• Elevator Push Button System 1
Elevator Push Button

Elevator Push Button

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
100 Pieces pc
Supply Capability:
50000 Pieces per Month pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing
Detailed Product Description

1.Color:Red,Blue

2.Voltage: DC24V

Elevator Button

1.Color:Red,Blue

2.Voltage: AC/DC12V, AC/DC24V

3.Without Braille

Elevator Push Button, Lift Switch, Lift Electric Button, Elevator Electronic Switch

We have been supplying different types of high quality elevator push button as per customer’s

requirement.

Q: Inside the elevator how to do leakage
If the bottom pit leaking, they dry, and see the next day there, if you continue to leak, it can only do waterproof, and often leaks will lead to rust inside the elevator parts corrosion, The madness is too easy to damage.
Q: Elevator overweight crushed what parts are broken need to repair how much money
Generally weighing off bad, not much money, generally more than 100
Q: I am now the company elevator to find its import parts are made, I should be to which government departments to add to the question: the elevator company which broke the law more
Contract law, if the contract agreed
Q: The elevator warranty period is in accordance with the Ministry of Construction in 1995 issued the project (1995) No. 167 "on the strengthening of the elevator management of the Interim Provisions Implementation Rules" provides: the newly installed elevator quality warranty period from the date of acceptance of one year, Or goods to the site for 18 months basis? Or on the basis of the 25th executive meeting of the State Council on January 10, 2000 (Decree No. 279 of the State Council of the People's Republic of China on January 30, 2000) "Regulations on the Quality Management of the Project" In the provisions of the electrical pipeline, water supply and drainage pipes, equipment installation and renovation works the minimum warranty period of 2 years? More
The elevator warranty period is in accordance with the Ministry of Construction in 1995 issued the project (1995) No. 167 "on the strengthening of the elevator management of the Interim Provisions Implementation Rules" provides: the newly installed elevator quality warranty period from the date of acceptance of one year, Or goods to the site for 18 months basis? Or on the basis of the 25th executive meeting of the State Council on January 10, 2000 (Decree No. 279 of the State Council of the People's Republic of China on January 30, 2000) "Regulations on the Quality Management of the Project" In the provisions of the electrical pipeline, water supply and drainage pipes, equipment installation and renovation works the minimum warranty period of 2 years? More...
Q: Elevator hoist inside the iron frame how to build, that is how to put the parts to the top of the
Do you know that there is a hook on the top? Bearing capacity is generally 2 tons. At first start the bottom of the car. Then people stand on top. Pull up the hook. People to pay ridge barnyard jealousy Huan half of the newspaper only began to install rails. Ring beam and so on. The
Q: What is the most valuable part of the elevator?
Is the motherboard and inverter
Q: The home has been renovated, the toilet and hose links do not install the filter, fall, resulting in running water, water into the elevator, causing damage to the elevator parts, responsible for the loss of fear of consumption with the treasure who will bear. Because the elevator is always bad before, always wrong, how to set loss, how can determine the bad is caused by the run of the water? More
Your home water, your home toilet, of course, responsibility to you to bear, as you lose you can find you to install the toilet or sell your toilet operator count. If you pay the money, then the bad equipment and invoices should be too much trouble together with the fear of consumption with the treasure or cover the chapter of the quotation, and then take these things to find the toilet to count people. I have also encountered before the elevator was the case of water, the general is the door machine, if the water is more, the car control panel may also be damaged. The board is broken hundreds of dollars in general, if the door machine inverter is broken, then it may be thousands of dollars.
Q: What is the highest part of the elevator car roof?
It is simple to say that the elevator reaches the top floor, the closest part to the top floor
Q: The elevator does not need to be sealed
If it is emergency electric operation, need to block the safety gear switch, gripper switch (asynchronous machine), speed limit switch, upper and lower limit switch, the buffer switch
Q: What is the easy parts of the elevator?
Door system, signal device, guide device
We have expert designers and managers and set up effective quality control system and achieved ISO9001 certificate for quality management system. We strictly control the product quality from design, manufacture, inspection, installation to service according to ISO9001 standard.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a) Trade Capacity
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b) Factory Information
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords