Elevator SWpare Parts Limit Switch
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 110 Pieces pc
- Supply Capability:
- 9000 Pieces per Quarter pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Packaging Details: As you required!
Specifications
a,Using for elevator,lift
b,Certification:CE&ISO9001:2008
c,MOQ:1-10 pieces
d,Competitive price
1.We are able supply you a large variety of elevator components/ escalator parts of different
brands (a selection of more than2,000 kinds).
2.We can guarantee the product high quality, delivery time and good service.
3.We are able to manufacture according to your specific instructions and help you select appropriate
product and specification for you.
Looking forward to your inquiry!
- Q: Inside the elevator how to do leakage
- See is not the pit of water, and to dry Yeah, or else will burn the circuit board, hope to adopt
- Q: Elevator overweight crushed what parts are broken need to repair how much money
- Check the overload switch
- Q: I am now the company elevator to find its import parts are made, I should be to which government departments to add to the question: the elevator company which broke the law more
- First find the city quality supervision bureau to find consumer associations or the City Administration for Industry and Commerce
- Q: What are the contents of the installation of the elevator floor door components?
- Elevator floor installation components Contents: 1 with a vertical wall of the installation of the plane 2 to adjust the plane of the wall connector, 3 fastening the connection to set the slot with the adjustment of the surface with the adjustment plane in conjunction with the door joints Interconnection. 4 is provided on the wall mounting plane and the adjustment plane of the wall connection. The connection slot for the provision of the fastening connection and the longitudinal direction is perpendicular to each other. And the length of the connecting slot on the adjustment plane connected to each other is also perpendicular to each other, and the length of one of the slots is perpendicular to the wall mounting plane The
- Q: The elevator warranty period is in accordance with the Ministry of Construction in 1995 issued the project (1995) No. 167 "on the strengthening of the elevator management of the Interim Provisions Implementation Rules" provides: the newly installed elevator quality warranty period from the date of acceptance of one year, Or goods to the site for 18 months basis? Or on the basis of the 25th executive meeting of the State Council on January 10, 2000 (Decree No. 279 of the State Council of the People's Republic of China on January 30, 2000) "Regulations on the Quality Management of the Project" In the provisions of the electrical pipeline, water supply and drainage pipes, equipment installation and renovation works the minimum warranty period of 2 years? More
- According to the Regulations of the Ministry of Construction on the Implementation of the Interim Provisions on the Strengthening of Elevator Management issued by the Ministry of Construction in 1995 (1995), the newly installed elevator warranty period is one year from the date of acceptance or delivery to the site 18 months as the basis, this is the only known for the elevator warranty period of national documents. Of course, you can also supply and demand consultation between the two sides agreed to extend the agreement with the agreement to extend the elevator, if no agreement, in accordance with the provisions of the Ministry of Construction No. 167 provisions.
- Q: Which parts of the elevator change is the transformation of it
- For unillustrated elevators: there is a change in design-related changes. Simply put your installation site can not meet the installation requirements of the purchase of the elevator. For the aging of the old need to replace the elevator: the heavy burden of Cao nuclear ugly investigation of the new installation of the intestine can be considered a transformation. For the use of the elevator: simply replace the parts can not meet the requirements, you need to transform, such as: you want to load 1 ton of elevator carrying capacity of 1.5 tons. For example, you want the elevator speed from 1m / s to 2.5m / s. If only the inverter or host failure need to be replaced, it is not modified.
- Q: What is the highest part of the elevator car roof?
- The engine room elevator is the guide wheel, the highest part of the machine room is the fence.
- Q: The elevator does not need to be sealed
- If it is emergency electric operation, need to block the safety gear switch, gripper switch (asynchronous machine), speed limit switch, upper and lower limit switch, the buffer switch
- Q: The elevator has a certain useful life
- This really is not, only reference scrapped, not forced to scrapped!
- Q: What is the easy parts of the elevator?
- Mainly electrical control components
1. Manufacturer Overview
Location | Beijing,China (Mainland) |
Year Established | 2009 |
Annual Output Value | US$2.5 Million - US$5 Million |
Main Markets | South America; Southeast Asia; Africa; Oceania; Mid East; Western Europe |
Company Certifications | ISO 9001:2000 |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | |
Export Percentage | 11% - 20% |
No.of Employees in Trade Department | 6-10 People |
Language Spoken: | |
b) Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Elevator SWpare Parts Limit Switch
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 110 Pieces pc
- Supply Capability:
- 9000 Pieces per Quarter pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords