
* Short-time power frequency withstand voltage, kV | 160 | 230 | 460 | 740 | ||
* Lightning impulse voltage, kV | 350 | 550 | 1050 | 1675 | ||
Partial discharge level (1.2Um / √ 3) | <5pC | |||||
* Rated current, A | 300-300 | 300-300 | 300-4000 | 600-5000 | ||
* Rated secondary current, A | 5 or 1. | 1 | ||||
* Accuracy class (subject combinations) | 0.2S; 0.2; 0.5S; 0.55P; 10P | |||||
* Rated output, VA | 15-50 | 15-50 | 10-50 | 10-30 | ||
Safety factor, FS | 5 or 10 | |||||
* Accuracy Limit Factor, ALF | 10-40 | |||||
Short-term thermal stability current, kA / s | 40/3 | 40/3 | 31.5-63 / 3 | 50-63/3 | ||
Rated dynamic current, kA | 100 | 100 | 80-125 | 125-160 | ||
SF6 rated pressure (20 ° C), Mpa | 0.4 | |||||
A SF6 Buqi pressure (20 ° C), Mpa | 0.35 | |||||
SF6 gas leakage rate,% | <0.3 | |||||
SF6 moisture content, μL / L | <150 |
- Q: What are the two power distribution equipment?
- Such as generator, transformer, circuit breaker, isolating switch, bus, power cable and transmission lines, etc..
- Q: What are the distribution network equipment
- Electricity and other energy sources, its main features are: cannot be stored in large scale, power generation, transmission, distribution and consumption at the same instant
- Q: What are the general requirements for working on distribution equipment?
- When the high voltage line is not cut off, the person in charge of the work shall explain to the whole staff that there is electricity on the line and strengthen the monitoring
- Q: Transmission system and distribution system
- Transmission system is based on the power supply to the same level or lower substation for the purpose of the general voltage level higher (35KV or more)
- Q: Distribution system equipment classification
- Special equipment used in a certain industry, such as artillery, automatic teller machine, steel making furnace, etc.
- Q: High and low voltage distribution equipment
- High voltage distribution equipment: high voltage fuse; high voltage isolation switch; high voltage load switch; high voltage circuit breaker.
- Q: Transmission lines are not electrical equipment?
- Transmission lines in the power transmission project belongs to the carrier, belonging to the power cable category, should not be called equipment
- Q: What is the transmission line, what is the power distribution equipment
- As the name implies, the transmission is by the power plant or power center regional power grid (sending end), to the load center power grid (by the end) of the transmission of electricity; power distribution is to be distributed by the substation or bus power down.
- Q: Difference between distribution voltage and supply voltage
- In general, the city substation will be reduced to 10KV 110KV to the electrical terminal.
- Q: Power distribution equipment should be prepared before the blackout?
- after the high and low voltage power failure, the work must be carried out before the first inspection
Send your message to us
GIS 72.5 -550kV
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches