• Excavator Digging Bucket High Quality Solid System 1
  • Excavator Digging Bucket High Quality Solid System 2
Excavator Digging Bucket High Quality Solid

Excavator Digging Bucket High Quality Solid

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
2000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Excavator Digging Bucket High Quality Solid


Basic Info

Model NO.:BZD-200

 

Type:Crawler Excavator

Size:Large-Scale

 

Certification:CE, ISO9001: 2000, SGS

Condition:New

 

Capacity:0.8m3

Teeth Plate Thickness:30mm

 

Side Plate Thickness:25mm

Gusset Plate Thickness:8mm

 

Bucket Width:1040mm

Bucket Opening Length:1120mm

 

Bucket Deepth:750mm

Bucket Weight:680kg

 

Material:Q345b

Warranty:6month

 

Export Markets:Global

Additional Info.

Trademark:GD-Haide

 

Packing:Bubble Film

Standard:SGS, CE, ISO9001: 2000

 

Origin:Dongguan City, Guangdong Province, China

HS Code:843149

 

Production Capacity:1000set/Year

Product Description

Excavator digging bucket for Hitachi

Capacity: 0.8m3
Teeth plate thickness: 30mm
Side plate thickness: 25mm
Gusset plate thickness: 8mm
Bucket width: 1040mm
Bucket opening length: 1120mm
Bucket deepth: 750mm
Bucket weight: 680kg
Material: Q345B
Warranty: 6month

You can choose the material as your demand to choose NM400 or HARDOX400. 
According to different construction environment and customer requirement, we rationally deal with stresses, select high quality steel, use perfect welding to guarantee the structural strength, performance and quality. 

We also can manufacture it as per your any requirements. We can make it 0.1m3 up to 12m3.

Capacity(m3)MaterialOpening length(mm)width(mm)deepth(mm)teeth plate thickness(mm)Side plate thickness(mm)Gusset plate thickness(mm)
0.4 Q345B87064056025206
0.6 Q345B98084064030208
0.8 Q345B11201040750403010
1.0 Q345B11801140780403010
1.3 Q345B13001260820403012
1.5 Q345B13001340900504012
2.0 Q345B140015401020504016
2.5 Q345B145016601100504016
3.0 Q345B150017801200504016
3.6 Q345B160018401300504016

Excavator Digging Bucket High Quality Solid

Excavator Digging Bucket High Quality Solid


Q: Or are you in the Caterpillar camp who wants to move $ 35 an hour jobs and pay $ 12.50 an hour AFTER they took bailout money and built a new plant in Brazil ?
Ford did not have cheap foreign competitors. Ford did not have pension plans, payroll taxes, EPA regulations, or $5,000 per vehicle legacy costs. Ford did not have unions. Ford did not have robots that could do most of the work and work 24/7 with no lunch break. Ford did not have the highest corporate tax rate in the world. Comparing Ford's monopoly on the car industry 80 years ago to today's global market place is apples to oranges. Actually it is more like comparing apples to laptops, they are not even remotely similar.
Q: Should I use carpet or excavator
Your best bets are actually either paper towel or slate tile. Reptile carpet is pretty good, but sometimes there are incidents of leos catching their toes in the carpet. And I'm not sure that the excavator stuff is a very good idea, I think sometimes it collapses and/or can be ingested.
Q: How many times a week should I do activities? What kind of activities? How do I get started? Please, any advice would be great!
1 have 3 children, 5, 3 and 18 mo. Yes we all need to do what u are doing. I focus on numbers, colors, shapes, letters and prewritting , pre reading. Make your lessons for your older child and water them down as needed. It all depends on your 4 year old,. I have notebooks for each child and they scribble and write and we do lessons of whatever is intereresting at the time for a while it was science so we did some easy sci projects. for a while it was insets so we went to the library and got a ton of books about insects. I'd take them to bed time an hour before they fall asleep turn off the tv and just read touch and lok at the books. Follow your instinct its best.
Q: My excavator is KOMATSU PC650,the bucket is vulnerable to wear after changed . How could I choose a right one
Wow u killed a bucket they should outlast the machine if properly cared for. Have u ever had the bucket rewelded with build up wire so you r wearing the weld rather than the bucket? Its very simple all you need is an inexpesive mig welder and a couple of rolls of build up wire and weld x's all over the contact patch of your bucket.
Q: Its likea a claw thing,,, similar to a crane but looks like a claw big machines used in construciton~
Are you perhaps talking about a grapple?
Q: i threw a track and going to try to replace myself
You must remove a pin to separate track. Lay track in position so you can get a come along hooked to pull the track together on the top, not on the ground. Replace pin and your on your way.
Q: I have a blue/black mill deck. It is a pretty standard mill deck with halimar excavators and jwari shapeshifters thrown in as millers/blockers. My big problem occurs when I get overrun by an opponents flying creatures. What can I do. Are there any blue or black enchantments that can help me or will I just have to put in some flying creatures (really don't want to take up space doing that). Thanks for the help.
Go U/G aggro/mill. That's what one of my friends has. He uses various allies (umara raptor, oran rief survivalist, turntimber ranger) to hold the fort while his harabaz druids, birds of paradise, and lotus cobras power out a huge mind spring, and fogging every now and sleeping every then allows him to buy time or set up a lethal aggro strike, and once he draws a ton of cards he uses his harabazes to toss down crabs and halimars mill his opponent around turn 6.
Q: Im building a new house and i am currently arranging to have the excavator contractor there to install septic and excavate for the foundation. Then im having the foundation contractor come in to do his job. I live in Nova Scotia if that makes any difference. Should any of these guys be asking for money up front or part way through? Or do they finish then bill me with 30 days to pay? Whats the normal procedure?
I just built a house. I paid the architect after final billing and paid the contractor first a deposit, and from then on had a planned payment schedule of 3 sums with the successful completion of each stage as described in our contract. There was also a final payment for requested extras not included in our quote. Our builder is a very stand up guy.
Q: Which or the two archeologists was the better excavator for the Aegean civilization- Evans or Schliemann? Please discuss their methods of excavating and the truth in their quot;finds.quot;Side note: This is a question on my study guide and I deff need the help! Please!
Evans is better.
Q: I'm doing a project on cranes. I'm wondering which crane has the longest jib. Thanks!
Probably a dragline crane used for quarrying etc.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords