Escalator OTIS Rail Gauge
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 10 Units unit
- Supply Capability:
- 8000 Units per Quarter unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Detailed Product Description
a.OTIS Rail Gauge
b.Special using for escalator
c.Certification:CE&ISO9001:2008
d..MOQ:1-10 pieces
e.Good quality Best price
YOUR CHOICE:
1.We are able to supply you a large variety of elevator components/ escalator parts of different
(a selection of more than2,000 kinds).
2.We can guarantee the product quality, delivery time and good service, please feel free to visit us!
3.We are able to manufacture according to your specific instructions and help you select appropriate
product and specification for you.
Looking forward to your inquiry!
- Q: What is the name of the elevator?
- Rope head assembly, hanging wire rope used.
- Q: What are the elevator parts?
- Electrical or mechanical
- Q: Inside the elevator how to do leakage
- If the bottom pit leaking, they dry, and see the next day there, if you continue to leak, it can only do waterproof, and often leaks will lead to rust inside the elevator parts corrosion, The madness is too easy to damage.
- Q: Usually said that the elevator three pieces, which is the three pieces? Not that the elevator is the four major space + eight system more
- Traction machine (often said that the host or motor), door machine, variable frequency drive (equivalent to the human brain) or control cabinet (including variable frequency drive and control cabinet motherboard)
- Q: The elevator warranty period is in accordance with the Ministry of Construction in 1995 issued the project (1995) No. 167 "on the strengthening of the elevator management of the Interim Provisions Implementation Rules" provides: the newly installed elevator quality warranty period from the date of acceptance of one year, Or goods to the site for 18 months basis? Or on the basis of the 25th executive meeting of the State Council on January 10, 2000 (Decree No. 279 of the State Council of the People's Republic of China on January 30, 2000) "Regulations on the Quality Management of the Project" In the provisions of the electrical pipeline, water supply and drainage pipes, equipment installation and renovation works the minimum warranty period of 2 years? More
- According to the Regulations of the Ministry of Construction on the Implementation of the Interim Provisions on the Strengthening of Elevator Management issued by the Ministry of Construction in 1995 (1995), the newly installed elevator warranty period is one year from the date of acceptance or delivery to the site 18 months as the basis, this is the only known for the elevator warranty period of national documents. Of course, you can also supply and demand consultation between the two sides agreed to extend the agreement with the agreement to extend the elevator, if no agreement, in accordance with the provisions of the Ministry of Construction No. 167 provisions.
- Q: Hello there. I also encountered the same problem with you. Start without water. Forget the faucet. And then came to the elevator to burn the car to take care of the amount of money. The property makes me lose money. But what did you do? More
- Because your personal fault to damage the elevator is the need for compensation, of course, can also find someone to repair to the safe use of standards
- Q: Elevator hoist inside the iron frame how to build, that is how to put the parts to the top of the
- Do you know that there is a hook on the top? Bearing capacity is generally 2 tons. At first start the bottom of the car. Then people stand on top. Pull up the hook. People to pay ridge barnyard jealousy Huan half of the newspaper only began to install rails. Ring beam and so on. The
- Q: What is the most valuable part of the elevator?
- Is the motherboard and inverter
- Q: Which parts of the elevator change is the transformation of it
- The elevator transformation project includes: the main parts of the model, specifications change, such as: speed limiter, safety gear, buffer, door locks, rope combination, rail, traction machine, control cabinet, fire floor, glass doors and glass Wall, upstream overspeed protection device, safety circuit with electronic components, hydraulic pump station, speed limit shut-off valve, electric check valve, manual drop valve, mechanical anti-settling (anti-climb) device, step or pedal, cascade chain, , Wheel (main wheel, secondary wheel), metal structure, handrail, escalator or automatic walkway control screen. The main parameters and other content changes, such as: rated speed, rated load, drive mode, speed control mode, control mode, lifting height, running length (on the sidewalk), tilt angle, nominal width, explosion-proof level, explosion-proof media, The
- Q: What is the highest part of the elevator car roof?
- It is simple to say that the elevator reaches the top floor, the closest part to the top floor
1. Manufacturer Overview
Location | Beijing,China (Mainland) |
Year Established | 2009 |
Annual Output Value | US$2.5 Million - US$5 Million |
Main Markets | South America; Southeast Asia; Africa; Oceania; Mid East; Western Europe |
Company Certifications | ISO 9001:2000 |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | |
Export Percentage | 11% - 20% |
No.of Employees in Trade Department | 6-10 People |
Language Spoken: | |
b) Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Escalator OTIS Rail Gauge
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 10 Units unit
- Supply Capability:
- 8000 Units per Quarter unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords