• KS262D fully hydraulic single drum vibratory roller System 1
KS262D fully hydraulic single drum vibratory roller

KS262D fully hydraulic single drum vibratory roller

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
100 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Note1: Padfoot is optional to all the fully-hydraulic single drum vibration rollers with double drives.

 

A Professional and leading manufacturer for hydraulic road rollers,   many years experience for road construction machineries.

 

The factory covers an area of 140,000 square meters with more than 600 employees. Annual production capacity is 5000 sets of hydraulic road rollers.

 

The company integrates R&D, production, sales and service.

 

Production complies with IS09001 quality management system.

 

First-class configuration can meet various request from customers.

 

Products have been exported to more than 50 countries in the world.

 

Due to continual improvement of technologies, the technical specifications are subject to change without prior notice.

Main Features

 

Main Features

SAUER driving and vibration system brings the stability and reliability.

Imported vibration bearing, three prevention electric plugs are of good quality

Fully hydraulic Transmission and Fully electrical-hydraulic control facilitates the operation and enhances the automation.

The walking is driven by hydraulic motor, and the monolever-controlling and CVT facilitates the operation.

Double frequency and double amplitude vibration makes sure the excellent effectiveness of compaction.

Fully-hydraulic articulated steering

Maintenance-free battery cell facilitates the maintenance.

Automatic power shutting off for braking can make sure the safety and reliability.

The stream line configuration and upturning engine housing are complined with people's aesthetic standard.

 

项目 Item    

单位Unit

 参数Specifications

工作质量 Operating weight

kg

25500

静线载荷 Static linear load

N/cm

764

振幅 Amplitude

mm

2.05/1.00

振动频率 Vibration frequency

Hz

27/32

激振力 Centrifugal force

kN

430/295

速度范围 Speed range

km/h

0-9

爬坡能力 Gradeability

%

45

转弯半径 Turning radius

mm

6300

振动轮宽度 Drum width

mm

2180

振动轮直径 Drum diameter

mm

1650

最小离地间隙 Min. ground clearance

mm

486

发动机型号 Engine model

-

DEUTZ

功率 Rated power

kW

155

燃油箱容量 Fuel tank capacity

L

280

转向角 Steering angle

-

±35°

摇摆角 Swing angle

-

±12°

外型尺寸(XX)                                 Overall dimensions (L×W×H)

mm

6800x2520x3250

 

 

 

 

 

 

 

 

 

 

 

 

Q:How often does the roller change the engine oil? Is there a master pointing at one or two?
To see what brand of your engine, diesel, Hangzhou, Yuchai and so on domestic engine in general. From the beginning of the first factory replacement engine is the timer display 300 hours or work for three months should be replaced, at the same time to replace the filter, replacement according to the service condition and working environment and then, usually 250-550 hours. The worse the environment, the shorter the time, but less than 250 hours, as long as the oil viscosity, and through the oil traces can see the oil dipstick, metal color (oil slightly transparent), we do not recommend replacement, because it is a waste. Replace the oil and replace the filter at the same time, otherwise it will be wasted. In fact, when we go to the site service, listen to the user said, as long as life is not too busy, usually only once a year.
Q:What are the major components of a vibratory roller?
There are several kinds of vibratory rollers: single cylinder wheel, double steel wheel, rubber wheel and so on.Take a single cylinder as an example, the main components include engine, hydraulic system, steel wheel, drive axle, cab, electrical system, structural parts, etc.
Q:I've been driving the rollers for two years. Here we are in accordance with the basic salary + wages will shift law after the contract and benefit salary I now 800+ monthly rent when I remember most clearly my day and night dry for a month basically the month every day with 16 hours of work time more than I had the whole 1600 Qian Pingchang a month is 1000 you say they do about promising the old workers set the contract year is 3W to about 5W hey really worry awayAnd do this set not what a concept of time site live on what usually have something to do to some 1 midnight when the call sites work hot summer winter freeze to death and death awfully dirty wages so low done two years not given the contract (is not what the payment of insurance we say this promising)?
See how to think, than on less than more than enough...... Happy work is good..
Q:How does the municipal asphalt pavement budget do not have a wheeled roller?
Municipal asphalt pavement construction quota, already contains a roller and paving machine cost,
Q:In the process of asphalt pavement construction, can the wheel roller use diesel oil to clean the surface of the wheel?
If it is a metal wheel on the line, the general plastic wheel does not work, will be corroded, used up, remember to clean
Q:How many tons of rollers are needed for highway engineering?
The answer. Now there are a lot of sites with more than ten tons of roller. The selection of roller tonnage shall also consider the type of pavement structure and material type. It is not necessary to use such a large amount of compaction, and the larger the tonnage, the better the compaction. If the tonnage is too large, it is possible to crush the road material and destroy the pavement structure. After all, layered compaction, tonnage is small, can reduce the thickness of the layer, or increase the number of compaction, which can meet the requirements of compaction.
Q:That's how the rollers are charged
The engine comes with a little accelerator, and the generator will recharge itself
Q:The road from top to bottom, followed by 500 thick gravel, 300 thick cement stabilized macadam, 100 thick asphalt. While the gravel bottom elevation and elevation is very close to the top of the rain water, how to prevent the roller crushing rain water pipes?
There is no good way, the bottom of the 500 thick gravel can only be compacted with light rolling equipment, such as frog ram, impact rammer, etc., according to specifications above the pipe top 50 centimeters to use roller mill rolling.
Q:What are the foreign brands of domestic rollers? Which is the best?
Look, you're using it. If it's a bridge, buy an imported one. The price is pretty expensive. Import is the biggest advantage is that the earthquake frequency high, this is not better than the domestic, domestic machinery XCMG Luo capital good, want to buy a better selection of Taihe 31. Professional hydraulic roller. With the configuration of the words of Elcoteq's cheaper, 31 advertising played too much.
Q:That will not corrode the pavement, such as diesel oil, salad oil as are oil corrosion, although not corrosion of asphalt, but the corrosion wheel is not good, who have the sticky proof measures better, thank you "Nd}S + E, bbs.3c3t SqS + H human Y ~ ~ V
This is a dilemmaSuggest finding a bright migrant workerThe construction of diesel spray blasting,The standard of control is "non stick"

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords