Flexible Duct Insulation - 4"-12" Expandable Aluminum Ducts by CNBM China
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m
- Supply Capability:
- 50000000 m/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Place of Origin: | Zhejiang China (Mainland) | Brand Name: | Hushi lida | Type: | Ventilation |
Packaging & Delivery
Packaging Detail: | one piece one carton |
Delivery Detail: | 10-20days |
Specifications
non-insulated aluminum flexible duct
extension rate:1:10
Low /medium pressure central HVAC system
flame and heat resistant
Aluminum ventilation hose aluminum foil air duct expandable aluminium ducting
Material:
Double layers of aluminum foil reinforced with high tensile spring steel wire
Structure: High elastic wire, aluminum foil. A reinforcement model can be required.
Aluminum foil thickness: 0.035mm
Temperature range: -30°C~+140°C
Maxim Air Flow: 30m/s
Maxim working pressure: 2500 pa
Standard Length: 10m/pc Or as your requirement
Fire resistance: Non flammable.
Normal packing: In carton. Or as your requirment
Application: Low /medium pressure central HVAC system and ventilation system.
Application: Used in gigh pressure,low pressure air conditioner and ventilation system,easy installation, anti-temperature and inflaming retarding etc
Spec. | O.D.(mm) | I.D.(mm) | Length(M/PC) | |
2" | 54 | 50 | 10 | |
2-1/2" | 68 | 64 | 10 | |
3" | 80 | 76 | 10 | |
4" | 106 | 102 | 10 | |
5" | 131 | 127 | 10 | |
6" | 156 | 152 | 10 | |
7" | 166 | 162 | 10 | |
8" | 204 | 200 | 10 | |
10" | 258 | 254 | 10 | |
12” | 310 | 305 | 10 | |
12 1/2“ | 320 | 315 | 10 | |
14" | 362 | 356 | 10 | |
16" | 412 | 406 | 10 | |
18" | 463 | 457 | 10 | |
20" | 514 | 508 | 10 | |
22" | 565 | 559 | 10 | |
24" | 616 | 610 | 10 |
- Q: For example, HDPE pipe with a flexible connection is a flexible interface, PVC-U of the glue plug-in method, is just helium pouring a lie on the pizza pull the interface, wire then, flange it more
- According to the provisions of Article 103 of the "Tower Crane Safety Regulations", the tail of the tower crane is not less than 0
- Q: Drain flexible pipe to keep the base design above the elevation of the number of meters
- , there are cloth-based materials, such as Teflon cloth, etc
- Q: Flexible pipe trench backfill inspection batch quality acceptance record how to fill
- Home appliances to the countryside sales business first of all should go to the local Bureau of Commerce for the record, after authorization, the monthly sales of home appliances to the countryside information information log system, and the corresponding sales invoices, product identification card, the buyer ID document copy Reported to the local financial institutions (usually the local financial office), and then the financial management of your sales information to review, grant subsidies
- Q: Can the kitchen sewage pipe pass through the walls of the stove wall?
- scaffolding pole base with the height must be high longitudinal bar to the lower extension of the two spans and pole fixed height difference should be 1m by slope slope of the vertical axis of the slope should be 500mm single, double Row scaffolding bottom step should be 2m single row, double row and full of scaffolding stand in addition to the top of the top step outside the other layers of each step must be connected with the fastener scaffolding pole connection, lap should be consistent with the column Provisions: the use of connecting rods should be staggered with two adjacent rods should be arranged to set the synchronization within the synchronization within the separation of the two-phase separation of the distance from the distance to 500 mm; each connected to the main node the use of lap joint lap joint should be at 1m and should be used less than 2 rotating fasteners fixed end fastener cover edge to the rod end distance should be 100mm scaffolding Pole top rail bar should be high wall end 1m should eaves mouth 15m
- Q: The sound of water pipes will not produce infrasound damage to the human body?
- Most of the polyethylene benzene board insulation, paste the external walls.
- Q: Talk about the class flexible management of the class teacher what the requirements
- National Standard B Administrative Regulation C Industry Code D Normative document Local regulations which of the following are safety technical standards? (ACDE) A Code for safety of construction work JGJ80-91B Construction Engineering Supervision Standard Safety code for construction machinery use JGJ33-2001D Standard for Safety Inspection of Building Construction JGJ59-2011E Tower crane safety regulations GB5144- from the 90's onwards, the Ministry of Construction have prepared a number of building safety technology standards, including (ACDE) A Building construction safety inspection standard B Measures for the Administration of Construction Permit for Construction Works Technical Specification for Safety of Fastener Steel Scaffolding for Building Construction Gantry and derrick material hoist safety technical specifications "the State Council on the further strengthening of production safety decision" (Guo Fa [2004] No 2) pointed out: to strive to build (ABCDE) of the safe production work pattern A Government united leadership Department of supervision according to law The enterprise is fully responsible for D Mass participation in supervision The whole society is widely supported according to the Ministry of Construction on the construction enterprises and the safety of production and management of the main responsibilities of the production of the following responsibilities (ABCD) A Implement national laws and regulations on safe production and standard B Prepare and timely update the safety management system Organize the full safety education Organize security checks Organize the preparation of special construction program
- Q: Find a joint electronic M1.5.4 type ECU application system wiring harness and layout Thank you, anxious! The
- Not even if you are cheap to say that you are angry, and a ticket stare on the
- Q: Heating pipe through the deformation of the joints, the album is written on the "metal hose", the problem one: This is a flexible hose? Question 2: how to set the quota
- First, according to its structure can be divided into: scaffolding according to its structure can be divided into: multi-pole, bowl button, door type, square tower, attached lift frame and hanging scaffolding. Second, the knowledge expansion: scaffolding by setting the form can be divided into: single row scaffolding only a row of pole scaffolding, the other side of the horizontal bar on the wall structure. double scaffold scaffolding with two rows of poles. multi-row scaffolding with more than 3 rows of pole scaffolding. full of scaffolding according to the scope of construction work full, both directions have more than 3 rows of pole scaffolding. Full scaffolding The maximum height of the wall or construction work, the scaffolding set by the height of the ground. Scroll (Peripheral) Scaffolding Scaffolding that is set up and intertwined along a building or range of work. Scaffolding Scaffolding with special flat and space shapes, such as for chimneys, water towers, cooling towers and other flat, circular, "outer", polygonal and upper, Form of construction scaffolding.
- Q: Two hundred galvanized pipe should be under the large flexible tube
- We now have to declare the Department of the Ministry of the United States and the United States, the company said that the access point to our own set, so I would like to ask, what is the requirements of this access point? There is no relevant specification to add: is the construction, the outdoor pipe network in the gas access point position more
- Q: What materials are made of flexible pipes? Why should the mechanical ventilation set the flexible tube? Where should I be located?
- It is recommended to use the home of the heart of the card to worry about toughness to fill the joints, and then paste the seam (master understand) if directly in the sandwich panel (plate) on the batch of putty powder or spray painted really easy to drop off the phenomenon of stone, the first primer, it is recommended to use the home of the German brand brackish scraping scraping again There are), to be dry and then approved scraping putty powder spray really stone paint
Send your message to us
Flexible Duct Insulation - 4"-12" Expandable Aluminum Ducts by CNBM China
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m
- Supply Capability:
- 50000000 m/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords