• Scaffolding System-Universal Screw Jack for wide using CNBM System 1
  • Scaffolding System-Universal Screw Jack for wide using CNBM System 2
Scaffolding System-Universal Screw Jack for wide using CNBM

Scaffolding System-Universal Screw Jack for wide using CNBM

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t
Supply Capability:
3000 m.t/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Quick Details

  • Model Number: CS-BA

  • Type: Scaffolding Parts, Hollow

  • Scaffolding Part Type: Scaffolding jack

  • Material: Steel

  • Surface: Paint/electro- (hot dipped) galvanized or to be ordered

Packaging & Delivery

Packaging Details:Pallet

Delivery Detail:According to order quantity

2.Product Description

Model No: RS-BR

Product Name: Steel Board Bracket "O" For Ringlock Scaffold

3.Feature:

1) Main material: steel round tube

2) Specification(mm): 390/730(W)

3) Surface: painted/galvanized or to be order

4) Also can manufacture it as your requirement

4.

Ring   Lock System Scaffold Side Bracket

Model

Description

Weight(kg)

Weight(lbs)

AR.SB.400

Ring Lock Side Bracket 400mm (1'4")

4.88

10.77

AR.SB.650

Ring Lock Side Bracket 650mm (2'2")

6.72

14.81

AR.SB.880

Ring Lock Side Bracket 880mm (2'11")

8.12

17.91

AR.SBW.400

Ring Lock Side Bracket (Wall) 400mm (1'4")

4.82

10.62

AR.SBW.650

Ring Lock Side Bracket (Wall) 650mm (2'2")

6.72

14.82

AR.SBW.880

Ring Lock Side Bracket (Wall) 880mm (2'11")

8.36

18.44

5.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Scaffolding System-Universal Screw Jack for wide using CNBM

Q: A 531 N window washer is standing on a scaffold supported by a vertical rope at each end.The sca?old weighs 332 N and is 3.5 m long.Assume the window washer stands 1.36 mfrom the left end.What is the tension in the rope on the right?Answer in units of NWhat is the tension in the rope on the left?Answer in units of N
(332 N)×(3.5 m)/2 + (531 N)×(1.36 m) = (3.5 m)×R R = 372.3 N < - - - - - - - - -tension in the right rope (531 N) + (332 N) = (372.3 N) + L L = 490.7 N < - - - - - - - - - tension in the left rope
Q: I live on a 2nd floor apartment with gorgeous, huge, arched windows. Until a week ago, we had a lovely view of a tree-lined street in NYC, but my building just installed a scaffolding which almost acts as a balcony for us. Our view is gone, and there is definitely a safety issue as anyone could climb off the scaffolding into our apartment through the windows. The windows are so old, and cannot fully lock unless wedged shut - and then we cannot open them for any kind of ventilation.There is work being done on the building and the super says the scaffolding will be up for at least a year.As a tenant, what rights do I have? I want to call my landlord and ask for a rent reduction as these windows were a huge spelling point at the time of rental. I am also worried that someone will enter my apartment during the day when I am not here. We have been here happily for 5 months, but this is really upsetting. Any advice on what I should do?
explain to your land lord the problems you are facing because of the old windows. i hope he understands you otherwise vacate the house and search for a new one. some companies also insurance for renters.go for it. i hope my answer helps you. all the best!
Q: For many years did not renovate the old house, the original is the kind of cement outside the gray, remove the gray + with cement and sand tiles, no glue, this method a square hand fee how much money? The original wall is to take the line, how to deal with. The local master said the line and the socket lifted up temporary hanging, finished tiles to say, can be decorated to electricity, I always feel this method is not safe, there is no better way?
Hello, "farmers from the building, the most important is the quality and safety
Q: Construction technology measures fee is directly into the sub - project costs
Division of project costs only include human labor costs, materials, machinery, business management fees and profits
Q: What is the speed of the falling brush after2.67 s? (Neglect drag forces.) The accelera-tion due to gravity is 9.8 m/s2.Answer in units of m/s.
... v = a t = -9.8 m/s/s * 2.67 s = 26.2 m/s round appropriately When you get a good response, please consider giving a best answer. This is the only reward we get. You may have to wait an hour to award BA.
Q: Such as the title, raw materials and structural parts What is the difference, how to divide?
There are columns: pipe pile, frame column, independent column, structural column, Cylindrical, L-shaped columns; brick columns, concrete columns, wooden columns Beam: frame beam, connecting beam, over beam, ring beam, cantilever beam, curved beam; steel beam, wooden beam, concrete beam Plate: cast-in-place board, prefabricated flat plate, prefabricated hollow plate; reinforced concrete plate, wood board Wall: brick wall, concrete wall, roof daughter wall, light partition Doors: solid wood doors, plywood doors, steel doors Windows: steel windows, wooden windows, aluminum windows, steel windows Building accessories are construction and construction components other than building blocks, such as scaffolding, pipe thread regulators for construction, construction bars, triangular construction supports, and steel joints
Q: Is it necessary to use a mat on the floor? Is that norm prescribed?
Scaffolding erection specification staff up and down and transport materials When lifting the weight with the lifting device, it is not permissible to connect the lifting device and the scaffolding structure set up scaffolding work leaders should take the scaffolding to pass the test and issued a written proof of the use of the prospective use The person in charge of the maintenance work should check the status of the scaffolding and scaffold used daily, and if necessary, refurbish immediately is strictly prohibited with hand barrels, wooden boxes, bricks and other building materials take temporary plate to replace the regular scaffolding scaffolding on the prohibition of random wire Must be installed temporary lighting lines, wood bamboo scaffolding should be added insulators, metal pipe scaffolding should be another wooden cross the installation of metal pipe scaffolding, prohibit the use of bending, flattened or cracked pipe, the successive parts of each tube to be intact, to prevent dumping or moving metal pipe scaffolding of the pole, must be vertically placed on the plate, in the placement of the floor before the ground to consolidate, leveling The pole should be fitted with a pillar, which is made of a pillar base and a pipe welded to the floor metal pipe scaffolding joints, the application of special hinges overlap each other, this hinge for right angles, but also for acute and obtuse (for bracing, etc) The hinge bolts connecting the various components must be tightened scaffold board must be fixed in the metal pipe scaffold on the beam when moving scaffolding, the scaffolding of all staff must be down, above the work of the scaffolding prohibited to move.
Q: Also if its possible part B wants to know A ball thrown vertically upward is caught bythe thrower after 2 s.Find the initial velocity of the ball. Theacceleration of gravity is 9.8 m/s2Answer in units of m/sFind the maximum height it reaches.Answer in units of m
Use, Vf = Vo + g * t With Vo = 0 , Vf = g * t = 9.8 m/s^2 * 3.39 s = 33.222 m/s. part B, use the same equation, but take into consideration to watch for direction and adopt a convention. As before we have considered +ve for downward direction. Now Vf = 0 0 = Vo + g * t. Vo = - 9.8 m/s^2 * 2 s = -19.6 m/s . Negative means upward direction according to the adopted convention.
Q: What is the distance from the external walls of the scaffolding and scaffolding?
Under normal circumstances, horizontal horizontal bar extension does not exceed 300mm
Q: Seeking real estate development project emergency rescue plan, the word asked a little more. Thank you
In order to prevent the occurrence of production safety accidents at the construction site, improve the emergency working mechanism, in the event of the accident occurred in the project, the rapid and orderly emergency rescue work to carry out the accident, rescue the rescue project, the construction of the project site safety accident emergency plan The wounded, reduce the loss of the accident, the development of this plan

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords