• Construction Steel Working Platform Kwikstage Scaffolding System CNBM System 1
  • Construction Steel Working Platform Kwikstage Scaffolding System CNBM System 2
  • Construction Steel Working Platform Kwikstage Scaffolding System CNBM System 3
Construction Steel Working Platform Kwikstage Scaffolding System CNBM

Construction Steel Working Platform Kwikstage Scaffolding System CNBM

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m.t.
Supply Capability:
30000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

  • Quick Details of Construction Steel Working Platform Kwikstage Scaffolding System

  • Type:Fixed

  • Material:Steel

  • Construction Properties:Building Scaffold

  • Lapping Form:Full Scaffolding

  • Framework:Combined Scaffolding

  • Supporting Mode:Floor Type Scaffolding

  • Erection Position:External Scaffolding

  • Scaffolding Part Type:Scaffolding Frames

  • Move Method:Attached Lifting Scaffolding

  • Structural Style:Multi-Pole Scaffolding

  • Place of Origin:China (Mainland)

  • Surface:Painted or Hot Dipped Galvanized

  • Material.:Steel Q235 Q345

    Thickness:4mm;3.2mm;3mm

  • Construction Steel Working Platform Kwikstage Scaffolding System CNBM

  • Construction Steel Working Platform Kwikstage Scaffolding System CNBM


  • Construction Steel Working Platform Kwikstage Scaffolding System CNBM

  • Descriptions of  Construction Steel Working Platform Kwikstage Scaffolding System

Kwikstage Scaffolding is a multi-purpose modular scaffold system which can be used for all forms of access and support structures in the building and construction industries, ship buliding, offshore construction and industrial maintennace.
Details of Metal kwikstage Scaffolding
1. Metal kwikstage scaffolding system is a new type of selflock scaffolding which is very popular in Oceanian,African construction.
2. Metal kwikstage scaffolding System is suitable for both inside concrete slab supporting and outside masonry Construction multi-purpose for construction.
3. Metal kwikstage scaffolding systemstandard is weld with a plate every 600mm which can join ledgers at 90 degree.
4. Metal kwikstage scaffolding system ledger is a horizontal member with a blade at each end for insertion into the standard plate.
5. kwikstage scaffolding system is quick to erect and strip which has completely replaced other scaffolding.



  • The Accessories of Construction Steel Working Platform Kwikstage Scaffolding System


  • The main items of Kwikstage scaffolding system

     ITEMSSPECIFICATIONWEIGHT
    STANDARD
    (VERTICAL)
    48.3*4.0*3000/2500/2000/1500/1000mm
    painted/hot dip galvanized/ect.
    steel pipe
    16.94/14.34/11.53/8.86/6.13kg
    LEDGER
    (HORIZONTAL)
    48.3*3.2*2400/1800/1200/700mm
    painted/hot dip galvanized/etc.
    steel pipe
     9.1/6.85/5.13/3.24kg
    TRANSOM2400/1800/1200/700mm
    painted/hot dip galvanized/etc.
     19.92/12.08/10.79/7.79kg
    BRACE2400*2000mm/2500/3000mm
    pained/hot dip galvanized/etc.
     9.38/10.35/11.41kg
    HOPUP BRACKETone board/two board/three board
    painted/hot dip galvanized/etc.
     1.84/4.99/8.58kg
  • The other items of Kwikstage scaffolding system

  • TIE BAR2400/1800/1200/700mm
    painted/hot dip galvanized/etc.
     5.41/4.15/2.77/1.72kg
    STEEL BOARD2400/1800/1200/700mm
     painted/hot dip galvanized/etc.
     14.5/10.93/7.68/4.94kg
    END TOE BOARD BRACKET as normal specification or as customers' drawing
    painted/hot dip galvanized/etc.
     1.12kg
    TOE BOARD BRACKET as normal specification or as customers' drawing
    painted/hot dip galvanized/etc.
     0.72kg
    BASE JACK and U HEAD 38*4.0*650mm/u head
    painted/hot dip galvanized/etc.
     3.69/4.63kg

  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Q: Said chrysanthemum disc scaffolding system, disc scaffolding system, wheel type scaffolding system, buckle scaffold, layher frame
Crossbar HG-30 3001.67HG-60 6002.82HG-90 9003.97HG-120 12005.12HG-150 15006.28
Q: Do the external wall decoration (from the top down to do) scaffolding is to wait until after the completion of the indoor and outdoor decoration before the demolition?If the first interior decoration, can make a layer of a layer of it is to remove all the work finished I mean I finished all the interior decoration, wall decoration only, then I do a wall decoration on the demolition of a layer of scaffolding, this site useful no
The relevant provisions of the demolition of the external wall scaffold:First, the removal of scaffolding before the accurate preparation work should meet the following requirements:1, should be a comprehensive inspection of the scaffold fastener connection, even wall pieces, support system, etc. are in line with the requirements of the structure;2, should be based on the results of the inspection to improve the construction organization design of the demolition order and measures, approved by the competent authorities before the implementation;3, should remove the scaffolding on the debris and ground obstacles.
Q: there is also shrubs and trees planted on the base of the wall and 14 feet from it
A little late to be asking that question if you already have the contract, isn't it?
Q: What does my earth science teacher mean when he says to do a powerpoint with Link Scaffolding,how d u do it?
Link Scaffolding = A search found no answer. - Ask teacher to clarify.
Q: Scaffold Piercing Aftercare?Ok, so I was looking into getting an industrial piercing. However, I am very very serious about the aftercare, and I would dread any infection or anything going wrong. So, I was wondering, what are some aftercare cleaning tecniques/methods? I already know that antibacterial soap is good, as is the H20 cleaning spray stuff. And that you are supposed to clean it twice a day. But how and when should I do this? I have school which I can clean it before I go in the morning, but I don't get back until four, and then I take a shower at night always. I know it sounds silly, but are there some tips you have? Thanks!
i love my scaffold/business piercing i do not imagine it hurts yet some human beings say it does Coast round ?25/30 - any more desirable than its a rip off. this is a soreness to heal and takes a lengthy time period! each and every time I knocked mine it swelled and went humorous. extremely stressful. Had it executed 3 cases, 1st time it grew out, second time I only took it out. third time I were given it pierced on my different ear and at the same time as it became healed I replaced it to a versatile bar and for the reason that then this is been suitable. desire I helped.
Q: Okay so I want to get either done, I just want to know which one is more painful. Not felling that nervous because I have had my nose and tongue done. I want to know which one is more painful and how to clean each of them. And also with the lip, is it more like the tongue with what foods you can eat and how hard it is to eat?
The lip is an interesting piercing. The person doing your piercing will clamp you lip, causing a mild discomfort to distract you and guide the needle and ring in, takes less than a minute. Virtually painless, unless your pain threshold is sensitive. Also, if you get a monroe (left upper lip) or madonna (right upper lip), it would vary from a medusa (center middle lip) because that us where the skin is the thickest. Lower lips piercings are about the same. You start of with a longer laret ring for two weeks to compensate for swelling than get a normal one. It is going inside your mouth so be careful how you chew. m Clean the inside of your mouth after every time you eat with a non alcohol mouth rinse or saltwater rinse. As for the outside take some warm water and non iodized salt and gently twist the labret while using a q tip to gently clean around it.
Q: what do you think?pain wise? i know it's going to hurt as it's a peircing (duh) but will it hurt especially as it's two thick pieces of cartilage?
sounds hott!! XD take alot of advile or novacain before you get it done, trust me it works!
Q: Okay, quick question. I dropped into a couple of piercing studios yesterday to inquire about getting a scaffold done. Both places informed me that it's not a good idea to have it pierced with a bar straight off, as the pressure from the jewellery combined with the swelling when first pierced can seriously slow down the healing rate. Is this true? The second place said they will pierce both holes with rings, and these can be changed to a bar after around 6 to 8 weeks.Is this the best option? Thanks for any replies.
That is true, but it's an even worse idea to have an industrial done with rings. This is because your body can move your piercings slightly, to accommodate the angle that works best for your body. In general, that's not a bad thing, but with industrials, it's a problem. You may find that an industrial healed with rings may not accommodate a bar well; the piercing may heal unaligned, and wearing a bar could be painful or impossible. Plus any shop that thinks changing from rings to a bar at 6 to 8 weeks will make any difference from getting a bar initially, you shouldn't trust to poke needles in you. Industrials take 6 months to a year or more to heal. At 8 weeks, the piercings are still very much healing. So if you have your jewelry switched at that point, you'll be irritating the piercing, setting back healing, and you'll have to deal with all of the pressure and hypertrophic scarring problems anyway. It basically comes down to this, industrials suck to heal. Bars are hard to heal. But rings will often result in bad industrial placement and alignment. Just get pierced with a bar and deal with the problems as they come. It's still very much possible to heal an industrial, it just takes time, patience, and a really good piercer (and like I said find a better shop, whoever told you it'd work to change the jewelry from rings to a bar at 8 weeks is an idiot).
Q: Im a wimp for pain and im looking to get my scaffolding done. i want to know how painful it isI already have both lobs pierced and stretched to an 8mm, will the pain be similar to that?
You sound like you have a low tolerance for pain if you say you're a wimp haha, which means yeah it'll probably hurt you. It'll hurt more than the lobes because it's cartilage, and for the same reason you'll hear a popping noise as the hole is made. You won't be taken over by deathly pain or anything like that, it'll probably be sensitive for a few days after too so careful not to knock it against anyone/ anything. But if you want it bad enough, the pain will be bearable.
Q: Specification and type of scaffold erection
Specification for scaffold erection(a) basic requirements1 important scaffolding must develop a construction plan, if necessary, to develop safety assurance measures. 2 more than 25m high scaffolding must adopt the fastener type steel tube scaffold, the single pole scaffolding height should be controlled within 50m; height of more than 50m of the scaffolding should be effective measures by a double pole, wire rope, cable stayed unloading segment, and additional design.3 the design of the scaffold shall meet the requirements of the project and shall indicate its use, maximum static load, maximum dynamic load andThe selected design parameters and structural parts shall not be lower than the existing national and industry related safety technical standards.4 scaffolding in the construction of the need to change the original structure, Gago (wide), to its use, etc., must be verified by the technical department, and the approval.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords