• Scaffolding System-Universal Screw Jack for wide using CNBM System 1
  • Scaffolding System-Universal Screw Jack for wide using CNBM System 2
Scaffolding System-Universal Screw Jack for wide using CNBM

Scaffolding System-Universal Screw Jack for wide using CNBM

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t
Supply Capability:
3000 m.t/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Quick Details

  • Model Number: CS-BA

  • Type: Scaffolding Parts, Hollow

  • Scaffolding Part Type: Scaffolding jack

  • Material: Steel

  • Surface: Paint/electro- (hot dipped) galvanized or to be ordered

Packaging & Delivery

Packaging Details:Pallet

Delivery Detail:According to order quantity

2.Product Description

Model No: RS-BR

Product Name: Steel Board Bracket "O" For Ringlock Scaffold

3.Feature:

1) Main material: steel round tube

2) Specification(mm): 390/730(W)

3) Surface: painted/galvanized or to be order

4) Also can manufacture it as your requirement

4.

Ring   Lock System Scaffold Side Bracket

Model

Description

Weight(kg)

Weight(lbs)

AR.SB.400

Ring Lock Side Bracket 400mm (1'4")

4.88

10.77

AR.SB.650

Ring Lock Side Bracket 650mm (2'2")

6.72

14.81

AR.SB.880

Ring Lock Side Bracket 880mm (2'11")

8.12

17.91

AR.SBW.400

Ring Lock Side Bracket (Wall) 400mm (1'4")

4.82

10.62

AR.SBW.650

Ring Lock Side Bracket (Wall) 650mm (2'2")

6.72

14.82

AR.SBW.880

Ring Lock Side Bracket (Wall) 880mm (2'11")

8.36

18.44

5.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Scaffolding System-Universal Screw Jack for wide using CNBM

Q: Will the scaffolding steel pipe specifications are generally how much ah? What are the specifications?
scaffolding load shall not exceed 270kg / m
Q: How to carry out fire inspection at construction site construction site (including information and site)
the construction unit should establish fire safety management organizations and voluntary organizations, and clear responsibility and responsibility
Q: so im 16 and only got into piecings within like the last year...iv only got my belly done, but iv been in love the scaffold piercing for ages, but im just wondering whether it would look really odd if i got it as it would be the only ear piecing i had, opinions??(and yes if i got it done i would go to a reputable place)
I pierce lots of Industrials on young girls and half of them say its their first piercing! They look great on a plain ear, because they are such a large piercing its good to have ears that arent covered in piercings already because it starts to look too much when you have heaps of piercings in your ears. You just need to be dedicated to it as it can be difficult to heal, so make sure you have a really good think about it before you get it done.
Q: a paintbrush falls from a scaffold takes 3 sec to hit the ground. How high is the scaffold? Explain pls!?
1) In three seconds the paintbrush accelerated to a speed of 96 feet/sec (ignoring air resistance) at a acceleration of 32 feet/sec/sec. 2) It started at a speed of zero, so the average speed for those three seconds was 48 feet/sec. 3) 3 seconds times 48 feet/sec. equals 144 feet.
Q: What is the bamboo board for the scaffolding of the building?
Wooden foot Shouban, bamboo scaffold (including bamboo string board, bamboo fence board) Involving the scaffolding of the main norms are "construction fastener steel scaffold safety technical specifications" JGJ130- "construction scaffolding safety technical specifications" JGJ164-2008 and so on.
Q: A 531 N window washer is standing on a scaffold supported by a vertical rope at each end.The sca?old weighs 332 N and is 3.5 m long.Assume the window washer stands 1.36 mfrom the left end.What is the tension in the rope on the right?Answer in units of NWhat is the tension in the rope on the left?Answer in units of N
(332 N)×(3.5 m)/2 + (531 N)×(1.36 m) = (3.5 m)×R R = 372.3 N < - - - - - - - - -tension in the right rope (531 N) + (332 N) = (372.3 N) + L L = 490.7 N < - - - - - - - - - tension in the left rope
Q: For many years did not renovate the old house, the original is the kind of cement outside the gray, remove the gray + with cement and sand tiles, no glue, this method a square hand fee how much money? The original wall is to take the line, how to deal with. The local master said the line and the socket lifted up temporary hanging, finished tiles to say, can be decorated to electricity, I always feel this method is not safe, there is no better way?
Hello, "farmers from the building, the most important is the quality and safety
Q: There is a 6.0-kg pail of paint to one side.How close to the left end can he approach safely? How close to the right end can he approach safely? Can someone help me with this problem, I keep working and reworking it and coming to the same answer. I must be consistently making the same mistake. If someone can help me work through it I would really appreciate it. The answers I got were:Left: dmin, left = .54mRight: dmin, right = .77m
At the threshold of danger, the tension on the far rope reaches zero. (a) Distance from left edge = x; then summing moments about the left rope gives ΣM = 0 = 71.0kg * g * (1m - x) - 22.0kg * g * 2.0m - 6.0kg * g * 1m The g term cancels, and the rest solves to x = 0.296 m ? (b) Distance from right edge is X; summing about the right rope, and knowing the g terms will cancel, ΣM = 0 = 22.0kg * 2m + 6.0kg * 3m - 71.0kg * (1m - X) leads to X = 0.127 m ? Hope this helps!
Q: Renovation of construction guidance? (Refers to the carpentry, painters, mud and other approach to the entry. Tooling)
First, into the construction site personnel safety production notes
Q: 2009 and 2010 construction of secondary construction division of the exam questions and answers, Jiqiu ~!
(Construction project) single multiple choice questions (a total of 20 questions, each question 1 points

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords