Crawler Mounted Platforms 23m
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Model: | FM230 |
Max.working height | 23m |
Max.platform height | 21m |
Loading capacity | 200kgs |
Lateral Outreach | 9.30m |
Platform rotation | 180° |
Jib rotation | 120° |
Turntable rotation | 360° non- continuous |
Size of platform | 1.2*0.8*1.1m |
Overall stowed length | 6.50m |
Overall stowed width | 1.60m |
Overall stowed height | 2.10m |
Power capacity |
|
Standard power source | diesel engine |
220V AC power | |
Driving speed | 0-1.7km/h |
Max climbing ability | 30° |
Total weight | 3700kgs |
- Q: Does the fixed hydraulic platform need to submit to the specification requirement
- There is no clear regulation of hydraulic lift and hydraulic platform in China, which means that you can also do it without testing. Local regulations may be different. Also, if you check, you are going to the local quality and technical supervision bureau. Should go to the special branch to register, apply for installation, after installation is finished again ask them to check the acceptance of the check. There is a fee for it. And it will be checked every year.
- Q: What is the elevating platform for automatic mahjong machine?
- This kind of failure, because after lifting motor flange loose inside the case, if there are no loose motor flange, it is lifting motor capacitor needs replacement, motor damage possibility is not big, most are motor capacitance shock wear caused by the inability to fail, knowing all think will be the motor is broken
- Q: How does a button in the PLC control the elevating platform
- The recommended answer is wrong, and the platform should stop at any location. You can either push the button or click the number of times to tell whether it's up or down. For example, press the ascent in one second, press two, and press the button to stop. Instructions will use timers, counters, and pulse detection. You get the idea.
- Q: The design of graduation is designed for mobile shearing and hydraulic lift
- Aluminum alloy lift, lift platform aluminum, aluminum alloy lift platform, aluminum alloy elevator, shear fork lifter, cut shear fork lifts, the fork lifts, elevator guide rail type, guide rail type cargo-lifts, set of cylinder type elevator, set of cylinder type lift table, set of cylinder type elevator, fork lift platform, guide rail type lift platform, set of cylinder lifting platform, electric lift high quality manufacturer, welcome new and old customers to choose
- Q: What device is better to design a platform that is 1 square meter or so?
- It's not clear what your specific application environment is, so you're not sure how to provide specific solutions.
- Q: Operation and attention of electric elevating platform car?
- When the working pressure of the platform is too high or the noise is abnormal, the inspection should be stopped immediately so as not to seriously damage the platform. For general failures, see (troubleshooting and troubleshooting); G, the wind should not be greater than 5 when used, and the machine should not be used in thunderstorm. Note: A, non-electric professional personnel should not disassemble the electrical appliances at will, in case of electric shock or mistake. B: the platform should be hoisted on the platform when the platform is being repaired under the platform. In case the platform suddenly drops, causing casualties;
- Q: Is the music console working? Want to start a, afraid to buy expensive again.
- And, it's easy to adjust, because the built-in gas spring, the girl can adjust the height easily. At the same time, 150 cm to 185 height is suitable.
- Q: What is the difference between elevator and elevator platform and high-altitude platform
- The elevator will use the motor to reverse the deceleration and pull the cable to lift the basket. The platform, like the high-altitude operating platform, USES hydraulic oil to pressurize or unload the platform. High altitude (pinyin: gao kong zuo ye) refers to the work performed at a certain location on a high level. National standard GB 3608-2008 "high job grading" regulation: "where in the fall for more than 2 m height datum (2 m) to operate the heights of the likely to fall, are called high homework." According to this rule, the scope of the construction industry is quite extensive. When working in a building, operate on a shelf above 2m.
- Q: The hydraulic cylinder with hydraulic platform is changed to whether the cylinder is feasible
- Certainly not, the unit pressure difference is very big, not applicable..There must be no seal conditions.
- Q: What is the main shaft of the horizontal milling machine
- Horizontal movements of spindle of the milling machine is driven by servo motor, each after a pair of tooth belt pulley deceleration, to the longitudinal, transverse and vertical feed movement of the ball screw to achieve three direction.
Send your message to us
Crawler Mounted Platforms 23m
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords