Etaseco,Horizontal / vertical, seal-less volute casing pump
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 10 unit/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Design |
Overview of technical data
Type of impeller | Multi- vane impeller;Closed;Closed / Radial;Radial |
Type of installation | Close- coupled |
Maximum drive rating | 18 kW |
Impeller material (EN standard) | JL1040; JS1025 |
Type of bearing | Plain bearings |
Drive frequency | 50 Hz / 60 Hz |
Maximum speed of rotation | 3. 500 1/min |
Maximum flow rate | 250 m³/h |
Maximum discharge-side pressure | 16 bar |
Casing material (EN standard) | JS1025; JL1040 |
No. of impeller entries | Single entry |
Casing material | Cast iron; Nodular cast iron |
Minimum flow rate | 3 m³/h |
Suction characteristics | Non- priming |
Drive voltage | Low voltage |
eClass assignment | 36410100; 36410101;36410000 |
Pull-out design | Yes |
Pump set location | Dry installed |
Max. permissible fluid temperature | 140 °C |
Main applications | Industry and process engineering |
Type of installation | Stationary |
Type of casing | Volute casing |
Type of connection | Flange |
Type of lubrication | Oil / Product lubrication |
Type of drive | Electric motor |
Installation position | Horizontal or vertical |
Shaft material (EN standard) | 1. 4021 |
Type of coupling | Direct |
Shaft seal type | Canned motor pump |
Drive | IEC standardized motor |
Maximum head | 100, 00 m |
Maximum rated pressure (discharge) | PN 16 |
Minimum head | 9, 00 m |
Nozzle position | End suction |
Casing partition | Radially split |
Connection to power supply | 220/ 400/690 V, 3~ |
- Q: would you crank out some dollars?
- yea i prolly would LOL
- Q: In urgent need of blasting drilling team, only drilling, blasting, drilling machines come with, and other what the site
- 4, the subcontractor's (Professional) security emergency plan. 5, subcontract direction, provide all entry personnel roster, ID card copy, health certificate, and provide mechanical equipment acceptance record list and mechanical list. 6, the special construction organization design (program), including quality objectives and specific guarantee measures, and finished product protection measures, etc..
- Q: To ask, I have better supply of construction machinery here, I would like to foreign trade, I do not know how the international market in the near future, engineering machinery, foreign trade to prepare what knowledge?
- In addition to a slight increase in exports in March and April, exports in other months remained low. If it meets the "second financial crisis scene" situation is very bad. At this critical moment, the country's policies and regulations on imports and exports have been introduced, although there is no particularly good news, but through analysis, there are still some bright spots.
- Q: Why is it a heavy duty vehicle?
- The okorder , it is usually seen in the different industries, especially in construction to make the job easier and faster. It has different kinds, like all-terrain cranes, rough terrain cranes, knuckle boom cranes, and truck mounted cranes.
- Q: I am asking as a potential manufacturer who is looking to set up a factory in China and use this machinery to produce goods. If you know, could you also please post some links so I can further my knowledge. Thanks!
- I understand your question. The best source of information would be the Chinese Embassy in Washington, DC. I do know of at least one U. S. exporter (cotton and textile fibers) that was asked if he could supply a reconditioned cotton gin. As far as I know there were no U. S. restrictions but it never got off the ground because the Chinese buyers either couldn't or wouldn't pay the asking price.
- Q: Cost of construction machinery use fee
- Repairs: refers to construction machinery in accordance with the provisions of the repair interval shift necessary repair, to restore the normal function of the cost. Shift repairs (= a repairs overhaul X times) the total number of classes often 83019 durable repairs: refers to all levels of construction machinery repair maintenance in addition to outside and temporary troubleshooting costs.
- Q: food additive , chemicals , machinery. hp:84916314647
- What exactly are you trying to find out? Can you give us a bit more information?
- Q: what are the machinery needed to produce many corndogs, corncerning the storage and process of ingredients?
- Thicken your regular cornbread recipe by adding the liquid (usually milk or buttermilk) to the rest of the ingredients a little at a time until you have a thick pancake batter consistency. Pour it into a tall drinking glass. Heat a pot of oil to about 375°F. Skewer your favorite, juicy beefy hot dog with a disposable wooden chopstick, pat it dry then dip it into the drinking glass, turning to coat completely. Immediately place battered dog into the hot oil, turning as necessary to brown all sides evenly. It will only take a few minutes for the corn bread to cook and brown, remove and drain on paper towels.
- Q: I ve been going to school for HVAC for about a month now. And I was just wondering if anyone had any tips on reading schematics or wiring the machinery up. ( besides make sure the power is off) Each day I get it a little more but I was just wondering if any experts had some tips. Also how is the pay when you get out of school? Please don't tell me to go to salarey I just wanted to know for someone with 1st hand experience. I live in Ma. Thanks in advance
- When working with schematics just remember that all electrical circuits have to have 5 components 1) a source ( ac or dc) 2) a load (maybe a lightbulb) 3) protection ( fuse or circuit breaker) 4) conductors (wires) 5) a switch. Once you know what all of your components are you shouldn't have any trouble following the lines on the schematic. As far as pay is concerned, it all depends on salaries in your state. I don't know what they are in MA. Try calling some electrical contractor in your area and do a salary survey with the. Hope this helps.
- Q: Whats the biggest piece machinery you ever drove?
- 7 tonne forklift 10 tonne crane hugs xxxx
Send your message to us
Etaseco,Horizontal / vertical, seal-less volute casing pump
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 10 unit/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords