• Cuplock Scaffolding System---Side Bracket Factory Supply  CNBM System 1
  • Cuplock Scaffolding System---Side Bracket Factory Supply  CNBM System 2
  • Cuplock Scaffolding System---Side Bracket Factory Supply  CNBM System 3
Cuplock Scaffolding System---Side Bracket Factory Supply  CNBM

Cuplock Scaffolding System---Side Bracket Factory Supply CNBM

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m.t.
Supply Capability:
30000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

  • Quick Details of  Cuplock Scaffolding System---Side Bracket Factory Supply 

  • NameCuplock Scaffold System
    SizeMany sizes or as your request
    Main MaterialQ235/345 Steel
    Surface TreatmentHigh Protected Painted, Powder Coating, Electric Gavenized, Hot Dip Gavenized.
    ColorSilver, Orange, Red
    CertificateSGS, EN12810.
    ServiceOEM Service available
    MOQ50T
    PaymentT/T, Western Union
    Delivery Time15-25  days  after  deposite
    Packingin bulk or steel pallet or as your request
    production capability50 tons per day
    Main  MarketAfrica, South America, the Middle East and Asia
  • Cuplock Scaffolding System---Side Bracket Factory Supply  CNBM

  • Cuplock Scaffolding System---Side Bracket Factory Supply  CNBM

  • Cuplock Scaffolding System---Side Bracket Factory Supply  CNBM




Descriptions of Cuplock Scaffolding System---Side Bracket Factory Supply 

Cuplock is a kind of multi-purpose and versatile modular system scaffolding, suitable for access and formwork support in all types of construction of building & civil engineering projects, offshore projects, etc. This complete galvanized Cuplock system is probably the fastest and most widely preferred scaffolding system. It has flexible erection as straight, curved or circular configuration for both access and support purposes.


Futures of  Cuplock Ring Lock Frame Scaffolding System

1.Cuplock scaffold system is simple in structure,including top cup,bottom cup and ledger blade.

  

2.Quick installation of horizontals and verticals,you can easily fit the ledger blade into the cups with a hammer.

 

3.Cuplock scaffold system standards are made from higher quality steel tube which allow more than 58KN load per leg.

 

4.Cuplock scaffold system is a multi-functional scaffolding system which is suitable for all forms of access and support structures,especially used in bridege building.

 

5.People can fasten joint of ledgers by putting two extra ledger blades in the cups.

6.This cuplock scaffold system are interlocked by cups and ledgers which is very safe and stable steel scaffolding system.

7.This is a heavy duty scaffold system which can load about 16tons for each cuplock scaffolding system.

8.Cuplock scaffold system can be used both interior or outerior high-rise building construction project, expecially for arc shape building such as bridge, tunnel, subway, or gym building. it's multifunctional.

9.This is a galvanized cuplock scaffold system which surface is hot dip galvanized, it can keep a longer working life.

10.Gavanized cuplock scaffold system is water-proof scaffold sysem which can prevent the air and water to damage the cups and ledgers very effectively.

11.Cuplock scaffold system can be quick to errect by interting  the cuplock blade into bottom cup, then swivel the top cup to fixed it.

12.Suitable for transportation and storage: Single cuplock scaffold system standard and ledger occupy less space. Wiht no extra parts.


  • The Measures of Cuplock Scaffolding System---Side Bracket Factory Supply 

  • Standard: 3000mm, 2500mm, 2000mm, 1500mm, 1000mm, 500mm. 
    Ledger: 3000mm, 2000mm, 1780mm, 1500mm, 1000mm, 500mm. 
    Diagonal brace: 3000X2000mm, 1780X2000mm, 1000X1500mm, 1000X2000mm, 1500X2000mm, 
    Tube specification: Φ 48.3X4.0mm, φ 48.0 X3.25mm, φ 48.0 X3.0mm 

  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Q: What is the mobile scaffolding materials
The overall life of cold galvanized mobile scaffolding accessories for about 5 years, the surface does not require maintenance, moderate cost. The main processing technology: the welding of the scaffolding parts and then galvanized, the surface of each part, are galvanized
Q: How long is the service life of disc scaffolding?
In the service life of the product if the corrosion and deformation can not be put into the construction of the building.
Q: For the current stage of China's construction should not strengthen the specific meaning of scaffolding and support by way of the scaffolding and support the specific distinction and significance
At the present stage Chinese people-oriented, building a harmonious society, especially the importance of safety in production site, in addition to constantly modify the security specifications and technical documents issued by a variety of real-time safety, strengthen safety measures, compulsory accident insurance and so on. JGJ130-2011 is the new version of the construction of steel tubular scaffolding safety technical specifications should be strengthened scaffolding construction management. The current JGJ162-2008 is the safety technical specification for the construction of fastener type steel pipe formwork support.
Q: Fastener type steel pipe scaffold accessories
fastenerFastener type steel pipe scaffold fastener malleable iron casting should be adopted, its basic form has three kinds: vertical cross bar for a connection between the rectangular fastener, fastener for rotating connecting parallel or oblique bars and rods for butt joint butt joint fastener.
Q: Im in college football, I would be puting on and taking off my helmet, I usually keep it on though during practice...but would it be wise for me to get an industrial piercing a couple months before 2 a days and the football season...would the sweat maybe infect my ear, but I am a very clean guy? thanks, if you have an answer it will help my decision.....
trust me, bro. bad idea. industrials are very tempermental at best. your helmet will cause every problem possible. any descent piercer would tell you the same. don't do it. they take up to a year to heal soif you really want one, quit football or wait til you're out of school.
Q: I would like to ask how much scaffolding steel prices, scaffolding steel pipe use what are the requirements?
General price of 3800-4200 yuan per ton, you need to see the material and specifications.1. Scaffolding steel pipe material Q195, Q215 or Q2352. Scaffolding steel pipe specifications of 3, phi, phi, phi, phi, phi, phi, 2.5, phi = phi, phi, phi, phi, phi, phi, phi, phi, 3.25, Phi3. Scaffolding steel pipe length of 1-6 meters, half a meter specifications can be customized according to customer specifications4. Scaffolding steel pipe standard SY/T5768-95 GB/T3091-2001
Q: What are the requirements for acceptance of external scaffolding? Want to know before
7, scaffolding erection should be higher than the top of the building or the operating surface of 1.5m or more, and add enclosure. 8, the erection of the scaffolding on the steel pipe, fasteners, foot board and connection points shall not be arbitrarily removed. When necessary, the construction site must be approved by the person in charge of the site and take effective measures. 9, the use of scaffolding, the site should be responsible for the organization of inspection and acceptance, acceptance and fill in the inspection form before use. In the construction process should be professional management, inspection and warranty, and periodic settlement observation, found abnormal should take timely reinforcement measures.
Q: I have some scaffolding that I would like to use to build a temporary slide to my swimming pool. The slide I would like to be made out of the side parts which are the ones like rectangles with bars going across them and I have a variety of poles. I would then like to put a slippery tarpaulin on to the frame.But how would I hold the tarpaulin up, because the metal poles will be too short? So that if someone slid down it they would not just burst through the tarpaulin and hit the floor after hitting around five metal poles!
Why would you even consider something like that? Obviously you kids and your family use this pool, why put them at risk making a temporary slide with scaffolding. Not a good idea.
Q: The scaffold weighs 204 N and is 3.10 m long. What is the force each rope exerts on the scaffold when the 665 N worker stands 1.00 m from one end of the scaffold? N (smaller force) N (larger force)
Sum moments left side...(assume worker 1m from left) Right rope = 316.516 Sum vertical.... Left rope = 552.484
Q: i have an interview tomorrow but have a scafold piercing in , its been in there for about 2/3 months nearly healed competely , how ling can i leave it out for , maybe 30-45 minutes? thanks
They take around 6-9 months to heal completely...you shouldn't be taking it out at all. I stupidly took mine out after 3 months to clean a bit behind the bar and the bar would never go back through the top hole. It hurt like crap and bled profusely if I tried to push it through.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords