Pre-Painted Galvanized Steel Coil in Prime Quality Green Color
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m²
- Supply Capability:
- 10000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Pre-Painted Galvanized/Aluzinc Steel Coil Description:
With GI as base material, after pretreatment (degrease and chemical treatment ) and liquid dope with several layers of color, then after firing and cooling, finally the plate steel is called pre-painted galvanized (aluzinc) steel. Pre-painted galvanized steel is good capable of decoration, molding, corrosion resistance. It generally displays superior workability, durability and weather resistance.
2.Main Features of the Pre-Painted Galvanized/Aluzinc Steel Coil:
• Excellent process capability
• Smooth and flat surface
• Workability, durability
• Excellent heat resistance performance
• High strength
• Good formability
• Good visual effect
3.Pre-Painted Galvanized/Aluzinc Steel Coil Images:
4.Pre-Painted Galvanized/Aluzinc Steel Coil Specification
Standard: AISI, ASTM, BS, DIN, GB, JIS
Grade: DX51D, DX52D
Thickness: 0.17-2.0mm
Brand Name: KMRLON
Model Number: coil
Type: Steel Coil
Technique: Cold Rolled
Surface Treatment: Coated
Application: Boiler Plate
Special Use: High-strength Steel Plate
Width: 20-1250mm
Length: customized
commoidty: pre-painted galvanized steel coil
Thickness: 0.13-4.0mm
width: 20-1250mm
zinc coating: 40-180g/m2
printing thickness: top side: 20+/-5 microns, back side: 5-7 microns
color: all RAL color
surface treatment: color coated
coil weight: 4-7 tons
coil ID: 508/610mm
packaging: standard seaworthy packing
5.FAQ of Pre-Painted Galvanized/Aluzinc Steel Coil
1. What’s the application of this product?
Roof, roof structure, surface sheet of balcony, frame of window, etc.
2. What’s the brand of the paint?
We use the best brand of all of the word—AKZO.
3. How to guarantee the quality of the products?
We have established the international advanced quality management system,every link from raw material to final product we have strict quality test;We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.
4. How long can we receive the product after purchase?
Usually within thirty working days after receiving buyer’s advance payment or LC. We will arrange the factory manufacturing as soon as possible. The cargo readiness usually takes 15-25 days, but the shipment will depend on the vessel situation.
- Q: What are the elevator parts?
- Electrical or mechanical
- Q: Inside the elevator how to do leakage
- If the bottom pit leaking, they dry, and see the next day there, if you continue to leak, it can only do waterproof, and often leaks will lead to rust inside the elevator parts corrosion, The madness is too easy to damage.
- Q: Elevator overweight crushed what parts are broken need to repair how much money
- Check the overload switch
- Q: The elevator warranty period is in accordance with the Ministry of Construction in 1995 issued the project (1995) No. 167 "on the strengthening of the elevator management of the Interim Provisions Implementation Rules" provides: the newly installed elevator quality warranty period from the date of acceptance of one year, Or goods to the site for 18 months basis? Or on the basis of the 25th executive meeting of the State Council on January 10, 2000 (Decree No. 279 of the State Council of the People's Republic of China on January 30, 2000) "Regulations on the Quality Management of the Project" In the provisions of the electrical pipeline, water supply and drainage pipes, equipment installation and renovation works the minimum warranty period of 2 years? More
- The elevator warranty period is in accordance with the Ministry of Construction in 1995 issued the project (1995) No. 167 "on the strengthening of the elevator management of the Interim Provisions Implementation Rules" provides: the newly installed elevator quality warranty period from the date of acceptance of one year, Or goods to the site for 18 months basis? Or on the basis of the 25th executive meeting of the State Council on January 10, 2000 (Decree No. 279 of the State Council of the People's Republic of China on January 30, 2000) "Regulations on the Quality Management of the Project" In the provisions of the electrical pipeline, water supply and drainage pipes, equipment installation and renovation works the minimum warranty period of 2 years? More...
- Q: Hello there. I also encountered the same problem with you. Start without water. Forget the faucet. And then came to the elevator to burn the car to take care of the amount of money. The property makes me lose money. But what did you do? More
- Because your personal fault to damage the elevator is the need for compensation, of course, can also find someone to repair to the safe use of standards
- Q: What parts of the elevator water will normally damage? (Elevator with a little state)
- Mainly from where to see the water, where to flow, not the water will be bad
- Q: Elevator hoist inside the iron frame how to build, that is how to put the parts to the top of the
- Do you know that there is a hook on the top? Bearing capacity is generally 2 tons. At first start the bottom of the car. Then people stand on top. Pull up the hook. People to pay ridge barnyard jealousy Huan half of the newspaper only began to install rails. Ring beam and so on. The
- Q: The elevator does not need to be sealed
- An old cell phone, logo can not see
- Q: The elevator has a certain useful life
- In general, the manufacturer's commitment to the main parts of the elevator life is twenty years. So the routine life of the elevator is the case, the general use of ten to fifteen years or so, to see the conditions and maintenance efforts to do a overhaul, the replacement of a number of wear serious, outdated, do not meet the new regulations of the components, To eight years, and then can do a renovation, replacement of a full set of security components, replace the latest host and control system, silly big car and rails can keep flowers Han lap karst barley cut brilliance, of course, car Of the show what can also change a change, but also can be scrape together live with a decade and eight years, and finally the last, you can all remove the new ladder so the new three years old three years, Save point with, you can use a twenty to five to three years, which is to save money units, rich units with a ten years to 20 years on the direct demolition of the new, and this look at their own financial resources
- Q: What is the easy parts of the elevator?
- Mainly electrical control components
Send your message to us
Pre-Painted Galvanized Steel Coil in Prime Quality Green Color
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m²
- Supply Capability:
- 10000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords