Excellent Performance Swivel Scaffolding Swivel Couplers
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 20000 pc
- Supply Capability:
- 300000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details:
Place of Origin:Hebei China
Model Number: GTJ-002
Type: Scaffolding Parts
Material: Q235
Weight: 0.58kg to 0.65kg
Surface Treament: as your requirements
Packaging & Delivery:
Packaging Detail: CARTONS THEN ON PALLET,OR AS YOUR REQUEST.
Delivery Detail: WITH IN 25 DAYS
Product Information
Product Name | Japanese Type Swivel Scaffolding Couplers |
Type | GTJ-S002 |
Material | Q235 |
Thickness | 2.5mm or 3mm |
Weight | 0.58kg or 0.65kg |
Surface Treatment | Electroplate Galvanized |
Products’ standard | Fit for JISA8951 |
Dimensions | 48.6 x 48.6mm |
MOQ | 10000PCS |
Product feature | anti-rust, skid proof, high breaking strength |
Cup-lock Scaffolding Specification:
Packaging Detail: vinner case,20ft,21T/GP,by sea;or welded on the cup lock vertical then bundle on steel pallet or Customer needs.
Delivery Detail: 1 month after the contract or as customer's requirement.
GREAT REPUTATION CUP LOCK SCAFFOLDING
Three Year Warranty
Operating Friendly
Full Safety Devices
Provide OEM service
Reasonable price
Advantages of using CNBM coupler system
Increasingly, the use of mechanical couplers has been recognised by engineers and contractors to bring about benefits that can accelerate construction speed, increase productivity and simplify design details.
couplers save on lap lengths and could result in lower construction cost
Enhances construction speed by replacing the slow and tedious traditional methods of planting starter bars (e.g. boxing-out or drilling through formwork in wall construction, planting of starter bars into the soil in top-down construction)
Reduces congestion in lap zones, thus enhancing concrete flow.
FAQ of Ring-lock Scaffolding:
Consent Authority (BCA) for the issue of a Building Consent or a Code Compliance Certificate in relation to the Building Act 2004, as well as these Best Practice Guidelines, should be considered to ensure that all practicable steps are taken to assure the safety of the structures and of end users.
- Q:I really want a scaffold piercing and I can pay for it, I get good grades, I do all the chores I have to do, I spoke to them calmly and everything. Yet they still won't let me. My dad said that I will be grounded forever and everything but last time I got grounded, I went to a party the next day so what should I do?
- dont do it. when your parents say grounded, you may be let off easy but if is about your body then if you get it your in deep ****. also your parents could see this question and then you would be in even more trouble. please dont get it. also things like that are really hard to hide from parents. if your 18 years or older llegally they cant stop you from doing it. i dont think you should do it.
- Q:Im 18 years old and maleI have 4 piercings. On my left I have my lobe and a double helix (a type of cartilage piercing). On my right I have a scaffold/industrial. I know I want another piercing on my right ear, but cant decide what to get. Any input is greatly appreciated.
- conch would look great and not make it look to cluttered go for it :)
- Q:i had my scaffold piercing done in the summer holidays and wen i went back to school (currently in my last year) they told me to take it out so i had to go back to the piercer. They changed the bar to two clear retainers in the holes so they wouldn't heal, now it hurts all the time and is red with a bubble on the top of my ear, any suggestions as to what i should do? :/
- regularly clean it with salty lukewarm water and cover it up with tape
- Q:hi guys i got my scaffold piercing a couple of days ago and it keeps bleeding on and off and there was dry blood but i removed it and its bleeding more what could i do step by step to keep total care of my piercing to get rid of all these problem please help it will really be appreciated
- leave the dry blood let it heal be patient
- Q:How to maintain the scaffold after use
- To the current structure of the scaffolding parts rust, rust treatment, where the humidity of the region (greater than 75%) once a year, once a year should be painted once again. Fasteners to oil. Galvanized steel. Where there is no zinc plating, should be cleaned after each use kerosene, oil coated rust.
- Q:This is an answer to irreducible complexity. Are there any examples that we see in animals or organs? or on the cellular level? Are vestigial organs a form of quot;scaffoldingquot; that are in the process of being removed?
- The classic demonstration was in the E. coli long term experiment. A strain gained the ability to metabolize citric acid after 31,500 generations. Culturing preserved strains from 15,000 and 20,000 generations showed that there was an event that occurred in between that enabled the later conversion to citrate metabolism.
- Q:I'm a civil engineering student and we were asked to submit a paper about designing a simple scaffolding. I just want to see a sample paper so that I would know what details should I include.
- can't draw here, but it's just an x with a flat board on top in 3 dimensions.
- Q:Can you do the outer scaffolding?
- (4) the lower part of the inclined bar at 30 cm in height from the ground and control connection pole. (5) according to the height of the structure and the length and the width of the scaffold, it should be combined with the actual situation in the construction to set up the scissors and the diagonal brace. (6) the scissors rod connected by the lap, lap length not less than 100 cm, and not less than 2 rotating fastener, rod end edge to the distance of the fastener cover more than 10 cm. 8, laying the scaffolding board (1) scaffold set level in 3 horizontal bar, and the two ends at 8 cm with a diameter of 1.2 mm galvanized wire hoop around the 2 to 3 ring fixed. When the scaffold length is less than 2 meters, the two small bar support.
- Q:I have to write a 1 page commentary on a geographical issue for school, and, I've never done that before.Could someone please tell me or link me to a very simple 'writing commentary' scaffold for beginners?Please?Thankyou :)
- A vegan alcoholic! A chuckle emerges, a laugh perhaps for a few more bobs. Absent the mind, nicely put.
- Q:i am getting my industrial (scaffold) pierced on one ear and i want my cartilage on the other ear, how long do i have to wait between them? What are pros and cons for industrial (scaffold)? what are risks and stuff and how much is it? i want to get it so any information or anything i should know would be great thanks especially for industrial:)
- You can have both done in the same day if you can handle the pain and shock. Get the industrial done first, and if you still feel OK afterwords, you can get your other ear done by the same piercer. Talk to him/her and let them know what you want to do before you start. If you feel like you need to wait after the industrial, wait at least a day before getting the second piercing. It's all about what you can handle.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Excellent Performance Swivel Scaffolding Swivel Couplers
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 20000 pc
- Supply Capability:
- 300000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords