• D814H Road Roller Buy D814H  Road Roller at Okorder System 1
  • D814H Road Roller Buy D814H  Road Roller at Okorder System 2
D814H Road Roller Buy D814H  Road Roller at Okorder

D814H Road Roller Buy D814H Road Roller at Okorder

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
300 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Product Name: D814H Road Roller

Parameter:


D814H Road Roller Buy D814H  Road Roller at Okorder



 

D814H Road Roller Buy D814H  Road Roller at Okorder

 

 


Advantages:
 

state-owned company

fortune 500 company

AAcustom


 

D814H Road Roller Buy D814H  Road Roller at Okorder

 


 


Why choose us?

1 sincre

CNBM International is a state company, now is one of the largest state-owned group cooperation in China! All the equipment such as tower cranes, produced by CNBM are compliant with the national level quality.

2 professional

Our engineers will at your services 24hours to solve all your tower crane installation and other questions.  Our goal is to provide the best professional services.

3 quality

 CNBM International’s tower crane  have strict quality control, only the best quality products can pass the test.

4speed

 We have professional sales team to guarantee your reply within 12hours to save your precious time.

5 After sales

If the tower crane has any problems, we will solve your problems in first time.


Inquies FAQ

My dearest friend, if you want to buy our tower cranes, please tell us the following parameters. And we will make the most suitable project for!

1. Building height or tower crane working height.

2. Max load capacity and tip load capacity.

3. Span or jib length

4. Other Special requirements




Q: Shaanxi impact roller manufacturers which scale is relatively large?
Aviation equipment, Harvey machinery, Yutong heavy industries, are good, hope to adopt
Q: How often does the roller change the engine oil? Is there a master pointing at one or two?
To see what brand of your engine, diesel, Hangzhou, Yuchai and so on domestic engine in general. From the beginning of the first factory replacement engine is the timer display 300 hours or work for three months should be replaced, at the same time to replace the filter, replacement according to the service condition and working environment and then, usually 250-550 hours. The worse the environment, the shorter the time, but less than 250 hours, as long as the oil viscosity, and through the oil traces can see the oil dipstick, metal color (oil slightly transparent), we do not recommend replacement, because it is a waste. Replace the oil and replace the filter at the same time, otherwise it will be wasted. In fact, when we go to the site service, listen to the user said, as long as life is not too busy, usually only once a year.
Q: XCMG alarm lamp for vibratory roller
Intek Advisory Network News: content tip: export ratio, roller industry before the five companies have a high degree of internationalization, but exports is relatively simple, basic to the single drumroller, accounted for 73% of export products; the mechanical single drumroller export accounted for further fell 4 percentage points. Research department statistics show that in 2013, China's Roller Road market overall situation better than last year. 2013 January, roller sales year-on-year growth momentum.
Q: What's the difference between a three wheel roller and a two wheel roller?
Three roller is the static compaction, without vibration function, used for compaction of embankment or base, two roller generally called double drum vibratory roller, roller tonnage than three small tonnage, mainly used for oil pressure, the asphalt concrete, with vibration function, the upper two wheels a water tank, can go on wheels to prevent water roller compacted asphalt concrete glued to the wheels.
Q: The second-hand roller Road on Taobao won't lie
It's not deceptive, but it depends on the fineness of the rollerAskDo you go to the place he sells?Chasing the answerOf course
Q: At the construction site, should the scraper, dump truck and roller be equipped with sprinkler?
Desired... First, it's cheaper.. Or because the construction will cause a lot of dust?.. Use a sprinkler to reduce dust
Q: Roller roller do large objective
Only two can press the road more tightly, so as to achieve a certain degree of compaction, width is to work efficiency, the greater the area of contact, the pressure will rise faster.
Q: slow pressing, high frequency and low amplitude". How do you understand the low amplitude behind it? Thank you
High frequency low amplitude is opposite to high frequency low amplitude low frequency high amplitude
Q: Who will hit the tank and roller collision?
The tank had high resistance in collided with the roller under the condition that the tank can put the roller open.
Q: Where are the rollers attached to the rollers?
Roller oil change cycle is usually 250 hours to replace, here 250 hours total working time per day, while changing the oil filter. If the environment is too bad (sand dust serious) can be replaced in advance. If you work less than 250 hours a year, it is recommended to change it once a year. But if you work less than 250 hours a year, it is recommended that you sell the road roller!

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords