Self-Propelled Telescopic Boom Lifts
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Introduce:
The product is mainly applied in the building fields, bridge-constructing, shipping-made, airport, mine, port and dock, constructing of correspondence and electric power and fixing of outdoor-ads. Working range is extensive, it can be used in rugged terrain. CE certified.
1)Structure: telescopic boom ,continuous turntable can rotate 360 degree, good horizontal tractility.
2)Sole control system, the engine adopts Europe NO.3 standard emissions. CAN BUS control the operation.
2)Sole control system, the engine adopts Europe NO.3 standard emissions. CAN BUS control the operation.
3)Gradeability:40%.
4)The front bridge is using the design of swing bridge, the maximum speed is 6.5km/h.
5)Tilt protection and safety-interlock setting.
6)Using emergency hydraulic-pump devices to achieve emergency functional decline.
7)Drive mode : 4×4 and 4×2.
Parameters:
MODEL | GTBZ 16S | |
Max.working height | m | 15.72 |
Max.platform height | m | 13.72 |
Max.horizontal reach | m | 11.18 |
Below ground reach | m | 1.5 |
Platform length | m | 1.8 |
Platform width | m | 0.76 |
Height-stowed | m | 2.5 |
Length-stowed | m | 8.5 |
Length-transport | m | 6.9 |
Overall width | m | 2.3 |
Wheelbase | m | 2.2 |
Ground clearance |
| 0.32 |
lift capacity | kg | 230 |
Platform rotation | 160° | |
Turntable rotation |
| 360° continuous |
Drive speed-stowed | km/h | 6.5 |
Drive speed-raised or extended |
| 1.1 |
Gradeability-2WD-stowed | % | 30 |
Gradeability-4WD-stowed |
| 40 |
Turning radius-inside | m | 2.1 |
Turning radius-outside | m | 4.8 |
Weight | kg | 6950 |
- Q: How does hydraulic platform change sealing ring, how to operate
- Dismantled after checking in parts, parts should be stored in a clean environment, and add to prevent knock against the isolation device, with professional pliers to take out the seal, after installing the new seal, again before assembly, parts should be cleaned.
- Q: What is the reason for the automatic lowering of the hydraulic platform
- The overflow valve opens and closes and is not properly closed, and checks for leaks.
- Q: There is no elevator on the 7th floor of the home to install a lift or lift
- What do you want to do? Can you agree to install these things? These later additions can only be set outside the building, affecting the fire channel.
- Q: The design of graduation is designed for mobile shearing and hydraulic lift
- Hello, jinan Long Hao hydraulic machinery co., LTD. Is specialized in the production of portable shear fork type hydraulic lift 】 【 high quality manufacturer, jinan Long Hao machinery can also be customized according to customer requirements of various special types of elevator
- Q: The single fork hydraulic lift platform
- According to your description, should be three four-way solenoid valve core card death return, can wash the unwrapped solenoid valve, check valve core have any injury, if the strain suggest replace the solenoid valve, hydraulic elevating actually single stage it is best to use support valve as a control valve, the failure rate will be lower,
- Q: To make a four trapezoid screw lifting up seven tons of lifting platform should be matched with the straight screw and motor
- Can be judged according to the accuracy requirement of lead screw grinding or rolling, depending on the load and its acceleration can choose servo power right away and screw the maximum load capacity (do longer engineers can intuitive judgment the diameter of the screw and large), so that you can around the power of the servo motor of the different speed and different lead screw to match, so there will be several different schemes: high speed servo motor with small lead screw (sometimes deceleration machine), big inertia servo with lead screw. Under the condition of the machine cost to determine, from two to three scheme choice, choice of method is to choose low cost, with high stability, cost effectiveness and cost are the same common and suppliers have a spot. If the single from choose the ways of the servo and screw usually have an intuition, like 3000 revolutions of servo goods on the market the most sufficient, screw is according to the supplier's inventory.
- Q: Why is the large laser engraving machine plus half the platform?
- Large laser machine, it is a large laser cutting bed, like JQ1325 machine part of the lifting machine, this machine Jin Jiang the engineers of laser CNC equipment co., LTD., the original design, is one part in order to meet both to cut, also want to carved a small scale, especially the cylinder engraving of customer demand, customers to buy a machine to go back to his hope own machines function more many more good, of course, lift the main functions of two points, with a rotating aid carved small cylinder (bamboo tube, glass, etc.), the other is carved thickness change a lot of material, such as different sizes of the wooden box. Plank cut, because plate thickness general change is not too big so lift also is not necessary.
- Q: What device is better to design a platform that is 1 square meter or so?
- It's not clear what your specific application environment is, so you're not sure how to provide specific solutions.
- Q: How to improve the oil leakage line
- The reason of oil leakage is complicated, mainly due to the quality of the hydraulic components, vibration, corrosion, differential pressure, pipeline connection, use of improper maintenance. Elevator oil leak inside leakage and leakage. A small amount of oil is inevitable, because of the nature of the hydraulic drive. Spill in excess of the prescribed index of the phenomenon is due to leakage, generally can immediately perceptible, mainly are now the pressure drops, rapid speed of change has been ground or surface of product oil, machine equipment need often fill oil to return to the height of the aerial work platform before. Once the leak is due to be shut down, the acute operation will only take the system out and damage the engine parts.
- Q: The hydraulic cylinder with hydraulic platform is changed to whether the cylinder is feasible
- The pressure cylinder is very close, the hydraulic cylinder is not suitable to change to the cylinder, the change is equal to make a new cylinder.
Send your message to us
Self-Propelled Telescopic Boom Lifts
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords