• drop forged swivel coupler System 1
drop forged swivel coupler

drop forged swivel coupler

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details

Place of Origin:
Shandong China (Mainland)


Model Number:
FJ-BSW-0266
Material::
Q235
Surface treatment::
Electric Galv.
Fit prop diameter::
48.3mm x 48.3mm
Weight::
1.07 kg
Type::
Swivel

Packaging & Delivery

Packaging Detail:GUNNY BAG THEN ON PALLET.
Delivery Detail:WITH IN 25 DAYS.

Specifications

scaffolding drop forged swivel coupler
1.EN74/BS1139 products.
2.Clearly mark letters.
3.Perfect surface.

scaffolding drop forged swivel coupler

Used for connecting horizontal or ledger tubes to standards.

Can be used in all positions where the tube it secures comes under

                                   

SWIVEL COUPLERS

Dimensions:

48.3 x 48.3mm (1 29 / 32" x 1 29 / 32" )

Material:

drop forged carbon steel

Bolt:      

T-bolt

Nut sizes:

17mm, 19mm, 21mm, 22mm, 23mm

Styles:    

standard, flanged

Standards:

BS1139 (1982 & 1991), EN74 class A & B

Surfaces:

self-colored, galvanized, hot dip galvanized

Designed to fit tubes with 33.7mm (1 11/32") - 88.9mm (3 1/2") diameters


Q:along with this question, -what does she think about during this time period?-how does she apprear on the scaffold? -who does she see and how does she feel?THANKS!!=]
Read the book and find out! I think she's up on the scaffold sometime in spring, but as I said, READ it and make sure.
Q:For indoor use of mobile scaffolding safety construction plan! Four support points with four pulleys with brake!The construction scheme of scaffolding safety belt for indoor high Jiqiu braking pulley, for about 12 meters of buildings, indoor emergency please heroes!
All kinds of scaffolding engineering construction programGeneral requirements for 5.2.1 scaffolding settings and use general requirements for scaffold framing and setting requirementsThe design of the frame of the scaffold shall take full account of the requirements for the use of the project, the various conditions and factors for its implementation, and shall comply with the following requirements:Frame dimensions
Q:i got my scaffold done quite a while ago and it still really hurts and is all lush and crusty,loli know it takes agessss to heal but could i take it out and put normall small earrings in each whole instead? Which would i have to use? thanks
in my opinion you should ride it out and just clean it more often. not only will the piercings give you trouble if you try to change the earring now, the piercings themselves will move slightly and you won't be able to put an industrial bar back through it. if you can live with these go through with it, if not, wash often, rotate the bar constantly and avoid sleeping on it and getting your hair caught up in it. like you said, piercings in the cartilage are very sensitive and need time and nurturing so that they can heal properly.
Q:I sincerely ask you to help me, door scaffolding, build 30 meters high, without any reinforcement points of the construction program. Thanks, high marks!
This specification is applicable to the design, construction and use of the floor (bottom) door type steel pipe scaffold used in industrial and civil construction. The door type steel pipe scaffold for other purposes (such as chimneys, water towers, etc.) can be carried out in accordance with the principles of this specification.
Q:Scaffolding installation process, construction preparation
Construction preparation(1): steel pipe should be consistent with current national standard "carbon structural steel" (GB/T700) regulations Q235- grade steel; new steel pipe should be the product quality certificate; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth, pipe diameter deviation not more than -0.5mm, the wall thickness deviation not greater than -0.5mm, cutting slope deviation not greater than 1.7mm, the steel surface should be brushed with antirust paint; old steel corrosion depth not greater than 0.5mm, more than the prescribed steel shall not be used.(2): buckle made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; old buckle inspect before use, shall not have cracks, deformation, bolt appear smooth silk must be replaced; new and old fastener must brush good antirust paint.(3) foot board: the use of 4m long wooden foot board; foot width of not less than 200mm, the thickness is not less than 50mm, both ends should be set with a diameter of 4mm galvanized steel hoop two; rotten feet can not be used.(4) safety net, paint.(5) after the inspection and acceptance of the above parts have been classified and piled up in a neat and orderly manner, no water can be accumulated.2, scaffolding erection and removal(1) scaffold erection
Q:How to calculate the vertical force of scaffolding
First, the calculation of small beams: small beams in accordance with the strength and deflection calculation of simple beams, small bars in the upper bar. According to the small bar scaffold board and live loads above the maximum bending moment and deformation the uniform load calculation of small bar.
Q:New features of quick dismantling scaffolding?
Material: the main keel is made of cold rolled steel with 2mm thickness
Q:Which God can tell me what is required, how to get ah?
The same height of the building to be calculated separately, and ultimately is to pay attention to security, you can look at the yuan Tuo mall information on this aspect is still a lot of
Q:what do you think?pain wise? i know it's going to hurt as it's a peircing (duh) but will it hurt especially as it's two thick pieces of cartilage?
it looks awesome just make sure you keep it under clean conditions, once it gets inflammed it is SUPER painful and dangerous
Q:Cantilever beam type scaffolding can not exceed the maximum number of not married
An overhanging canopy should be the pillars of the non overhanging balcony canopy may be concave balcony, may also be the pillars of support (pretty much before the home house) pick style balcony canopy should be the cantilevered balcony canopy is not that direct pick out in the post

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords