Cup-lock Scaffolding with High Performance, Greater Quality
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 3000000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Main Introduction of Cup-lock Scaffolding:
Name: Cup Lock Scaffolding
Category: Scaffolding system
Material: Steel (Q235/Q345)
Size: as your requirement
Surface: Electro Galvanized/Self Color/Painted/HDG
Component: Standard, Ledger, Strengthened ledger, Transom Beam, Diagonal, Bracket, Top cup, Bottom cup, Ledger blade, etc.
Application: Highways/Subways, Bridges, Tunnels and Fire Electrical Engineering, Marine Engineering.
Simple structure: The main parts include the standard, ledger and brace, it is easy to assemble and disassemble, and also easy to storage, transfer and maintain.
Safety and Steady:
The up cup has the screw friction and self-gravity, it could self-lock steady, this makes the ledger steady, the loading of the ledger could transfer to the standard through the down cup, even the up cup is loose, the ledger joint could connect with the standard steady.
2. Structure of Cup-lock Scaffolding
Cup-lock Scaffolding consists of adapter plug of cup-lock, post, cross bar ,diagonal brace ,top bar, base and other fittings. The adapter plug of cup-lock is the core and consists of top cups, bottom cups, post ,ledger connections and limit pins of top cups.
It can be widely used for industrial and civil construction and maintenance, such as workshop, large gymnasium, conference& exhibition center conversation, billboard, market, dock, tunnel, subways, etc. used for mobile working platform installation of electrical & mechanical engineering, ship repair and other decoration engineering, for building temporary stand ,withsimple roof frame, frame-connected Scaffolding can from temporary dormitory, depot and work shed.
3. Main Features of Cup-lock Scaffolding
.Multifunction: equipments of construction with different size and load of construction could be assembled, such as one-size double-sides scaffolding, props, etc. Applied to high-rise building, bridge, water tower, and so on.
.Avoid using bolt in assembly and low down labor intensity
.Reliable bending, shearing, torsional strength of dentation &cup-lock connection, the overall of it is more stable than normal
.Not easy to lose fastener, portable firm and easy to maintain and transport
4. Cup-lock Scaffolding Images
5. Cup-lock Scaffolding Specification
.There is a pair of adapter plugs of cup-lock every 0.5m-0.6m on the post and top bar
.5 times fast of adapter plug assembly and disassembly than normal
.Assuring construction of high-rise scaffolding with the whole safety facilities, the safety and reliability in usage
6. FAQ of Cup-lock Scaffolding
1) What can we do for you?
We can ensure the quality of the vinyl banner and avoid extra expenses for customers.
.We can provide you the professional design team.
.We can provide fashionable and newest styles for you.
.We can design the artwork for you.
. Please feel free to customize.
2) What promises can be done by us?
. If interested in Cup-lock Scaffolding, please feel free to write us for any QUOTE.
. If printing required, please advise asap because the whole set need much more time to complete.
. Please DO check goods when courier knocks your door and contact us asap if any issue.
3) What about of our after-sale service?
. Response will be carried out in 24hours after receiving any complain or request.
. Frame-Connected Scaffolding cost can be refund after order is confirmed.
. If the products are not based on the requirements, there will be the relevant compensations made for you.
4) What about the package and shipping time?
.Packing: As Customer's Requirements
.Shipping: We have various shipping ways for our customers, such as express which including TNT, DHL, FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.
.Shipping time:
Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days.
Other mass qty of Cup-lock Scaffolding, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.
- Q: Attached to the lifting scaffolding installation site how to write
- All obstructions have been removed and all unnecessary restrictions have been removed. Power system can run normally. All the scaffolding bowl bowl has tight connection point.
- Q: what is differences between scaffold and scaffolding?
- Scaffold is what scaffolding is constructed of.
- Q: The contents of the inspection and evaluation of steel tubular scaffold with bowl buckle are as follows.A. frame protectionB. loadC. foot plateD. bar lockE. frame stability
- Disclosure and protection acceptance. General projects include: frame protection, material, load, channel. Option A, B error.
- Q: I mean, anybody knows when will they finish the exterior restoration?
- My friend, the restoriation of the outside facede of the Guggenheim Museum should be completed in spring of 2008. The exterior restoration is part of $29 million restoration project to the 46 year building. Good luck Native New Yorker
- Q: I'm 16 and I already have 3 piercings in each lobe, one on one ear stretched to 12mm. I didn't really think they hurt that much. I also have my nose pierced and had that done with a needle (thus hurting more than a gun) and I mean that hurt but I didn't cry or anything or start freaking out. If I do get my scaffold piercing I'll be going to a very good and trusted piercing and tattoo shop, where the person piercing me will probably be someone I know, so I completely trust them. I am pretty good with pain I supposeI just want some idea of how much it will hurtThankyou (:
- Yes. It like someone pinching you for a short period of time
- Q: I would like to ask the bowl buckle scaffold operating layer is what?
- The difference between the role of the first, the first is the use of indoor or roof construction scaffolding, commonly known as the full house scaffolding, mainly to play a supporting role.
- Q: JGJ 130-2011 also has a carpenter scaffolding specification, who has to share the upload thank you
- Technical code for safety of steel tubular scaffold with couplers in construction of JGJ 130-2011
- Q: So a week ago today I got my industrial pierced. The pain was what I expected and afterwards it was very sore (as expected) however a week later it is a still rather sore and swollen and (I hate to be disgusting) quite crusty with dried blood/yellow stuff. I clean it everyday with salt water solution but I was just wondering if this was normal or should I take the piercing out?
- That's normal! It'll be sore like that for a month or so.
- Q: truss or frame (?) which is preferred between the two in making scaffoldings and why?
- problematic point. research onto yahoo and bing. that will will help!
- Q: i want to know what pole diameter (inner) would fit securely over a standard scaffolding polethanks
- Are you talking 1 length of scaffolding pole they're normally 48mm outside diameter so if you get a 50mm (2) covering it should fit over it ok.
Send your message to us
Cup-lock Scaffolding with High Performance, Greater Quality
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 3000000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches