• Q345 Foldable Cages /  Q345 Portable Cages System 1
  • Q345 Foldable Cages /  Q345 Portable Cages System 2
  • Q345 Foldable Cages /  Q345 Portable Cages System 3
  • Q345 Foldable Cages /  Q345 Portable Cages System 4
Q345 Foldable Cages /  Q345 Portable Cages

Q345 Foldable Cages / Q345 Portable Cages

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
50 pc
Supply Capability:
10000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Q345 Foldable Cages / Q345 Portable Cages


Product Description:

Foldable cages are widely used in construction projects,especially when there are many accessories to move about and store.The foldable cages can save your space also make the delivery easier.


Advantages:

Main advantages as bellow

1).foldable--also easy to set up

2).easy to ship--low ship cost

3).space save--easy to store

4).easy to move--wheels can be added

 

Q345 Foldable Cages /  Q345 Portable Cages

Q345 Foldable Cages /  Q345 Portable Cages

Q345 Foldable Cages /  Q345 Portable Cages

Q345 Foldable Cages /  Q345 Portable Cages

 

Use: 

Scaffold cage is designed to attach into the storage rack creating the basket for storage of smaller scaffold items like clamps and accessories.You may find it helpful during the storage and building process.

 

Material: 

Q235 (and also Q345 available).


Finishing: 

Hot dip galvanized 

Painted with color.

 

What's our advantage?

(What can we do for you?) 

    1.ensure the quality of the vinyl banner and avoid extra expenses for customers.    

    2.provide you the professional design team.    

    3.provide fashionable and newest styles for you.    

    4.design the artwork for you.    

    5. Please feel free to customize.


Q: Will the scaffolding steel pipe specifications are generally how much ah? What are the specifications?
scaffolding load shall not exceed 270kg / m
Q: What would you like to ask?At what height do scaffolds have to be engineered?
At all heights...they are engineered as a system.
Q: Seeking the Responsibility System of Safety Responsibility of Each Function Department Garden company for safe production permit
The responsibility system, policies, laws and regulations for the safe production of the production safety departments, and the actual development of the company's safety production, civilized construction and environmental management in line with the actual implementation of the company's safety production responsibility system
Q: There is no shelter outside the scaffolding project has been accident accident case
When the construction unit dismantles the top steel formwork, the 18 steel pipes (4m long) and the fasteners are removed to the hanging plate of the frame, and five workers fall from the roof with the hanging plate
Q: Construction technology measures fee is directly into the sub - project costs
Construction technology measures fee is not directly into the sub-project costs, because the construction technology measures fees are measures fees rather than sub-project costs, measures fees, refers to the completion of the project construction, occurred in the construction and construction The cost of non-engineering entity projects during the process consists of construction technical measures and construction organization measures
Q: Such as the title, raw materials and structural parts What is the difference, how to divide?
It is the main component form of a house
Q: A man is 2 ft from 1 end of a 6 ft plnk spprted at each end by scaffold. How much wght is spprted at each end?
the 4 ft end will support 66,66% of the weight and the 2 ft end will support 33,34% of the weight
Q: Also if its possible part B wants to know A ball thrown vertically upward is caught bythe thrower after 2 s.Find the initial velocity of the ball. Theacceleration of gravity is 9.8 m/s2Answer in units of m/sFind the maximum height it reaches.Answer in units of m
Use, Vf = Vo + g * t With Vo = 0 , Vf = g * t = 9.8 m/s^2 * 3.39 s = 33.222 m/s. part B, use the same equation, but take into consideration to watch for direction and adopt a convention. As before we have considered +ve for downward direction. Now Vf = 0 0 = Vo + g * t. Vo = - 9.8 m/s^2 * 2 s = -19.6 m/s . Negative means upward direction according to the adopted convention.
Q: 2009 and 2010 construction of secondary construction division of the exam questions and answers, Jiqiu ~!
2009 and 2010 construction of secondary construction division of the exam questions and answers, Jiqiu ~
Q: What is the vertical transport of construction and the high increase in fees
In the contract of the project, the construction unit is paid a fee for the construction unit

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches