• 30M Crawler Mounted Platforms System 1
30M Crawler Mounted Platforms

30M Crawler Mounted Platforms

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Model:FM300
Max.working height30M
Max.platform height28M
Loading capacity200KGS
Lateral Outreach11M
Platform rotation180°
Jib rotation180°
Turntable rotation360° non- continuous
Size of platform1.2×0.8×1.1M
Overall stowed length7.70M
Overall stowed width1.7M
Overall stowed height2.10M
Power capacity 
Standard power sourcediesel engine  
220V AC power
Driving speed0-1.5KM
Max climbing ability30°
Total weight4700kgs



Q: There is no easy way to push the goods when the platform is loaded.
There are several rollers or balls on the workbench that can move from above, not knowing what you are doing. If necessary, a friend can leave a message.
Q: How does hydraulic platform change sealing ring, how to operate
Because the concrete structure of hydraulic cylinder is different, the order of disassembly is different, and it should be judged according to the specific situation.
Q: To make a four trapezoid screw lifting up seven tons of lifting platform should be matched with the straight screw and motor
Force teck can offer the synchrolifting lifting system design, a full set of accessories combination: spiral elevator, commutator, drive shaft, shaft coupling, gear motor, as well as the system, a full set of CAD drawings, and the scene debugging
Q: How to improve the oil leakage line
If it's an interface leak, you need to check if the interface is loose and the seal is broken. Or the interface design is not reasonable, you need to improve the interface.
Q: How do I design this hydraulic lift?
Do you do it by yourself or by design? I can give you a simple composition on qq1140283127, but I can't stick it
Q: The advantages and disadvantages of using diesel engine as an engine
Most of the diesel engines are low speed machines, with a speed of about 100 revolutions per minute, which can drive the propeller directly. Improved fuel consumption of diesel engine power plant to the lowest, and lift platform can use cheap residue, high reliability, the thermal efficiency can be closer to 50%.
Q: What standard elevator platform needs to go to the special equipment inspection to report
Hello, it should be the elevator that is rated above or equal to 0.5 t, which belongs to the special equipment management scope. Let's take a look at this rule. Special equipment safety inspection regulations
Q: What happens when the platform comes up and the power goes out.
In pump station oil outlet on the right side with a nut, the nut off, is within the six-party of the screw, counterclockwise, the platform can fall, fall after what must tighten screw clockwise, the back nut, so that next time can normal use
Q: What should the chain's main elevator be aware of when installing the chain
The rail link elevator usually requires a design pit. For equipment and the ground level factors, design should be carried out in accordance with the actual demand design pit size, at the same time when the production equipment shall be carried out in strict accordance with the size of the pit production.
Q: What is the main shaft of the horizontal milling machine
Horizontal movements of spindle of the milling machine is driven by servo motor, each after a pair of tooth belt pulley deceleration, to the longitudinal, transverse and vertical feed movement of the ball screw to achieve three direction.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords