Elevator Button
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 Pieces pc
- Supply Capability:
- 50000 Pieces per Month pc/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Detailed Product Description
-long life
-Good looking
-High quality
- Q: What is the name of the elevator?
- Elevator wire rope rope combination, the lower end (tapered hole) need Babbitian pouring. This rope combination is generally used for straight pull traction.
- Q: What are the elevator parts?
- (Control circuit, control circuit, signal circuit, safety circuit, drive module, contactor relay, power supply, power supply, power supply, power supply, power supply, Heat sink, etc.) sockets, distribution box, intercom car: car, guardrail, car top, car wall, bottom row, bottom beam, weighing (also may be installed in the rope), control panel, display, maintenance Device, signal device, car door, switch door device, emergency light, lighting, alarm device, safety window (option), safety gear, mechanical lock (option), intercom Well: rail, signal device, with cable, (Optional), lighting pit: buffer and the base, up tight wheel, emergency stop, socket, intercom temporarily think of so much
- Q: Inside the elevator how to do leakage
- It is recommended to find the property or maintenance side to deal with, it is best not to act independently, so as to avoid accidents.
- Q: Usually said that the elevator three pieces, which is the three pieces? Not that the elevator is the four major space + eight system more
- Host, control cabinet, security system? This really do not know
- Q: Elevator overweight crushed what parts are broken need to repair how much money
- Check the overload switch
- Q: I am now the company elevator to find its import parts are made, I should be to which government departments to add to the question: the elevator company which broke the law more
- First find the city quality supervision bureau to find consumer associations or the City Administration for Industry and Commerce
- Q: Which parts of the elevator change is the transformation of it
- For unillustrated elevators: there is a change in design-related changes. Simply put your installation site can not meet the installation requirements of the purchase of the elevator. For the aging of the old need to replace the elevator: the heavy burden of Cao nuclear ugly investigation of the new installation of the intestine can be considered a transformation. For the use of the elevator: simply replace the parts can not meet the requirements, you need to transform, such as: you want to load 1 ton of elevator carrying capacity of 1.5 tons. For example, you want the elevator speed from 1m / s to 2.5m / s. If only the inverter or host failure need to be replaced, it is not modified.
- Q: The home has been renovated, the toilet and hose links do not install the filter, fall, resulting in running water, water into the elevator, causing damage to the elevator parts, responsible for the loss of fear of consumption with the treasure who will bear. Because the elevator is always bad before, always wrong, how to set loss, how can determine the bad is caused by the run of the water? More
- Looking for your decoration company to bear, as for the elevator to find professionals to detect the assessment
- Q: What is the highest part of the elevator car roof?
- It is simple to say that the elevator reaches the top floor, the closest part to the top floor
- Q: What is the easy parts of the elevator?
- Door system, signal device, guide device
We have expert designers and managers and set up effective quality control system and achieved ISO9001 certificate for quality management system. We strictly control the product quality from design, manufacture, inspection, installation to service according to ISO9001 standard.
1. Manufacturer Overview
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b) Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Elevator Button
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 Pieces pc
- Supply Capability:
- 50000 Pieces per Month pc/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords