Forklift manned platforms-NK30
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Model | unit | NK30A | NK30B | NK30C |
rated load weight | kg | 300 | 300 | 300 |
manned platform size(length*width) | mm | 950×950 | 1200×1000 | 1000×1000 |
develop height | mm | 2180 | 2190 | 2200 |
fork space(inner side) | mm | 500 | 650 | 550 |
Single fork size(length*width) | mm | 195×86 | 195×86 | 195×86 |
Net weight | kg | 99 | 120 | 108 |
Equipped with safety pin in the open door columns,antiskid table-board and bottom osculum,impact-proof head guardrail,ensure safety.
Manned platforms through security long pin and chains were fixed on the fork,ensure not slip.
Easy to dismantle and installation,less storage space.
The European Union pm28 and gn48 safety and health standards.
Optional universal casters,convenient to move.Optional box maintenance tools.
Used in upper air work and maintenance work.
- Q:The advantages and disadvantages of using diesel engine as an engine
- Most of the diesel engines are low speed machines, with a speed of about 100 revolutions per minute, which can drive the propeller directly. Improved fuel consumption of diesel engine power plant to the lowest, and lift platform can use cheap residue, high reliability, the thermal efficiency can be closer to 50%.
- Q:What should the chain's main elevator be aware of when installing the chain
- The installation of the power system traction equipment interface must be done. According to our experience, part of the accident was caused by the failure of some manufacturing enterprises to do the right thing with the traction power and the host mesa.
- Q:The ball of the universal milling and lifting platform rolls off, how to install,
- Remove the screw and remove the poles, bearings, and bearings. Find a root (casing pipe diameter and the bottom of the screw thread diameter size, casing Canon and screw axis diameter size), the sleeves on the screw axis, the screw nut screw on the casing; When fully rotating to the casing, remove the casing and the screw nut. Slide to one end of the casing and the screw nut expose about half a circle ball nut (must pay attention to, don't put the ball, or ball will all fall out), with tiny rod or wire, adjust the position of the ball, with one or more of the position of the ball, then fill in falling ball (this step is very important, it is better to have a ball screw pair assembly experience to do); Once you have finished, put the casing on the shaft of the screw. Then turn the nut onto the screw.
- Q:How does the platform maintain
- Inspect hydraulic oil and oil level. The hydraulic oil should be 40 to 50 mm above the tank when the platform rises to the highest. When the oil is dark, the oil is sticky, or the oil has grit and other foreign things, the hydraulic oil should be replaced in time. The hydraulic system of lift platform applies 32 # hydraulic oil. A. check the hydraulic and pipe joints. The pipe is damaged and should be replaced immediately. Tighten the joint when the connection is loose.
- Q:The purpose of the rail elevator
- The product structure is strong, the load is large, the lift is stable, the installation maintenance is simple and convenient, is the economical and practical low floor space to replace the elevator's ideal cargo transport equipment. According to the installation environment and use requirements of lifting platform, choose different optional configuration, can achieve better effect, the use of this product is mainly used in chemical, high temperature and high pressure, power plant, the nuclear industry base, such as explosive explosion protection enterprise.
- Q:You need to make a small lift platform, on top of the robot, non-industry. What you want is to add a light pole with a nut and a bolt, and you can use an electric motor to turn the bolts and the nuts.
- It is possible to design screw and motor power and variable speed system according to lifting weight.
- Q:What is the phenomenon of the worker's transport of wood using a lift
- The stationary elevator is a kind of stability and stability, can not move can only hold the homework, makes the high-altitude homework to be easy. The transport of goods mainly used in production lines or between floors; The material is up and down. Adjust the height of the workpiece when the workpiece is assembled; Top feeder: Lifting up parts when large equipment is assembled; Material on large machine tools; The warehousing and loading and unloading facilities shall be equipped with the loading and unloading of goods such as forklift truck.
- Q:How do you jump to the wall and jump to the wall?
- Can you give me a screenshot of the game? You can only be part of the tutorial now. Isn't there a white shadow leading the way? Right? " You try shift, I'm not sure the apocalypse USES that. Although I only play half way. But that's also because the strongholds are so annoying. As for the jump. The shadow should be shown to you, otherwise you are baidu to see the inside of video. Watch it again.
- Q:The hydraulic cylinder with hydraulic platform is changed to whether the cylinder is feasible
- Certainly not, the unit pressure difference is very big, not applicable..There must be no seal conditions.
- Q:What is the size of the hydraulic elevator platform for 2T
- Stationary hydraulic system of hydraulic lifting platform products sets for commonly, overload, power outages and other safety protection device, guide rail type of external power unit, mesa adopts import and export or bar, fence, and all sorts of lifting platform running warning lights or warning bell, the door is open to the safety of the lifting platform closed circuit switch, and many other functions. The operator has a lot of control, point movement or safe mode operation.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Forklift manned platforms-NK30
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords