• Construction Steel Working Platform Kwikstage Scaffolding System CNBM System 1
  • Construction Steel Working Platform Kwikstage Scaffolding System CNBM System 2
  • Construction Steel Working Platform Kwikstage Scaffolding System CNBM System 3
Construction Steel Working Platform Kwikstage Scaffolding System CNBM

Construction Steel Working Platform Kwikstage Scaffolding System CNBM

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m.t.
Supply Capability:
30000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

  • Quick Details of Construction Steel Working Platform Kwikstage Scaffolding System

  • Type:Fixed

  • Material:Steel

  • Construction Properties:Building Scaffold

  • Lapping Form:Full Scaffolding

  • Framework:Combined Scaffolding

  • Supporting Mode:Floor Type Scaffolding

  • Erection Position:External Scaffolding

  • Scaffolding Part Type:Scaffolding Frames

  • Move Method:Attached Lifting Scaffolding

  • Structural Style:Multi-Pole Scaffolding

  • Place of Origin:China (Mainland)

  • Surface:Painted or Hot Dipped Galvanized

  • Material.:Steel Q235 Q345

    Thickness:4mm;3.2mm;3mm

  • Construction Steel Working Platform Kwikstage Scaffolding System CNBM

  • Construction Steel Working Platform Kwikstage Scaffolding System CNBM


  • Construction Steel Working Platform Kwikstage Scaffolding System CNBM

  • Descriptions of  Construction Steel Working Platform Kwikstage Scaffolding System

Kwikstage Scaffolding is a multi-purpose modular scaffold system which can be used for all forms of access and support structures in the building and construction industries, ship buliding, offshore construction and industrial maintennace.
Details of Metal kwikstage Scaffolding
1. Metal kwikstage scaffolding system is a new type of selflock scaffolding which is very popular in Oceanian,African construction.
2. Metal kwikstage scaffolding System is suitable for both inside concrete slab supporting and outside masonry Construction multi-purpose for construction.
3. Metal kwikstage scaffolding systemstandard is weld with a plate every 600mm which can join ledgers at 90 degree.
4. Metal kwikstage scaffolding system ledger is a horizontal member with a blade at each end for insertion into the standard plate.
5. kwikstage scaffolding system is quick to erect and strip which has completely replaced other scaffolding.



  • The Accessories of Construction Steel Working Platform Kwikstage Scaffolding System


  • The main items of Kwikstage scaffolding system

     ITEMSSPECIFICATIONWEIGHT
    STANDARD
    (VERTICAL)
    48.3*4.0*3000/2500/2000/1500/1000mm
    painted/hot dip galvanized/ect.
    steel pipe
    16.94/14.34/11.53/8.86/6.13kg
    LEDGER
    (HORIZONTAL)
    48.3*3.2*2400/1800/1200/700mm
    painted/hot dip galvanized/etc.
    steel pipe
     9.1/6.85/5.13/3.24kg
    TRANSOM2400/1800/1200/700mm
    painted/hot dip galvanized/etc.
     19.92/12.08/10.79/7.79kg
    BRACE2400*2000mm/2500/3000mm
    pained/hot dip galvanized/etc.
     9.38/10.35/11.41kg
    HOPUP BRACKETone board/two board/three board
    painted/hot dip galvanized/etc.
     1.84/4.99/8.58kg
  • The other items of Kwikstage scaffolding system

  • TIE BAR2400/1800/1200/700mm
    painted/hot dip galvanized/etc.
     5.41/4.15/2.77/1.72kg
    STEEL BOARD2400/1800/1200/700mm
     painted/hot dip galvanized/etc.
     14.5/10.93/7.68/4.94kg
    END TOE BOARD BRACKET as normal specification or as customers' drawing
    painted/hot dip galvanized/etc.
     1.12kg
    TOE BOARD BRACKET as normal specification or as customers' drawing
    painted/hot dip galvanized/etc.
     0.72kg
    BASE JACK and U HEAD 38*4.0*650mm/u head
    painted/hot dip galvanized/etc.
     3.69/4.63kg

  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Q: In the construction of steel pipe scaffolding steel pipe and steel stamping fastener usage ratio is how much?
Generally 200 tons of steel pipe with fasteners, and fasteners are generally divided into three kinds: right angle fasteners, connecting fasteners, rotating fasteners
Q: What's an antonym for the word scaffold?
I don't think there is one. 'Scaffold' is a noun but, with the exception of gender nouns (egs boy/girl; man/woman) it's verbs, adjectives, adverbs and prepositions that can have true opposites.
Q: How to calculate the rental price of portal scaffolding
Under normal circumstances, the small local rental price: 2.5-3.0 yuan / set / day
Q: hi guys i got my scaffold piercing a couple of days ago and it keeps bleeding on and off and there was dry blood but i removed it and its bleeding more what could i do step by step to keep total care of my piercing to get rid of all these problem please help it will really be appreciated
leave the dry blood let it heal be patient
Q: Write a scaffold method for 743,425 divided by 365EASY 10 points
use a calculator you punk, nobody writes out division anymore, grab your ti-84 and type it out... there's your scaffold method jerk.
Q: What are the requirements for the sampling inspection of scaffolding?
1 the sampling proportion of various structural parts shall not be less than 5% and not less than 20 pieces, and the quality shall comply with the relevant standards and regulations. Not meet the quality requirements of the structural parts shall not be used.2 wall thickness of steel pipe should be in line with the provisions of the special construction program, and shall not be less than 2.8mm, the wall thickness of less than 2.8mm of the steel pipe shall not be used;3 is strictly prohibited the use of cracks, deformation of the fastener, the bolt appears to be replaced silk;4 foot hand frame accessories must be used before the anti-corrosion treatment.
Q: For the current stage of China's construction should not strengthen the specific meaning of scaffolding and support by way of the scaffolding and support the specific distinction and significance
The scaffold is outside the frame, it is characterized by relatively large height, shape, wind load and gravity load is; while the template bracket shape because the concrete component varies, the total height, gravity load, improper placement to lose stability, no need to calculate the wind load, etc..
Q: Construction scaffolding right angle fastener, rotary fastener, butt fastener weight? There are more than one meter steel pipe?Thank you!!!
High efficiency of the installation and removal of only bare handed, greatly improve the efficiency of mobile scaffolding assembly and disassembly than the steel pipe frame 1/2 fast time, faster than bamboo scaffolding 2/3 time. Safe and reliable 1 overall performance is good: equipped with a foot board, parallel frame, buckle wall tube, horizontal and cross bar...
Q: He pushes a can over the scaffold at 15 meters and it takes 3.25 seconds for it to land.I keep doing the problem over and over. the Correct answer is 20.5 m/s, however I keep arriving to the solution of 17 m/s. I solved it by doing Vf^2 = Vi^2 + 2adwhere the initial velocity is zero and the acceleration is -g. I made my coordinate system so that down is negative in which the distance will be negative. This however, did not give me the correct answer. Am I right or is the book right?
The initial velocity is not zero since the scaffold is moving upward when the can gets pushed over. And final velocity, vf, does not represent the speed of the scaffold (if that is what you're trying to solve). y = (vo)(t) - (1/2)gt? 15 m = (vo)(3.25 s) - (1/2)(9.81 m/s?)(3.25 s)? vo = +20.5 m/s
Q: Why is it necessary to keep records of all inspection carried out on scaffolds as stated in Regulation 39?
some times ppl die because of neglect and lack of mentainance so some have take responsobility for this

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords