• Famous Hoist Motor Price of Tower Crane for Sale System 1
  • Famous Hoist Motor Price of Tower Crane for Sale System 2
  • Famous Hoist Motor Price of Tower Crane for Sale System 3
  • Famous Hoist Motor Price of Tower Crane for Sale System 4
  • Famous Hoist Motor Price of Tower Crane for Sale System 5
Famous Hoist Motor Price of Tower Crane for Sale

Famous Hoist Motor Price of Tower Crane for Sale

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Descriptions of our Famous Hoist Motor Price of Tower Crane


1, the topless tower crane reduce the dismounting requirements, lower weight, low mounting height, dismount each mast at a time in the air, save the labor cost, safety and fast.

2, it is suitable for crossover work of the cranes, without the tower cap and pull rod, the safety will be increased when there need the crossover work.

3, It is suitable for the special requirement about the height, such as airport nearby, tunnel, workshop ,and the construction site with high-tension cable.

4, It is suitable for the construction site that has the requirement about the crane boom, it can be used as internal climbing crane in the high-rise buildings, irregular roof or small areas.

5, It is very convenient for dismounting in the restricted construction site, dismount each crane boom at a time by manual.

6, The steel structure of crane boom has long using life and high safety standard.

7, The crane boom is good applicability, high-usage,the design of the topless tower crane boom is easy for realizing the serialization and standardization. Reduce the design and making cost.

8, Low design cost, short cycle, can much better satisfy the multiple demands of the customers.


Advantage of our Famous Hoist Motor Price of Tower Crane


1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.


Features of our Famous Hoist Motor Price of Tower Crane

Independent height (m)

31.5

Max height with attachment (m)

110

Working range can be adjusted(m) 

38/43/48

Min working range(m) 

2.25

Max lifting capacity(t)

4

Tip load @ 48m(t)

0.8

Hoist mechanism

Falls

2

4

Lifting capacity(t)

1

2

2

2

4

4

Speed(m/min)

70

35

7

35

17.5

3.5

Motor

YZTD225M2-4/8 /32    15/15/3.5KW

Trolleying mechanism

Speed(m/min)

20/40

Motor

YDEJ100-4 /8   2.4/1.5KW

Slewing mechanism

Speed(r/min)

0-0.6

Motor

YD132S-6/8  2.4/1.8KW

Climbing speed(m/min)

0.4

Counterweight(t)

7.6

Mast section size(L×W×H)m

1.4×1.4×2m

Working temperature

-40-+60°C

Total power (KW)

23

Power supply requirement (KVA)

115KVA for generator

Cable type ( within 30 meters from site power source to lower

 electric box of tower crane )

25mm2(3+2, 5 cores)

Startup voltage & current

380V×95%=361V       180A

Rated working voltage & current

                      380V/65A

 

Famous Hoist Motor Price of Tower Crane for SaleFamous Hoist Motor Price of Tower Crane for SaleFamous Hoist Motor Price of Tower Crane for SaleFamous Hoist Motor Price of Tower Crane for SaleFamous Hoist Motor Price of Tower Crane for Sale


Famous Hoist Motor Price of Tower Crane for Sale

FAQ Topkit Cranes Rental Tower Crane Specification

1. why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.   

Q: How does a crane get down from a skyscraper once they're done using it? Like the crane on top of the skyscraper, do they get take it apart?
Can only be assumed that the jibs are first dismantled then the actual crane base lowered down by a second crane or even helicopter
Q: Just wondering i am so confused
It's a crane thing. Seriously though - overhead crane, gantry or polar crane!
Q: its dead im so scared if thes so called flys i tired to kill it but wen ever i get some thing to kill it its hideing
Crane flies, also known as mosquito eaters or mosquito hawks, are harmless. There is no reason to fear them. They do not bite or feed on anything and only live a short time, maybe 24 to 48 hours. I have them in my house quite frequently during March and April. They fly really slowly and don't try to fly away if you want to smack it with a flyswatter. They are big and ugly but that's about it. They seem to be more active at night and are attracted to light, kind of like moths. Maybe you could lure yours out of your room by leaving a light in the hall and other rooms dark.
Q: I'm just curious about it, and i need it for a fan fiction story i'm writing. thanks ^__^
Yes. It is genetically coded into japanese children before birth. As soon as they are born they know how to fold paper cranes. But it takes a couple of years for them to develop the hand coordination to actually do it.
Q: What does "slewing up" and "under rotating" in the slewing form of a tower crane mean?
As for the reasons, the main consideration is the actual needs.
Q: What does the crane mean to the Korean people?
The crane mates for life. Most birds do not and very few mammals. So it is a symbol of fidelity and faithfulness or loyalty to one's chosen mate. They are also very long-lived, up to 70 years in captivity, and so are symbols also of longevity. See nationalzoo.si.edu/Animals/Birds/...
Q: What is the admissible weight of a crane?
Depends on how it is transported - you have to give more information on the kind of crane and where it will be used.
Q: What is the fundamental differences between Goju-ryu Karate and Fujian White Crane?
Actually the fundamental difference between all styles of Karate and all styles of kung fu is that Karate emphasizes linear striking techniques and kung fu emphasizes circular striking techniques. All Japanese influenced 'atemi' (striking) styles are linear. That is one way to identify the lineage of an Asian martial art, if the punches and kicks are thrown straight.
Q: when a skyscraper is done being built, how does the crane come down?
Most probably you are referring to the Tower Crane. Interesting questions should have followed, like: How is it constructed while the construction is in progress? How is the placement of the Tower Crane determined? What happens to the space occupied by the Tower Craneafter work completion? How far should the 'boom' (the arm that has a moving pulley) go? Anyway, your question is a good one, because when I had my first construction work, the Tower Crane was already there and I was thinking of how to dismantle it afterwards. The dismantling process, is done part by part, set by set starting from the top going down. Another interesting question is: How would that excavating truck or bulldozer be able to get out of that deep matt excavation after all excavation works have been accomplished? It is interesting to note that an earth ramp is created while excavation progress, until the machine is down deep in the excavation and seems that it is impossible for it to get out after excavation work is done?
Q: Two cranes are lifting identical steel beams at the time.One crane is putting out twice as much power as the other assuming friction is neglible, what can you conclude is happening to explain this difference?
One crane is lifting the beam twice as fast as the other. The amount of energy required (work done, in Joules) to lift a mass m through a distance h against gravitational acceleration g is simply W=mgh. But power is the -rate- at which energy is used (or work is done in Joules/sec). So a crane that is twice as powerful should be raising the beam twice as quickly. Doug

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords