• Construction Hoist SCD320 Counterweight Elevator System 1
  • Construction Hoist SCD320 Counterweight Elevator System 2
  • Construction Hoist SCD320 Counterweight Elevator System 3
  • Construction Hoist SCD320 Counterweight Elevator System 4
  • Construction Hoist SCD320 Counterweight Elevator System 5
Construction Hoist SCD320 Counterweight Elevator

Construction Hoist SCD320 Counterweight Elevator

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Structure of Construction Hoist Description


1.Feature: Construction Hoist                        

2.Payload(kg):3200                                          

3.Lifting Speed(m/min):33                             

4.Motor Power(kw): 2*15

5.Safety Device: SAJ50-1.2                              

6.Cage: Single                                              

7.Counterweight: Yes

8.Certification: CE,ISO                                      

9.Place of Origin: China(Mainland)              

10.Model Number: Type:SCD320

 

Packaging & Delivery of Construction Hoist 


Packaging Detail: Nude package          Delivery Detail: 25-30days

 

Main Parts of Construction Hoist


● The gearing adopts imported bearing, enameled cable, and oil seal.


● The electric parts adopt products from world renowned manufactures such as Schneider, Siemens, and LG.


● The racks and pinion adopts special material and heat-treatment technique, which prolong the life of these parts.


● The steel structure uses quality steel from famous domestic manufactures.


● The surface of the structure can apply paint-spray, parkerozing baking finish or hot galvanizing processing according

    to users requirements,


● The cage can be produced and decorated by aluminum molded board, punched-plate or figured aluminm board.


Construction Hoist Specifiction


Single cage High speed  

Model

Speed(m/min)

Deadweight(kg)

Motor(KW)

Counterweight

Specification(L×W×H)(m)

SC100G

96

1000

3×22

No

2.5×1.3×2.5

SC120G

96

1200

3×22

NO

3.0×1.3×2.5

SCD200G

96

2000

3×15

Have

3.2×1.5×2.5

SC200G

96

2250

3×22

No

3.2×1.5×2.5

SC270GS

96

2700

3×22

No

3.8×1.5×2.5

SCD270G

96

2700

3×18.5

Have

3.8×1.5×2.5

SCD300G

96

3000

3×22

Have

4.0×1.5×2.5

SCD320GS

96

3200

3×22

Have

4.2×1.5×2.5

 Single cage Medium speed 

SC100GZ

63

1000

3×15

No

2.5×1.3×2.5

SC120GZ

63

1200

3×15

No

3.0×1.3×2.5

SCD200GZ

63

2000

2×15

Have

3.0×1.3×2.5

SC200GZ

63

2000

3×18.5

No

3.0×1.3×2.5

SC225GZ

63

2250

2×18.5

No

3.2×1.5×2.5

SC225GZ

63

2250

3×18.5

Have

3.6×1.5×2.5

SCD250GZ

63

2500

2×18.5

Have

3.6×1.5×2.5

SC250GZ

63

2500

3×18.5

Have

3.8×1.5×2.5

SCD270GZ

63

2700

2×18.5

Have

3.8×1.5×2.5

SC270GZ

63

2700

3×22

NO

4.0×1.5×2.5

SCD300GZ

63

3000

3×15

Have

4.0×1.5×2.5

SCD320GZ

63

3200

3×15

Have

4.2×1.5×2.5

 Single cage standard speed 

SC100TD

36

1000

2×11

NO

2.5×1.3×2.5

SC120TD

36

1200

2×11

NO

3.0×1.3×2.5

SC200TD

36

2000

3×11

NO

3.0×1.3×2.5

SCD200TD

36

2000

2×11

Have

3.2×1.5×2.5

SC270TD

36

2700

3×15

NO

3.6×1.5×2.5

SCD270TD

36

2700

2×11

Have

3.8×1.5×2.5

SC320TD

36

3200

3×18.5

NO

4.0×1.5×2.5

SCD320TD

36

3200

2×11

Have

4.2×1.5×2.5

 

Construction Hoist SCD320 Counterweight Elevator

Construction Hoist SCD320 Counterweight Elevator

Construction Hoist SCD320 Counterweight Elevator

Construction Hoist SCD320 Counterweight Elevator

Construction Hoist SCD320 Counterweight Elevator


FAQ of Construction Hoist


Q: What is the building hoist main purpose? 

A: Building hoist equipped with double or single cabin to transport the materials and labors up and down. It's the ideal 

construction equipment for vertical transportation in the field of construction.  


Q: What is the main structure of building hoist? 

A: The P/M construction hoist mainly contains metal structure, driving system, electrical control system, cable guide & 

protection system, electrical top crane and safety device.  

  

Q: What is the meaning of the building hoist’s code?

 A: Take SC200/200 for example: “SC” stands for rack and pinion hoist, “200/200” stands for double cage and capacity 

is 2 tons per cage. “SC200” stands for single cage and capacity is 2 tons. 

 

Q: What is the dimension of the cage? 

A: Normally the cage dimension is 3X1.5X2.5M (L/W/H) for 2t type hoist. Details should be checked according to our 

quotation sheet. Also, the size can be customized according to the factual site condition.  There are two doors (entrance

 & exit doors) for each cage, It can be produced as up & down sliding or ramping model for safety and convenience.  

Q:The staff on the construction platform shall not exceed the number of people
Depending on the actual situation, different quality of platform specifications will affect the number of people manned. Hope can help you.
Q:Is the construction elevator a special equipment
The construction elevator is special equipment, the installation and demolition of the special construction plan, after the installation, the special equipment can be tested and qualified for use
Q:There are differences between the construction elevator and the construction elevator
When it comes to the construction elevator, people will immediately think of construction lifter, the construction elevator and elevator is just a different name or have their own respective working principle? By below small make up to you to introduce: construction elevator is often referred to as construction lifter, but construction lifter, including the definition of a broader platform construction also belongs to the construction lifter series.
Q:Should a fire extinguisher be equipped in the construction elevator?
A fire extinguisher will be required for the 500kg of manned cargo construction elevators at 500kg or more.
Q:How do construction suspension scaffolding be handled in the people's elevator?
Suspension of steel and steel is used to avoid the elevator, and it is OK to encrypt it on both sides of the elevator
Q:Is the elevator detail a construction plan? Do you have a detailed picture of the elevator?
You're talking about the elevator or the elevator shaft, the elevator is the equipment, the elevator manufacturer has the working paper. As for the elevator well according to the data of zxtech figure design, general construction diagram and structure diagram, industry make a steel cylinder or cone steel structure party sometimes out construction diagram, according to the structure of the construction
Q:Why do you ask the construction elevator to be a certain distance from the structure? Is very close to if not you can not bother to do delivery channel security protection or something, out of the elevator out directly, and attachment should be able to get more easily, to solve. Thank you very much!!
The distance between the moving parts and the building and the fixed construction equipment shall not be less than 0.25 m. The main thing is to prevent the person from the point of view. For example, workers are on the third floor to look down, hanging cage, where is the result now hanging basket is go down from the fourth floor, if not the 25 cm, likely to brush "cut".
Q:The construction elevator should have those procedures
Construction elevator installation unit must have issued by the construction administration department of lifting equipment installation project specialized contracting qualification and construction enterprise safety production license, and within the scope of the qualification licensing business engaged in the installation of construction lifter removed.
Q:Is there a specification requirement for the floor door of the elevator to the floor? How high
The door locks must be in the direction of the elevator, and the people on the floor are not allowed to move at will, only the driver will be able to move. The other is that the height of the door must be 1.8 meters high, so that the workers' heads don't reach out to the danger.
Q:What's going on with the decline in construction lift
Check to see if there is any problem with holding the brake. There is no problem with the contactless contactor, which is the most common cause of the vehicle. Normal contactor will rebound at the moment of you to stop operation, adhesion would be stuck there for a few seconds and then bounce back, in a few seconds the brake coil is charged, the brake is still in open state, but the motor has stopped working, so will decline, it's adhesion change the same contactor change.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords