Excavator Mounted Hydraulic Breaker Chisel
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 200 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Excavator Mounted Hydraulic Breaker Chisel
We are a manufacturer specialized in the hydraulic breaker with superior quality, We also supply other concerned hydraulic spare parts including main body assembly, the back head, cylinder assembly, front head, piston, reversing valve, oil seal retainer and etc. Our products can be used for Komatsu, Hitachi, Kobelco, Kato, Sumitomo, Hyundai, Volvo excavator, etc.
Advantage:
(1) Use the highest strength material to get better wearing resistance.
(2) Easy maintenance, prolonged life.
(3) We have accumulated sales of 20, 000 units, rich maintenance experience.
(4) The warranty period is 1 year.
Description:
Hydraulic rock breaker is powered by an excavator or loader pump provides pressure oil, it can dig a fundamental role in building a more efficient clean up floating rock crevice in the rocks and soil. Optional hydraulic hammer excavator model is based on the principle of the operating environment to choose the most suitable hydraulic rock breaker
Hydraulic breaker has become an important tool for the job, it was installed in the hydraulic breaker backhoe loaders (also known as two busy) or wheel loader for crushing operations. Excavator Hydraulic Breaker, also known as hydraulic breaker or hydraulic rock breaker (Excavator Hydraulic Breaker).
Specification:
Exvacator breaker technical paramaters | ||||||||
TRB680 | TRB850 | TRB1000 | TRB1350 | TRB1400 | TRB1550 | TRB1650 | TRB1750 | |
Weight | 258 | 557 | 753 | 1653 | 1774 | 2569 | 2752 | 3912 |
Length | 1415 | 1735 | 1994 | 2367 | 2414 | 2760 | 2816 | 3176 |
Required oil Flow | 40~70 | 60~100 | 80~110 | 120~150 | 130~1800 | 180~240 | 200~260 | 210~290 |
Working pressure | 110~140 | 130~1640 | 150~170 | 160~180 | 160~180 | 160~180 | 160~180 | 160~180 |
impact rate | 500~900 | 400~800 | 350~700 | 400~800 | 350~500 | 300~450 | 250~400 | 200~350 |
Hose Diameter | 0.5 | 0.75 | 0.75 | 1 | 1 | 1 | 1.2 | 1.2 |
Chisel Diameter (mm) | 68 | 85 | 100 | 135 | 140 | 155 | 165 | 175 |
Chisel Length | 700 | 900 | 1000 | 1300 | 1300 | 1500 | 1600 | 1600 |
Applicate Exvacator | 4~7 | 7~14 | 10~15 | 18~26 | 18~26 | 28~35 | 30~45 | 40~55 |
Company profile:
(CNBM International) is the most important trading platform of CNBM Group Corporation, a state-owned company under the direct supervision of State-owned Assets Supervision and Administration Commission of the State Council.With the advantages in Cement, Composite Materials, New Building Materials and Engineering, We are enlarging sub-brand. Currently, we have wholly-owned overseas subsidiaries and branches in 5 countries with a view to realize localization. Meanwhile, we have established strategic partnerships with hundreds of domestic manufacturers and sound business relations with clients from over 120 countries. In line with the business, CNBM International launched E-business platform Okorder.com. It conformed the best resource and logistics to meet the customers’ request with 24 hours full-time service.
FAQ:
1. Q: Can I get some professional suggestion?
A: Sure, we have professional engineer. Any question will be solved.
2. Q: Do you have the products in stock?
A : Yes , We have several models now could supply to you.
3. Q: What's the delivery time?
A: It usually takes about 25 days to produce an order. But the exact delivery time might be different for different orders or at different time.
4. Q: How does your factory do regarding quality control?
A: Quality is priority. Workers always attach great importance to quality control from the every beginning to the end of the production. Every product will be fully assembled and carefully tested at important moment.
5. Q: Will you deliver the right goods as ordered? How can I trust you?
A: Yes, we will. Our company is world top 500, that is the biggest supplier and manufacture in China, having a good reputation around the world.
- Q:i have this engine on a go cart and i just want to know how much the motor is worth. thanks
- England or united states of america of united statesa..??Twelve 12 months previous boiler would decide on a sturdy cleansing and a song up..it may well be ok..The water tank, if I understand what you say, is an electric water heater..? despite if it is it must be getting drained. If the climate are long previous( there are 2 of them) you will get some warm and then cool water. while you're on hand you may replace them your self..They fee approximately 12 to $15 each. they have the two 4 nuts protecting them in or one vast (a million a million/4) +/-hexagon good on it to get rid of it....close OFF the ability, get rid of the wires ( from one) returned out the unit out counter clock clever. placed pipe thread compound on the threads and reinstall. Then do the 2nd..One hours artwork..do no longer screw with the boiler. Ask around for a functional burner guy to do your boiler. In England, i've got faith, the comparable strategies prepare..added explaination: If one element is lifeless the tank won't shelter temp. in case you do one do 2. it is going to keep you attempting to harass shoot the heater. Too complicated to describe...
- Q:How do the fixed assets in accounting distinguish between (machinery and other production equipment) and equipment (tools and tools) related to production and operation activities?
- According to the Ministry of finance tax administration and the State Administration of taxation income tax division, the State Council Legislative Affairs Office of the Finance Secretary interpretation and practical guide "and" implementation rules of the enterprise income tax law interpretation, instruments, tools, furniture and other related production and business activities, the minimum depreciation period of 5 years: this kind of fixed assets, except machinery, machine and other production equipment, but related to production and business activities, which is not directly the production tools, but to play instruments, tools, furniture and other auxiliary role in the process of production and operation, their service life is relatively short, the lower the depreciation period of 5 years.
- Q:How much money do you need to invest in construction machinery parts?
- CD-ROM is best to use Samsung's DVD engraved, ASUS's noise is quite large oh. With the background of case 8185B, a power supply for the mute. Display is best to use NESO's Dragon tube, do map, that is, to an effect.
- Q:I have made my own clock system and it would only work if the clock goes round once in 86400 seconds - in one day instead of twice. So what do I have to do with my clock to make that work? btw. I'm not talking about a digital clock-
- Mark the dial with 24 sections instead of 12 and all will be well.
- Q:The machinery will be depreciated over ten years using the double-declining balance method. If depreciation is computed on the basis of the nearest full month, Foley should record depreciation expense for 2007 on this machinery of $20,800. $20,400. $20,550. $20,933.
- Assume the machine useful life is 10 years Double-declining-balance method Rate: Double of straight-line rate 100%/10=10% x 2 =20% Depreciation Expense: Year 2006: $120,000 x 20% =$24,000 (whole year) $24,000/12=$2,000 (every month) There are only 8 months (May-Dec.) $2,000 x 8 = $16,000 Year 2007: ($120,000-16,000) x 20% = $20,800 Unlike the other depreciation methods, salvage value is ignored in determining the amount to which the declining balance rate is applied. Depreciationn stops when the asset's book value equals expected salvage value.
- Q:i wouldn't believe this, but ....whenever my daughter becomes upset...things just stop working. has anyone else seen this phenomina
- No evidence for this. James Randi offers $1 Million to anyone who can prove paranormal phenomena. It's just coincidence, but if you think otherwise, get together with some others and produce a study and go for the $1M.
- Q:Can you please just name the piece of machinery they used and in what mission? I want to be able to make my mom proud that I did my own work. Please help me?Here is the full question:Research a tool or a piece of machinery that scientists have used on a space mission. With your knowledge of simple machines, specifically describe how it was used to collect data for this mission. Include a diagram or picture (if possible) and be sure to list what mission this machine or tool was used on.
- You're in GT too? Haha so anyway, this question was confusing but just think of all the simple machines, and just something used in space like a rover, satellite, even a parachute and think of how the simple machines help these machines. Wheel and axel and screw are probably easiest. You really should email or webmail me for help :)
- Q:... to get Peter off the couch to go for a walk?
- a fork lift
- Q:Heavy equipment machinery to be specific. i.e. dozers, excavators, backhoes
- Driven Cat's in the mines (u/g artic trucks AD45, 55 and 55B, graders, 777 769). Proof of the pudding is in the tasting they say, and all mines are full of Cat gear. Im not sure about Case to be honest, but Cat gear is excellent.
- Q:What kinds of construction machinery are needed for urban landscaping?
- Landscaping projects are mainly used in construction machinery: sprinkler, lawn mower, sprinkler, excavators (general backhoe and small green excavators), cranes and so on
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Excavator Mounted Hydraulic Breaker Chisel
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 200 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords