• Formwork pipe hook steel System 1
  • Formwork pipe hook steel System 2
Formwork pipe hook steel

Formwork pipe hook steel

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details

Place of Origin:
Hebei China (Mainland)
Brand Name:
XINYUAN
Model Number:
XY-HOOK
Tensile strength:
6000lbs 7200lbs

Packaging & Delivery

Packaging Detail:hook large 10,000pcs/bag hook small 20,000pcs/bag
Delivery Detail:15 days after signed order confirmation

Specifications

Quick DetailsPlace of Origin: Hebei China (Mainland) Model Number: XY-HOOK
Material: steel Name:

Specifications

J pipe hook
1.Size:small and large
2.Packing:Packages
3.Used in construction formwork.
4.High quality

XY J pipe hook


2.Size:small and large
3.Packing:Packages
Used in construction formwork .
High quality and good price

A hand-tool for carrying a section of irrigation pipe which includes a pair of hooks held at spaced points along the pipe section for supporting the pipe. Each hook has a portion in which the pipe is loosely received. When the hooks are canted with respect to the pipe, the receiving portion of each hook grips the pipe and holds it against rotation about its longitudinal axis. A method of carrying a length of pipe, including the steps of placing a pair of hooks about a pipe section, holding the pipe against rotation about its longitudinal axis and lifting the pipe while continuously holding the same.

pipe hook

Name

pipe hook

Size

small and large

Packing

16000PCS/20000PCS/Pallets

Using

Used in construction formwork .
High quality and good price


Q: Said chrysanthemum disc scaffolding system, disc scaffolding system, wheel type scaffolding system, buckle scaffold, layher frame
PoleName specification A (mm) B (mm) theoretical weight (kg)Riser LG-60 6004LG-120 12007.41LG-180 180010.67LG-240 240014.02LG-300 300017.31
Q: hi guys i got my scaffold piercing a couple of days ago and it keeps bleeding on and off and there was dry blood but i removed it and its bleeding more what could i do step by step to keep total care of my piercing to get rid of all these problem please help it will really be appreciated
Dab it with tissue until it stops, Try not to play with it too much and if you need to touch it, ALWAYS wash your hands before doing so. Also do hot salt water soaks (as hot as you can stand) twice a day and it'll heal nicely in no time :)
Q: Fastener type steel pipe scaffold composed of components
Rotating fasteners, connecting rods, pedals (steel pedals, bamboo pedals can be), the extension of the extension of the galvanized steel pedal easy to use
Q: there is also shrubs and trees planted on the base of the wall and 14 feet from it
you should have thought about all this before you bid. Now it`s your problem
Q: The outer hanging scaffold board 12 embedded parts embedded in the crack?
The outer hanging scaffold board 12 embedded parts embedded in the crack, because the outer hanging scaffold embedded generally should be buried in the beam, and checking of the beam.
Q: hi, i already have my cartlidge pierced on my right ear and thinking about getting a scaffold piercing on my left ear. will a scaffold piercing hurt more than my cartlidge piercing,,less,,or about the same???thanks answers apprecietedhope =] xx
Several people have told me it hurts about the same. I do not have one, sorry couldn't be more help than that.
Q: What is the meaning of the scaffold when it is set up in the concrete structure of the permanent building
Selection of the project using 48 mm, 3.5mm wall thickness of steel pipe and the corresponding fasteners, dense mesh safety net, big eyes, such as net feet
Q: The construction scheme of high rise and external cantilever scaffold!
Quality standard for 3 foot hand frame fittings(1) steel pipe: steel pipe is generally used outside the 48mm, the wall thickness of 3.5mm steel welded pipe No. 3,The chemical composition and mechanical properties can meet the national standard "carbon structural steel" (GB / T700). The vertical rod, longitudinal rod (rod) tube length is 4~6m, horizontal bar (small bar) is generally 1.2.3m. steel pipe should be coated with anti rust paint.
Q: Standard Specification for bowl buckle scaffold
A new type of scaffold developed in China
Q: i am getting my industrial (scaffold) pierced on one ear and i want my cartilage on the other ear, how long do i have to wait between them? What are pros and cons for industrial (scaffold)? what are risks and stuff and how much is it? i want to get it so any information or anything i should know would be great thanks especially for industrial:)
You can have both done in the same day if you can handle the pain and shock. Get the industrial done first, and if you still feel OK afterwords, you can get your other ear done by the same piercer. Talk to him/her and let them know what you want to do before you start. If you feel like you need to wait after the industrial, wait at least a day before getting the second piercing. It's all about what you can handle.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords