Cuplock Scaffold System with Top Quality Factory Supply CNBM
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m.t.
- Supply Capability:
- 30000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details of Cuplock Scaffold System with Top Quality Factory Supply
Type: Heavy Section Steel
Forming: Welding Products
Standard:
Member:
Trademark:
Connection Form:
Carbon Structural Steel:
Residential Wall Structure:
Type of Steel For Building Structure:
Bs1139, En74 Standard:
Export Markets:
Descriptions of Cuplock Scaffold System with Top Quality Factory Supply
Cuplock is a kind of multi-purpose and versatile modular system scaffolding, suitable for access and formwork support in all types of construction of building & civil engineering projects, offshore projects, etc. This complete galvanized Cuplock system is probably the fastest and most widely preferred scaffolding system. It has flexible erection as straight, curved or circular configuration for both access and support purposes.
Futures of Cuplock Scaffold System with Top Quality Factory Supply
Multi-functional-with the universal joint and fully interchangeable components, the cuplock system can be used in most construction projects for both formwork and access. It is very versatile and diverse. Use in the shipping industries, oil and gas and aviation industries.
Versatile-Verticals are assembled with horizontals and diagonals using secure fixed cup connections. Its versatility has a distinct advantage to conventional scaffolding methods. A positive & ridged connection of four units is achieved in one single action. The cupock system is very cost effective and can be erected safely and quickly.
Time saving-cuplock scaffold is the solution for temporary structures Performance stages. Small teams can erect it safely and quickly.
Economical-Easily assembled system scaffold saves time and labor costs.
Durable-All components are hot dip galvanized and manufactures to international standard.
Easily Stored-Individual pipe elements can be packed in bundles for easy storage and transportation. For returns, material can be packed in steel racks.
The Main Components of Cuplock Scaffold System with Top Quality Factory Supply
Verticals
Description
Material
kg/pc
Article No.
9'10" Vertical 3.00m
Q345 φ48.3×3.2
16.90
SC1001 3000
8'2" Vertical 2.50m
Q345 φ48.3×3.2
14.20
SC1001 2500
6'6" Vertical 2.00m
Q345 φ48.3×3.2
11.60
SC1001 2000
4'11" Vertical 1.50m
Q345 φ48.3×3.2
8.90
SC1001 1500
3'3" Vertical 1.00m
Q345 φ48.3×3.2
6.20
SC1001 1000
1' Vertical 0.50m
Q345 φ48.3×3.2
3.50
SC1001 0500
Horizontals
Description
Material
kg/pc
Article No.
10'0" Horizontal 3.05m
Q345 φ48.3×3.2
11.80
SC1002 3048
9'0" Horizontal 2.74m
Q345 φ48.3×3.2
10.70
SC1002 2743
8'2" Horizontal 2.50m
Q345 φ48.3×3.2
9.80
SC1002 2500
7'0" Horizontal 2.13m
Q345 φ48.3×3.2
8.40
SC1002 2133
6'6" Horizontal 2.00m
Q345 φ48.3×3.2
7.90
SC1002 2000
6'0" Horizontal 1.83m
Q345 φ48.3×3.2
7.20
SC1002 1828
5'11" Horizontal 1.80m
Q345 φ48.3×3.2
7.10
SC1002 1800
5'0" Horizontal 1.52m
Q345 φ48.3×3.2
6.10
SC1002 1524
4'11" Horizontal 1.50m
Q345 φ48.3×3.2
6.00
SC1002 1500
4'1" Horizontal 1.25m
Q345 φ48.3×3.2
5.00
SC1002 1250
4'0" Horizontal 1.22m
Q345 φ48.3×3.2
4.90
SC1002 1219
3'6" Horizontal 1.07m
Q345 φ48.3×3.2
4.30
SC1002 1067
3'3" Horizontal 1.00m
Q345 φ48.3×3.2
4.10
SC1002 1000
3'0" Horizontal 0.91m
Q345 φ48.3×3.2
3.80
SC1002 0914
2'11" Horizontal 0.90m
Q345 φ48.3×3.2
3.70
SC1002 0900
8'0" Horizontal 2.44m
Q345 φ48.3×3.2
9.50
SC1002 2438
1'10" Horizontal 0.57m
Q345 φ48.3×3.2
2.40
SC1002 0600
FAQ
1. What is considerations of Scaffolding installation?
There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,
(1) scaffold frontage hurtful to prevent falling objects protection is required.
(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator
2.What are the certifications of your products?
Certified by SGS, BS1139, EN74, Local Test Report.
3. How long is the warranty period for your product?
Our products warranty is 2 years.
- Q: Said chrysanthemum disc scaffolding system, disc scaffolding system, wheel type scaffolding system, buckle scaffold, layher frame
- Cross barName specification A (mm) B (mm) theoretical weight (kg)
- Q: I want to know the classification of scaffolding in the building
- Steel pipe scaffold. The utility model is composed of two or more steel pipes of different specifications, such as a door type scaffold.
- Q: I've had my scaffolding piercing for about a week now and when cleaning i've just dabbed the hydrogen peroxide and salt water around my ear. However i read that i should be rotating it when cleaning it. Should i rotate it after only a week?
- Do what the piercer told you to do. If they didn't say and you are concerned, ring them and ask. Personally I would say don't; the fluid that the piercing naturally leaks while healing can cake on the bar and dry into tiny but alarmingly sharp lumps. If you push these into the piercing accidentally while turning it it will really really hurt! They can also damage the newly forming tissue, delaying healing and possibly creating excess scar tissue. The bar will move naturally with the movements of your body anyway within the constraints of (sorry if you're squeamish but I can't put it any more delicately) any crusting around the bar. Just keep it clean and keep hair and face products away from it and it should be great.
- Q: First of all, is it painful? Obviously it will be painful I know, but is it severe?Also, what cleaning solutions/products do I need to minimise the risk of infections?And what type of bar should I get? I've heard that Bioplast and PTFE allow for better flexibility and therefore quicker healing, but wouldn't a flexible bar lead to mis-alignment on the two pierced holes? If this is so, what types of steel are safe for initial piercings?Thanks c:
- Ask how long they have been piercing and what certifications (if any) they carry, additionally verify close by regulations to ascertain if any are required. additionally ask how generally they spore verify their autoclave and while it grew to become into accomplished final time. Ask to ascertain a portfolio of HEALED piercings, exceptionally pictures of in spite of piercing you try to get.
- Q: What does my earth science teacher mean when he says to do a powerpoint with Link Scaffolding,how d u do it?
- Link Scaffolding = A search found no answer. - Ask teacher to clarify.
- Q: Topic?Scaffolding construction program how to doSpecial construction scheme
- 6, the vertical bar is arranged, it is necessary to consider the distance between the horizontal bar. The general spacing should not be greater than 1.5 meters (through the calculation of the pressure bar instability spacing);7, pay attention to the level of the rod near the ground and the top of the surface must have a rod (some people do not think this is necessary, but often up and down instability is difficult to insurance);8, the longitudinal brace configuration, with full support from top to bottom bracing will cross 45 degrees continuous configuration, intermediate cannot disconnect (i.e. a brace from the top to the ground, the middle long); brace configuration based on experience, but also can be calculated (using coplanar force system, theoretical mechanics learned);9, lateral bracing configuration, the same as the vertical;10, considering the load loading calculation of concrete three days is enough, if the concrete two times, loading unnecessary all add up, because the first pouring concrete general solidification, not the calculation of the load, favorable.
- Q: Who has external scaffolding construction program
- Construction preparation1.1 parts1.1.1 pipe1 scaffolding steel pipe with Phi 48mm, wall thickness of 3.5mm; horizontal horizontal bar maximum length of 2200mm, the maximum length of other rods 6500mm, and the maximum quality of each steel pipe should not be greater than 25kg.2 the size and surface quality of steel pipe shall meet the following requirements:1 new steel pipe should have quality certificate, quality inspection report; steel surface should be straight and smooth, should not have cracks, scarring, stratification, dislocation, hard bend, burr, indentation and deep way;
- Q: Are the terms quot;nuclear matrixquot; and quot;nuclear scaffoldquot; interchangeable? I know that when we talk about DNA compaction we say that MARs on the DNA attach to the nuclear scaffold. I am wondering if the scaffold is just a specific part of the matrix??
- For most purposes, they are interchangeable terms for the same things. Some people favor one term, some the other. The ones who favor matrix over scaffold or vice versa may have some argument as to why it is better or a difference but in general people use them interchangeably.
- Q: Okay so I got a scaffold piercing about 5 days ago now. I've been cleaning it with Claire's piercing stuff. What I do is I pour it onto a little bit of loo roll and squeeze it all out on where the holes are. I have not been twisting it at all, but my friend told me that I should soak it in warm salty water and twist it twice a day. I have no idea what to do now as I have researched it and some people say that I shouldn't twist it because it will drag more bacteria into it and could get it infected. Also I have massive scabs around both ends of the bar, I've tried to pick them off as they are pretty uncomfortable, but it didn't work as they are rock solid, so how do I get these off? I have no idea what to do, my piercer didn't say anything about twisting it just cleaning it twice a day. Oh and if it helps I'm 13:) Thanks. X
- Why are you using Claire's crap? You need to be doing sea salt soaks twice a day for 5-10 minutes each soak with 1/4th of a teaspoon of non-iodized sea salt to 8oz of hot water. Don't twist them as that drags in crust and bacteria and tears up the inside of the piercing. Stop trying to pick stuff off from your ear and go have a reputable piercer check out the scabbing, it could be crust it could be something wrong. If your piercer didn't tell you to do sea salt soaks to keep it clean go to a better piercer.
- Q: I'm interested in a scaffold career in the oil rigs in the north sea
- Sorry if I'm not serious, but go to Hong Kong as there they do scaffolding made of bamboo and 170 floors high ,2000mtrs above the sea level... Now that is serious...
Send your message to us
Cuplock Scaffold System with Top Quality Factory Supply CNBM
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m.t.
- Supply Capability:
- 30000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords