Pre-Painted Galvanized Steel Coil in Prime Quality Green Color
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m²
- Supply Capability:
- 10000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Pre-Painted Galvanized/Aluzinc Steel Coil Description:
With GI as base material, after pretreatment (degrease and chemical treatment ) and liquid dope with several layers of color, then after firing and cooling, finally the plate steel is called pre-painted galvanized (aluzinc) steel. Pre-painted galvanized steel is good capable of decoration, molding, corrosion resistance. It generally displays superior workability, durability and weather resistance.
2.Main Features of the Pre-Painted Galvanized/Aluzinc Steel Coil:
• Excellent process capability
• Smooth and flat surface
• Workability, durability
• Excellent heat resistance performance
• High strength
• Good formability
• Good visual effect
3.Pre-Painted Galvanized/Aluzinc Steel Coil Images:
4.Pre-Painted Galvanized/Aluzinc Steel Coil Specification
Standard: AISI, ASTM, BS, DIN, GB, JIS
Grade: DX51D, DX52D
Thickness: 0.17-2.0mm
Brand Name: KMRLON
Model Number: coil
Type: Steel Coil
Technique: Cold Rolled
Surface Treatment: Coated
Application: Boiler Plate
Special Use: High-strength Steel Plate
Width: 20-1250mm
Length: customized
commoidty: pre-painted galvanized steel coil
Thickness: 0.13-4.0mm
width: 20-1250mm
zinc coating: 40-180g/m2
printing thickness: top side: 20+/-5 microns, back side: 5-7 microns
color: all RAL color
surface treatment: color coated
coil weight: 4-7 tons
coil ID: 508/610mm
packaging: standard seaworthy packing
5.FAQ of Pre-Painted Galvanized/Aluzinc Steel Coil
1. What’s the application of this product?
Roof, roof structure, surface sheet of balcony, frame of window, etc.
2. What’s the brand of the paint?
We use the best brand of all of the word—AKZO.
3. How to guarantee the quality of the products?
We have established the international advanced quality management system,every link from raw material to final product we have strict quality test;We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.
4. How long can we receive the product after purchase?
Usually within thirty working days after receiving buyer’s advance payment or LC. We will arrange the factory manufacturing as soon as possible. The cargo readiness usually takes 15-25 days, but the shipment will depend on the vessel situation.
- Q: Inside the elevator how to do leakage
- See is not the pit of water, and to dry Yeah, or else will burn the circuit board, hope to adopt
- Q: Elevator maintenance, maintenance of which parts can be used to lubricants (grease), please experts for example, we explore.
- Lubricants generally do not need to maintain maintenance, gear oil models are generally added in the traction machine or motor has a reference model, and then Is the elevator random information are introduced.
- Q: Elevator overweight crushed what parts are broken need to repair how much money
- Check the overload switch
- Q: The elevator warranty period is in accordance with the Ministry of Construction in 1995 issued the project (1995) No. 167 "on the strengthening of the elevator management of the Interim Provisions Implementation Rules" provides: the newly installed elevator quality warranty period from the date of acceptance of one year, Or goods to the site for 18 months basis? Or on the basis of the 25th executive meeting of the State Council on January 10, 2000 (Decree No. 279 of the State Council of the People's Republic of China on January 30, 2000) "Regulations on the Quality Management of the Project" In the provisions of the electrical pipeline, water supply and drainage pipes, equipment installation and renovation works the minimum warranty period of 2 years? More
- Follow one of the previous
- Q: What parts of the elevator water will normally damage? (Elevator with a little state)
- Mainly from where to see the water, where to flow, not the water will be bad
- Q: What is the most valuable part of the elevator?
- Host, frequency cabinet. The two parts are the most valuable.
- Q: Which parts of the elevator change is the transformation of it
- The elevator transformation project includes: the main parts of the model, specifications change, such as: speed limiter, safety gear, buffer, door locks, rope combination, rail, traction machine, control cabinet, fire floor, glass doors and glass Wall, upstream overspeed protection device, safety circuit with electronic components, hydraulic pump station, speed limit shut-off valve, electric check valve, manual drop valve, mechanical anti-settling (anti-climb) device, step or pedal, cascade chain, , Wheel (main wheel, secondary wheel), metal structure, handrail, escalator or automatic walkway control screen. The main parameters and other content changes, such as: rated speed, rated load, drive mode, speed control mode, control mode, lifting height, running length (on the sidewalk), tilt angle, nominal width, explosion-proof level, explosion-proof media, The
- Q: The home has been renovated, the toilet and hose links do not install the filter, fall, resulting in running water, water into the elevator, causing damage to the elevator parts, responsible for the loss of fear of consumption with the treasure who will bear. Because the elevator is always bad before, always wrong, how to set loss, how can determine the bad is caused by the run of the water? More
- I'm not here! I do not know! You have to say that sanitary ware I do not do the other I do not know you go to you to install the bathroom to see if he seems to be responsible
- Q: The elevator does not need to be sealed
- An old cell phone, logo can not see
- Q: The elevator has a certain useful life
- Have! forced retirement age of the elevator seems to be 15 to 25 years
Send your message to us
Pre-Painted Galvanized Steel Coil in Prime Quality Green Color
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m²
- Supply Capability:
- 10000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords