• Crane TC7135 ConstructionEquipment Building Machinery Distributor Sales System 1
  • Crane TC7135 ConstructionEquipment Building Machinery Distributor Sales System 2
  • Crane TC7135 ConstructionEquipment Building Machinery Distributor Sales System 3
  • Crane TC7135 ConstructionEquipment Building Machinery Distributor Sales System 4
  • Crane TC7135 ConstructionEquipment Building Machinery Distributor Sales System 5
  • Crane TC7135 ConstructionEquipment Building Machinery Distributor Sales System 6
Crane TC7135 ConstructionEquipment Building Machinery Distributor Sales

Crane TC7135 ConstructionEquipment Building Machinery Distributor Sales

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Tower Crane TC7135 Description:

1.CMAX Tower Crane TC7135  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC7135 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC7135 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC7135  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC7135  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC7135 Parameter:

 Max. working range 71m, tip lifting weight 3.5T and Max. lifting weight 16T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50

Max height with attachment (m) 200

Working range can be adjusted (m) 50、55、60、65、71

Min working range (m) 2.5

Max lifting capacity (t) 16

Tip load @ 50m (t) 3.5

Tower Crane TC7135  Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC7135 Diagram:

Crane TC7135 ConstructionEquipment Building Machinery Distributor Sales

Crane TC7135 ConstructionEquipment Building Machinery Distributor Sales

Tower Crane TC7135 Technical Sheet:

Crane TC7135 ConstructionEquipment Building Machinery Distributor Sales

Tower Crane TC7135 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC7135 for example, the first two letters “TC” means Tower Crane, “71”means jib length is 71 meter, and the last two letter “35” means the tip load is :3.5 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Q: how is a tall crane constructed? how can they put the crane on top of its tall body frame?
They first construct the top of crane on the ground with help from other mobile cranes. This includes the long horizontal part with the operator's cab, and the concrete counterweight. this is then placed on a climber, with which the crane kind of builds and climbs itself to the necessary height. Every vertical section of the crane is placed in the climber. When the piece is in place, the climber climbs to the top of piece from where the next vertical piece is placed and so on. You can see how a crane is constructed in the website I've cited below:
Q: I don't like the cranes that use a wired pulley systems for controlling the camera.The crane will need to carry a 7 pound camcorder.
Camera okorder /
Q: Why does the correspondant keep repeating If i am going to be drowned? IF I am going to be drowned -- if I am going to be drowned -- if I am goi
Knowledge the dynamics of any social situation and to be able to bend and manipulate the problem for your own conclusion use is a thing that you dream on the you may be in total get a grip on of any situation using Black Ops Hypnosis
Q: I had a dream and it wos really scary so realistic i woke up crying and could go to work the next dayi was in my house and woke up and came downstairs and there were letters on the floor and someone was picking them up then i looked outside and there wos a big fire and a crane had fallen down and explosion and everyone was dying their faces burnt i burst out crying. what does it mean?
Probably some stress or fear is looming large in your subconscious mind. Scary dreams often occur when you have something that is stressing you. That is assuming you didn't read some book or watch some movie that brought it on, that is another possibility. Often we replay images we have in our heads from the day before. I don't think it is an omen or anything. So, be glad to say it was only a dream.
Q: I have a question about cranes...does anyone know what the maiximim weight is that they can lift. A friend and I were discussing this and i was just wanting to know if anyone might have the answer. Thanks guys
Do not know where you live but I worked in a Shipyard in South Mississippi That had Cranes which picked up Modules which weighed 100 tons. Most were in the range of 50 to 70 tons the limiting factor was the range of the lift away from the crane. The further away from the Crane the less the load limit but the Cranes were rail mounted so they could traverse and carry the load anywhere. We had one Crane capable of handling 500 tons, a real monster. These are all located at Pascagoula Mississippi. Most were imported from Germany.
Q: I just seen pics of a crane fly and not sure if I see crane flies in my house or mosquitos now. And do crane flies bite?
Really easy: A crane fly has no long piercing mouthpart: they feed mainly on nectar Female mosquitos have long piercing mouthparts, males are smaller and have shorter mouthparts for sucking nectar from flowers. Common crane flies are almost always bigger than a mosquitos.
Q: Can paper crane symbolise your love for a girl?
sit back look at your question then answer it yourself
Q: mobile tower etc (uk)
Tower cranes and Gantry Cranes Since toer cranes are the most used in the construction industry gantry Cranes are used in all Ports for loading and unloading containers has a vast scope of work
Q: A crew built this huge crane to build an office building next to my house.... There is a huge flag hanging from the top of it.... Why does the construction company do this???
Wind becomes an issue when lifting large loads with a crane that has a long boom. On some large cranes you may see an anemometer near the end of the crane's boom. The crane operator will usually not make certain heavy lifts if the wind speed is too high. If the crane does not have an anemometer, they may be using a flag to tell them the direction of the wind and to give them a rough estimate of wind's speed.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords