Galvanize Ringlock Scaffolding Easy Assembly Top Quality Metal
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2 m.t.
- Supply Capability:
- 100000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Ringlock Scaffolding
Ringlock is a modular scaffold system which can provide major savings in labor costs while meeting the demands for safety, ease of handling and reductions in maintenance.
Ringlock scaffold has the following features:
1.Quick erection: Ringlock scaffold are all pre-measured and just a hammer is required when erection.
2.Safety: The reliable wedge connections prevent ledgers and diagonal braces from any kind of loosening, The rigid, right fit of all connections with concentric derivation of loads guarantees safety even at great heights.
Main Features of the Ringlock Scaffolding
Place of Origin | Beijing, China (Mainland) |
Product Name: | Ringlock Scaffolding |
Custom Code | 7308400000 |
Color | Silver, golden |
Surface treatment | Painted,Hot-Dip,Galvanized,Electro Galvanized, Powder Coating |
Material | Q235,Q345.etc |
Package | Customized Package |
Payment Terms | T/T,L/C |
Delivery Detail | 15-25 Days |
Quality Control | IS09001 Certification, Quality Test |
Standard | 48.3*3.25*4000mm |
Ledger | 48.3*3.25*3072mm |
Ledger End | 1.2kg |
Advantages
1)To be erected easily and quickly
2)Installed to different angels with rosettes of
two different hole being positioned there
3)Ringlock scaffolding provides complete flexibility to lock in any angel.
4)Diagonal braces are to be tailored in
accordance with the lengths of vertical and horizontal tubes
Specification of Ringlock Scaffolding
The Standards(Verticals) | ||||
Length(mm) | Tube Thickness(mm) | Tube Diameter(mm) | Surface Treatment | |
3000 | 3/3.25 | 48 | HDG/Painted | |
2500 | 3/3.25 | 48 | HDG/Painted | |
2000 | 3/3.25 | 48 | HDG/Painted | |
1500 | 3/3.25 | 48 | HDG/Painted | |
1000 | 3/3.25 | 48 | HDG/Painted | |
500 | 3/3.25 | 48 | HDG/Painted | |
The Ledgers(Horizontals) | ||||
Effective Length(mm) | Tube Thickness(mm) | Tube Diameter | Surface Treatment | |
2000 | 3/3.25 | 48 | HDG/Painted | |
1770 | 3/3.25 | 48 | HDG/Painted | |
1000 | 3/3.25 | 48 | HDG/Painted | |
The Diagonal Brace | ||||
Length(mm) | Tube Thickness(mm) | Tube Diameter(mm) | Surface Treatment | |
2411 | 3 | 48 | HDG/Painted | |
2244 | 3 | 48 | HDG/Painted | |
The bracket | ||||
Length(mm) | Tube Thickness(mm) | Tube Diameter(mm) | Surface Treatment | |
730 | 3 | 48 | HDG/Painted | |
Plank | ||||
Effective Length(mm) | Width(mm) | Height(mm) | Surface Treatme | |
2050 | 480 | 45 | HDG | |
1820 | 480 | 45 | HDG | |
3000 | 240 | 45 | HDG | |
2000 | 240 | 45 | HDG | |
1000 | 240 | 45 | HDG | |
Hollow Head Jack And Jack Base | ||||
Length(mm) | Tube Diameter(mm) | Size of Plate(mm) | Surface Treatment | |
600 | 38 | 150*120*50*4 | HDG | |
600 | 38 | 150*150*4 | HDG |
Accessories
Packing
Inspection
Project
More Photos
- Q: An 800N painter stands 3.00m from the left end of a scaffold that is 4.00m long. The uniform wooden scaffold weighs 100N and is hung by a chain at each end. What is the tension in each chain?A uniform meter stick weighs 25 N. An 80 N weight is hung at the 20.0cm mark. A 70.0N weight is hung at the 90cm mark. what is the magnitude of the upward force needed to balance the meter stick?Please help! I have a huge exam on these and my teacher wouldn't help me! I am so stumped please help!
- Required conditions for equilibrium (Other wise the scaffold is moving) Sum of forces = 0 Sum of Torques = 0 Sum of Forces Painter: 800 N DOWN Scaffold: 100 N Down Sum of tensions in chains = 800 + 100 = 900 N UP Sum of Torques (Pick one end, it does not matter which. I choose the Left end) Torque = Force * Lever arm Painter is 3.0 meters from Left end Tp = 800 N * 3.00 m = 2,400 N-m CW (Clockwise) Center of gravity is at the center of the scaffold or 4/2 = 2 meters from the Left enf Ts = 100 * 2 = 200 N-m CW This means that the chain on the Right end must supply 2400 + 200 = 2600 N-m CCW Tc = Fc * 4.00 m 2600 = Fc * 4 Fc= 650 N UP Total need up is 900 N====> 900 - 650 = 250 N in Left chain QED
- Q: Hey guys, so I got my scaffolding (ear) done yesterday. My piercer told me NOT to clean it, and that the best thing for a cartilage piercing is to quot;leave it bequot; I trust this advice, but I wanted to ask your opinion or methods that worked for you :) Thanks lt;3
- To be perfectly honest, I don't clean my piercings while they are healing. I follow the LITHA (leave it the hell alone) method and have never, ever dealt with infection in any of my piercings. But I have also had a pretty good amount of piercings and know my body heals them just fine to not have to mess with them. If this is one of your first piercings and you've not healed a cartilage piercing before, I'd stick to doing sea salt soaks twice a day for 5-10 minutes each soak with 1/4th of a teaspoon of non-iodized sea salt to 8oz of hot water.
- Q: this is the excerpt-We have witnessed a people [Muslims] to each and every one of whom death is preferable to life, and humility to prominence, and to none of whom this world has the least attraction. Their leader is like one of them: the low cannot be distinguished from the high, nor the master from the slave. And when the prayer time comes, all wash their hands and feet and humbly pray.QUESTION: How does this writer describe the Muslim people?Sorry i know this is my homework i just need help analyzing it. Is the writer describing them as unliked people? or people he respects?
- It seems like he is describing them like he respects them. He is idolizing their humility and pride. Is DBQ a Document Based Question? just wondering, if you are in APH, good luck! :) Addition: I found your post responding to this one. lol Hopefully this helped! I remember those DBQs, kinda a pain. lol....but it was a fun class and it is well worth taking!
- Q: Door type steel pipe scaffold, bowl type, plate type, what is the disc pin?
- Fastener steel pipe scaffold, scaffolding, scaffolding, plate type pin type scaffold is currently widely used scaffolding,
- Q: I got my scaffolding piercing yesterday (a bar through the cartilage) and when i woke up this morning there was quite a lot of blood, i mean like there was big clumps of it around the holes. I've cleaned it up and it seems to look okay and it isn't any more painful than when i got it done yesterday. Is this normal?Thanks (:
- Yeah, your body is reacting to having a giant metal rod through it =] Its likely that in your sleep youve rolled onto it and that has caused the piercing to bleed. You can try putting a pillow next to you to aviod you rolling over. Otherwise dont sweat it just keep cleaning twice daily and youll be fine.
- Q: How come wwe doesn't have any barb wire rope or scaffold match?
- Those type of matches can take years off a wrestlers career. If WWE shorterns their wrestlers careers then they can't make as much money off of them. American promotions that do that only do that to be different from WWE, and to try to draw attention since most of them can't match WWE's wrestling. Promotion from different countries do those type of matches for different reason though.
- Q: how can you tell is a scaffolding piercing is infected?
- Excessive redness extending well beyond the piercing area, hot to the touch, yellow/green pus with an odor.
- Q: Did the pageantry of pain at the scaffold actually deter people of crimes during the 18th century?
- Nope. There are plenty of accounts of people sentenced to death for crimes (such as pickpocketing) that they committed AT somebody else's public execution..
- Q: Cuplock scaffolding every 6 meters set a longitudinal scissors is what mean
- Means that the bowl buckle scaffold vertical every interval of 6 meters to set up a pair of scissors, out of the vertical rod and bar,
- Q: Im going to get a scaffold.how much are they and 1 being no pain and 10 being the worse what would be your rate on the pain 1-10
- I would say about a 6 maybe 7... and its a pain for the first few months.. like it gets sore if you lay on it to much ect :)
Send your message to us
Galvanize Ringlock Scaffolding Easy Assembly Top Quality Metal
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2 m.t.
- Supply Capability:
- 100000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords