• Cup-lock Scaffolding with High Performance, Greater Quality System 1
  • Cup-lock Scaffolding with High Performance, Greater Quality System 2
  • Cup-lock Scaffolding with High Performance, Greater Quality System 3
Cup-lock Scaffolding with High Performance, Greater Quality

Cup-lock Scaffolding with High Performance, Greater Quality

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
3000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. Main Introduction of Cup-lock Scaffolding:

Name: Cup Lock Scaffolding 

Category: Scaffolding system 

Material: Steel (Q235/Q345) 

Size: as your requirement 

Surface:  Electro Galvanized/Self Color/Painted/HDG 

Component: Standard, Ledger, Strengthened ledger, Transom Beam, Diagonal, Bracket, Top cup, Bottom cup, Ledger blade, etc.  

Application: Highways/Subways, Bridges, Tunnels and Fire Electrical Engineering, Marine Engineering.

Simple structure: The main parts include the standard, ledger and brace, it is easy to assemble and disassemble, and also easy to storage, transfer and maintain.

Safety and Steady: 

The up cup has the screw friction and self-gravity, it could self-lock steady, this makes the ledger steady, the loading of the ledger could transfer to the standard through the down cup, even the up cup is loose, the ledger joint could connect with the standard steady.


2. Structure of Cup-lock Scaffolding

Cup-lock Scaffolding consists of adapter plug of cup-lock, post, cross bar ,diagonal brace ,top bar, base and other fittings. The adapter plug of cup-lock is the core and consists of top cups, bottom cups, post ,ledger connections and limit pins of top cups.

It can be widely used for industrial and civil construction and maintenance, such as workshop, large gymnasium, conference& exhibition center conversation, billboard, market, dock, tunnel, subways, etc. used for mobile working platform installation of electrical & mechanical engineering, ship repair and other decoration engineering, for building temporary stand ,withsimple roof frame, frame-connected Scaffolding can from temporary dormitory, depot and work shed.


3. Main Features of Cup-lock Scaffolding

.Multifunction: equipments of construction with different size and load of construction could be assembled, such as one-size double-sides scaffolding, props, etc. Applied to high-rise building, bridge, water tower, and so on.

.Avoid using bolt in assembly and low down labor intensity

.Reliable bending, shearing, torsional strength of dentation &cup-lock connection, the overall of it is more stable than normal

.Not easy to lose fastener, portable firm and easy to maintain and transport 


4. Cup-lock Scaffolding Images 

Cup-lock Scaffolding with High Performance, Greater Quality

Cup-lock Scaffolding with High Performance, Greater Quality

.jpg


5. Cup-lock Scaffolding Specification

.There is a pair of adapter plugs of cup-lock every 0.5m-0.6m on the post and top bar

.5 times fast of adapter plug assembly and disassembly than normal 

.Assuring construction of high-rise scaffolding with the whole safety facilities, the safety and reliability in usage


6. FAQ of Cup-lock Scaffolding

1) What can we do for you? 

We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

.We can provide you the professional design team.    

.We can provide fashionable and newest styles for you.    

.We can design the artwork for you.    

. Please feel free to customize.  

 

2) What promises can be done by us?

. If interested in Cup-lock Scaffolding, please feel free to write us for any QUOTE.

. If printing required, please advise asap because the whole set need much more time to complete.

. Please DO check goods when courier knocks your door and contact us asap if any issue.

 

3) What about of our after-sale service?

. Response will be carried out in 24hours  after receiving any complain or request.

. Frame-Connected Scaffolding cost can be refund after order is confirmed. 

. If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

 4) What about the package and shipping time?

.Packing:  As Customer's Requirements

.Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

.Shipping time:

Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. 

Other mass qty of Cup-lock Scaffolding, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.  

 


Q: I bought 100 tons of scaffolding steel pipe, according to the 150 tons of rack pipe to prepare various kinds of fasteners and fastening screws. How to calculate.. Thank you all
For flexural members:When combined with wind load is 1.2SGK+1.4SQKCombined wind load is 1.2SGK+1.4SGKFor axial compression member:When combined with wind load is 1.2SGK+1.4SQKThe combined wind load is.2SGK+1.4 * 0.85
Q: Explain the principles of scaffolding?
I know the perfect solution if you are just starting with woodworking and also if you have already experience with it. I reccomend to give a look to this website ( woodworkingplans.kyma ) You can find a lot of woodworking plans and you will be able to manage the projects with a CAD/DWG software. It allows you to modify the projects and to alter the arragements. If you are a beginner this is the easiest way to start, it's the best approach to woodworking; and if you already have experience you will find a lot of ideas and inspirations to improve your abilities with woodwork. I'm sure that you will love it!
Q: how will i clean it as its very tender to touch.. :(
The best thing to use is sea salt soaks: Add 1/4 of a teaspoon of Sea salt (available in supermarkets) to a mug of kettle boiled water, mix and leave to cool slightly before applying it to the piercing. For this particular piercing it may be best to dip and soak your ear in the cup of solution and leave it there until the water cools. After this rinse away any excess salt, dry carefully, with a cotton bud gently remove any crusty bits and avoid touching it at all, especially with dirty hair/shampoo and conditioner etc. Do this twice a day for a few months after which you can cut down to doing it just once a day and just rinse it with the warm water in the shower.
Q: I got my scaffold pierced last thursday (it is now monday) and it hurts soooo much! i cant even lean it properly, its not infected its just because when i knock one part of it the whole thing hurts, and my hair keeps getting knotted around it etc, can someone tell me who has had experience with this piercing when it will heal?
once I have been given my ears pierced professionally, they only injury for a pair days, consistent with probability a week if I messed with them too lots. Later, i for my section double pierced my earlobes with a sterile needle at residing house, that is been over a month and it nonetheless each and every now and then hurts once I sleep on it strange. that's my journey, in spite of the incontrovertible fact that it relies upon in the event that they use a gun or a needle, the place precisely you have it pierced, and different components nonetheless can exchange (infections) the quantity of healing time. yet an excellent ballpark determine is a few million-2 weeks, yet i understand people who's discomfort can final a month. good success, and verify you hit upon an excellent expert piercer, and not the interior sight mall loose piercing preteen shops :).
Q: Floor type scaffolding construction program is what kind of, what role?
Job requirements;(4) has the advantages of simple structure, convenient assembly and disassembly;(5) according to local conditions, local materials. ?3 load of scaffold, masonry engineering requirements: 2700N per square meter per square meter 2000N, decoration engineering, scaffold in 2500N per square meter per square metre, scaffold 1000N, special circumstances should be determined by calculation. ?4, left foot hand eye regulation: a single exclusive console scaffold should be set foot on the wall as a small bar in the eye, the fulcrum, attention not allowed to keep the foot hand eye position: adobe walls, soil nailing wall, hollow brick, brick cavity wall, independent column, half brick wall and 180 thick brick wall, brick lintel and a beam of 60 degree angle triangle, windows and doors on both sides of the 3/4 brick and 1 brick range?.
Q: What is the difference between the bowl buckle scaffold and the fastener type steel pipe scaffold? What is the difference
. Its main function is to protect. Specific reference to JGJ 1302011 "construction fastener type steel pipe scaffolding safety technical specifications" in the relevant instructions, and illustrations.
Q: A scaffold of mass 53 kg and length 6.5 m is supported in a horizontal position by a vertical cable at each end. A window washer of mass 80 kg stands at a point 1.7 m from one end.(a) What is the tension in the cable closer to the painter? _______________N(b) What is the tension in the cable further from the painter? _________________N
Static Equilibrium: ΣTorques: 53g(3.5) + 80g(4.8) = T(6.5) {where T = ANS (a) (53)(9.8)(3.5) + (80)(9.8)(4.8) = 6.5T 1817.9 + 3763.2 = 6.5T 5581.1 = 6.5T T = 5581.1/6.5 = 859 N ANS (a) Total weight = (53 + 80)(9.8) = 1303 ANS (b) = 1303.4 - 858.6 = 444 n
Q: The kind of hot galvanized scaffolding, many site use is very beautiful now, I would like to ask the material and the characteristics of this shelf there is how to install?
Along with the new Pankou scaffolding erection characteristics of the rapid rise in the rapid support system in how to install?First we look at the popularity of related knowledge, also known as scaffolding, disc type, pin type scaffold, Rhea frame called in foreign countries, according to their use can be divided into two types of formwork support and scaffolding. At present, the domestic application is more common template support, as well as the decoration of the operation of the rack. We use the Tianjin nine Industrial Company Limited production of the socket type scaffold, for example:
Q: What is the previous version of the scaffold fastener (JGJ166-2008) for construction? That is, the implementation of the current version of JGJ166-2008 will soon be replaced by 2009.7.1 version.
JGJ130-2001 is the construction of steel tubular scaffold safety technical specifications in the second half of the new version JGJ130-20112011 December 1st implementation
Q: So a week ago today I got my industrial pierced. The pain was what I expected and afterwards it was very sore (as expected) however a week later it is a still rather sore and swollen and (I hate to be disgusting) quite crusty with dried blood/yellow stuff. I clean it everyday with salt water solution but I was just wondering if this was normal or should I take the piercing out?
That's normal! It'll be sore like that for a month or so.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches