Foldable Cages / Portable Cages / Scaffolding system
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 100 pc
- Supply Capability:
- 10000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Foldable Cages / Foldable Store / Scaffolding system
Product Description:
Foldable cages are widely used in construction projects,especially when there are many accessories to move about and store.The foldable cages can save your space also make the delivery easier.
Advantages:
Main advantages as bellow
1).foldable--also easy to set up
2).easy to ship--low ship cost
3).space save--easy to store
4).easy to move--wheels can be added
Use:
Scaffold cage is designed to attach into the storage rack creating the basket for storage of smaller scaffold items like clamps and accessories.You may find it helpful during the storage and building process.
Material:
Q235 Q345
Finishing:
1.Hot dip galvanized
2.painted
FAQ:
Q: Samples?
Sample free, customer pay freight first time.
Q: Delivery?
10-30days according to the order qty.
Q: Payment?
T/T L/C at sight.
- Q:What is the distance from the external walls of the scaffolding and scaffolding?
- Under normal circumstances, horizontal horizontal bar extension does not exceed 300mm
- Q:Why the height increase of ten centimeters increase in housing ten percent
- Increase the cost of ten centimeters increase in housing costs by about three percent
- Q:How to do a good job in typhoon prevention work in rural areas?
- Listen to weather forecasts, reinforce Dapeng and other infrastructure, to prevent lightning, to quickly cut off all kinds of electrical power
- Q:What is the most important safety hazard at the construction site?
- Civilized construction Site fencing Some works in the urban area of ??the main section of the site is not set above the 25m fence some site fence material is not strong, unstable, not clean, do not meet the local aesthetic requirements
- Q:Construction technology measures fee is directly into the sub - project costs
- Construction technology measures fee is not directly into the sub-project costs, because the construction technology measures fees are measures fees rather than sub-project costs, measures fees, refers to the completion of the project construction, occurred in the construction and construction The cost of non-engineering entity projects during the process consists of construction technical measures and construction organization measures
- Q:is there a significance to hester's viewing the crowd from atop the scaffold in the book the scarlet letter?
- yes - she is looking down on them after years of them looking down on her because of her adultery
- Q:Two window washers, Bob and Joe, are on a 3.00 m long, 380 N scaffold supported by two cables attached to its?
- Oh, Ashley, you can't fit more than an intro in the what would you like to ask. More room in details.
- Q:There is no shelter outside the scaffolding project has been accident accident case
- When the construction unit dismantles the top steel formwork, the 18 steel pipes (4m long) and the fasteners are removed to the hanging plate of the frame, and five workers fall from the roof with the hanging plate
- Q:Seeking construction machinery safety supervision papers can be greater than 100 words
- Seeking construction machinery safety supervision papers can be greater than 100 words
- Q:I'm still at school and if I got my scaffolding done at the start of the summer holidays it would have 6 weeks to heal, I would have to take it out once a week for 2 hours, would I experience any issues?
- They take 9-12 months to heal and an unhealed piercing should never be removed. Yes, you would experience issues. It would likely close or shrink in size or if it somehow didn't then you could easily cause infection, irritation, prolonged healing, hypertrophic scarring...nothing you should be willing to risk. 6 weeks is far from being long enough.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Foldable Cages / Portable Cages / Scaffolding system
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 100 pc
- Supply Capability:
- 10000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches