Connecting Flexible Duct - Pre-Insulated Aluminum Duct CNBM in China
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m
- Supply Capability:
- 50000000 m/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Place of Origin: | Zhejiang China (Mainland) | Brand Name: | Hushi lida | Type: | Ventilation |
Packaging & Delivery
Packaging Detail: | one piece one carton |
Delivery Detail: | 10-20days |
Specifications
non-insulated aluminum flexible duct
extension rate:1:10
Low /medium pressure central HVAC system
flame and heat resistant
Aluminum ventilation hose aluminum foil air duct expandable aluminium ducting
Material:
Double layers of aluminum foil reinforced with high tensile spring steel wire
Structure: High elastic wire, aluminum foil. A reinforcement model can be required.
Aluminum foil thickness: 0.035mm
Temperature range: -30°C~+140°C
Maxim Air Flow: 30m/s
Maxim working pressure: 2500 pa
Standard Length: 10m/pc Or as your requirement
Fire resistance: Non flammable.
Normal packing: In carton. Or as your requirment
Application: Low /medium pressure central HVAC system and ventilation system.
Application: Used in gigh pressure,low pressure air conditioner and ventilation system,easy installation, anti-temperature and inflaming retarding etc
Spec. | O.D.(mm) | I.D.(mm) | Length(M/PC) | |
2" | 54 | 50 | 10 | |
2-1/2" | 68 | 64 | 10 | |
3" | 80 | 76 | 10 | |
4" | 106 | 102 | 10 | |
5" | 131 | 127 | 10 | |
6" | 156 | 152 | 10 | |
7" | 166 | 162 | 10 | |
8" | 204 | 200 | 10 | |
10" | 258 | 254 | 10 | |
12” | 310 | 305 | 10 | |
12 1/2“ | 320 | 315 | 10 | |
14" | 362 | 356 | 10 | |
16" | 412 | 406 | 10 | |
18" | 463 | 457 | 10 | |
20" | 514 | 508 | 10 | |
22" | 565 | 559 | 10 | |
24" | 616 | 610 | 10 |
- Q: What is the effect of concrete pouring on the construction quality?
- , why should set the flexible pipe, because all the materials are hot and cold shrink, you layout the pipeline When the temperature and your future use when there is a difference in the temperature and the thermal stress when processing, if not Ji plant perfection Dao Ghost voucher set the flexible pipeline, the pipeline will have a lot of internal stress, long-term alternating role will Resulting in pipeline damage, set a lot of places, such as straight pipe, to a certain length must be set, the inflection point also need to set, these settings you can be in the mechanical design manual pipe chapter check out
- Q: What is the difference between a flexible pipe and a rigid pipe? What types of pipes are used for drainage pipes, heat pipes and gas pipelines?
- However, these three tubes have good seismic performance, strong sealing, construction is simple, easy maintenance, the use of reliable and so on, it is also known as the cast iron pipe Which W-type cast iron pipe is subdivided into W-type cast iron pipe and W1-type cast iron pipe, the main difference between the two is the difference between the wall thickness, because the difference between the north and south temperatures, the northern cold weather on the pipe requirements higher , So in general W-type cast iron pipe is mainly used for the north, and W1-type cast iron pipe is mainly used for the South side
- Q: Will the embedded stove why use stainless steel corrugated hose connection?
- Do not open the window, enjoy the fresh air 24 hours a day, to ensure adequate ventilation (hourly indoor air replacement 0
- Q: Can the kitchen sewage pipe pass through the walls of the stove wall?
- scaffolding pole base with the height must be high longitudinal bar to the lower extension of the two spans and pole fixed height difference should be 1m by slope slope of the vertical axis of the slope should be 500mm single, double Row scaffolding bottom step should be 2m single row, double row and full of scaffolding stand in addition to the top of the top step outside the other layers of each step must be connected with the fastener scaffolding pole connection, lap should be consistent with the column Provisions: the use of connecting rods should be staggered with two adjacent rods should be arranged to set the synchronization within the synchronization within the separation of the two-phase separation of the distance from the distance to 500 mm; each connected to the main node the use of lap joint lap joint should be at 1m and should be used less than 2 rotating fasteners fixed end fastener cover edge to the rod end distance should be 100mm scaffolding Pole top rail bar should be high wall end 1m should eaves mouth 15m
- Q: Why should the flexible hose be set in the mechanical ventilation system?
- Bowl buckle price is high! There are many buckle-style markets, so rent up cheap!
- Q: Find a joint electronic M1.5.4 type ECU application system wiring harness and layout Thank you, anxious! The
- Not even if you are cheap to say that you are angry, and a ticket stare on the
- Q: Is the clamp type flexible connector connected to the pipe to the rubber pad?
- 1. Civilized construction program 2. Safe construction program 3. Template construction program 4. Scaffolding construction program 5. Sambo four construction program 6. Temporary electricity construction program 7. High operating construction program 8. Tower crane construction plan 9. Multi-tower operation anti-collision construction program 10. Emergency emergency plans 11. Winter rainy season construction program 12. Significant hazard assessment measures 13. Construction organization design 14. Building energy conservation program 15. Basket construction program 16. Tower crane hoisting program
- Q: Is the flexible sleeve of the broken wall used as a second retest?
- There is a staircase in the middle of the tower crane, from the stairs began to climb
- Q: Where there are wear-resistant tube, high temperature ceramic tube
- The fraction of 200 ℃ in the condensed product was analyzed by GC-MS, and the degradation phenomena and products were discussed
- Q: Rigid pipes differ from flexible piping, those are rigid pipes that are flexible piping
- First of all, the main structure of the construction to be reserved when the knot point, and then with the foot of the lack of rush to maintain the use of steel pipe, the so-called hard link. Combined with the external wall fastener type steel scaffolding specifications
Send your message to us
Connecting Flexible Duct - Pre-Insulated Aluminum Duct CNBM in China
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m
- Supply Capability:
- 50000000 m/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords