Etaseco,Horizontal / vertical, seal-less volute casing pump
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 10 unit/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Design |
Overview of technical data
Type of impeller | Multi- vane impeller;Closed;Closed / Radial;Radial |
Type of installation | Close- coupled |
Maximum drive rating | 18 kW |
Impeller material (EN standard) | JL1040; JS1025 |
Type of bearing | Plain bearings |
Drive frequency | 50 Hz / 60 Hz |
Maximum speed of rotation | 3. 500 1/min |
Maximum flow rate | 250 m³/h |
Maximum discharge-side pressure | 16 bar |
Casing material (EN standard) | JS1025; JL1040 |
No. of impeller entries | Single entry |
Casing material | Cast iron; Nodular cast iron |
Minimum flow rate | 3 m³/h |
Suction characteristics | Non- priming |
Drive voltage | Low voltage |
eClass assignment | 36410100; 36410101;36410000 |
Pull-out design | Yes |
Pump set location | Dry installed |
Max. permissible fluid temperature | 140 °C |
Main applications | Industry and process engineering |
Type of installation | Stationary |
Type of casing | Volute casing |
Type of connection | Flange |
Type of lubrication | Oil / Product lubrication |
Type of drive | Electric motor |
Installation position | Horizontal or vertical |
Shaft material (EN standard) | 1. 4021 |
Type of coupling | Direct |
Shaft seal type | Canned motor pump |
Drive | IEC standardized motor |
Maximum head | 100, 00 m |
Maximum rated pressure (discharge) | PN 16 |
Minimum head | 9, 00 m |
Nozzle position | End suction |
Casing partition | Radially split |
Connection to power supply | 220/ 400/690 V, 3~ |
- Q:The difference between mechanical engineering and automation and electrical engineering
- The main part of electrical engineering is circuit, electronic technology, electrical control, electrical machinery, power system, and so on. The destination of graduation is the power plant and some electronic related enterprises, which are very different
- Q:And could you explian on how they do it?
- One okorder /... TBMs' were used to make the tunnel under the English channel between England and France. If you go to the link, you will find out everything you might want to know about TBMs' Also check out the initial search page in the source below. Wingman
- Q:Friction generates heat and causes wear and tear in machinery yet friction is often needed. Explain briefly?
- Friction is needed for most things to move. Although it causes the tires to wear out, the car will not be able to move if there is no friction. It will just slip off the surface of the road. A man cannot walk if the ground is frictionless. The shoes will not get grip on the ground and the man will slip.
- Q:Electrical machinery,Is there any one to answer to my question about electrical machinery?? Thanks alot;)
- Yes, there are some.
- Q:forum related to macinery parts sewer nozzles
- Um okorder Never know, you might just see something that you like, Thanks,
- Q:I just recently aquired some freshly cut maple and was interested in possibly turning into a snare drum. The only problem is that i cant figure out how. Ive searched on the internet and have come up relatively short on how to actually construct the shells themeselves. If anyone could point me in the right direction or give me some helpful hints it would be greatly appreciated.
- do nothing
- Q:Im trying to start a buisness building wind turbines.
- It will be easier for you to buy it. Carbon fibers are made several ways. One is making polyacrylonitrile fibers, then coking them; the nitrogen runs off with the hydrogens. You can also make fibers from pitch and coke them. Coking the fibers is NOT simple or easy. Also, carbon fibers are a real pain because they short electric equipment
- Q:My neighbors just woke me up with extremely loud chainsaws!! Is there some rule about this??
- It really depends on if there is a homeowners association because they usually have lots of rules you have to follow about when you can work and what you are allowed to have in the front yard... Anytime between 8 9am is perfectly acceptable, however it should also depend on the type of work that is being done. Severe stuff like chainsaws and jackhammering for a long period of time should start later and all neighbours should be warned via a note, phone call, or face-to-face interaction. Yet simple yard work like mowing and using a chainsaw to trim some stuff can start as early as 8am. Many people have a strange work schedules that cause them to stray from the typical 9-5pm shift or people have infants or can be sick... if you fall into one of these categories then you have the obligation of telling your neighbour. If they are cool about it and you approach them nicely then they can start later in the morning, but you have to be respectful of their schedule too. Or simply ask them when they plan on using the loud tools so that you can prepare yourself for it. Who knows, they might have plans later and this is the only time they can get the work done! You don't want to start the communications off on a bad foot because this will just create misery for you in the future. But if all else fails, look at your local ordinaces because there might be some sort of noise rules on file that most people are not aware of. Good luck, and remember to look at things from their point of view too! It will help!
- Q:I would like an example workout routine thank you! :)
- I like to take a deck of cards and make each suite represent a certain workout of my choice, and the number of the card tells me how many of them to do. for example: hearts = minutes of jogging in place, or anything cardio spades = pushups or anything upper body clubs = crunches or anything mid section diamonds = squats or anything lower body. and then for face cards jacks = 11 queens = 12 kings = 13 aces = 14 joker = 15 of everything It's like a game where the object is to get through the entire deck.
- Q:Survey: What is your favourite thing to do whilst operating heavy machinery?
- I actually drive a digger and I sing a lot when the engine is revving loud enough that no one can hear me
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Etaseco,Horizontal / vertical, seal-less volute casing pump
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 10 unit/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords