Concrete Pump Trailer Pump Electric Motor HBTS30
- Loading Port:
- Lianyungang
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 50 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Product Description:
It is commonly referred to as a line pump or trailer-mounted concrete pump. This pump requires steel or flexible concrete placinghoses to be manually attached to the outlet of the machine. Those hoses are linked together and lead to wherever the concrete needs to be placed. Line pumps normally pump concrete at lower volumes than boom pumps and are used for smaller volume concrete placing applications such as swimming pools,sidewalks, and single family home concrete slabs and most ground slabs.
Main Product Features:
1. Import generator is optional.
2. The high quality hydraulic valves and oil pump use Germen KAWASAKI products.
3. The valve for change-over from high pressure to lower pressure is designed to be easily controlled, which can adjust the condition of the pump easily in accordance with the requirement of job site. Dismantle the tube is not necessary so that it can avoid the pollution.
Product Specifications:
Parameter/ unit | HBT30 |
Max theory Output(m3/h) | 40 |
Max Pumping Pressure(MPa) | 10 |
Hydraulic system type | Open |
Power mode | Electric Motor |
Speed(r/min) | 1480 |
Power(kw) | 45 |
Valve type | S |
Diameter of oil cylinder(mm) | 180 |
High- lowe pressure switching | Yes |
Hydraulic oil tank capacity(L) | 280 |
Hopper capacity(m3) | 0.4 |
Hopper jeight(mm) | 1260 |
Total mass(kg) | 3100 |
Dimension: L*W*H(mm) | 5400/1860/1900 |
Our Advantages:
1.Training Solutions – we develop our people through high impact training. We increase the connective intelligence potential of individuals and teams through practical, solution-focused programs in areas such as innovation, team collaboration, management development, strategic thinking and decision making.
2. Coaching Solutions - we increase leadership potential with performance coaching. We increase the connective intelligence potential of our managers and key contributors, assessing and developing both their cognitive and emotional intelligence's (capabilities) as the latest research, and practical experience, indicates that both are needed to drive sustained performance.
3. Reward Solutions – We reward our deserving people based on performance (we ensure equitable treatment of employees because appraisals are based on result of performance) by providing the necessary incentives. Its components can be a combination of bonuses, a range of appropriate benefits such as International trips, commissions and Stock option incentive plan for management & senior workers.
FAQ:
Q1: How do we guarantee the quality of our products?
A1: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.
Q2: How soon can we receive the product after purchase?
A2: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon international and government factors, but is typically 30 to 60 workdays.
Q3: If we can produce some Trailer Pump according to customers request?
A3: Yes, we can produce Trailer Pump according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.
Q4: How to make a quick resolution for after service?
A4: OKorder and our manufacture both have overseas branches all-around of world, if necessary, the seller shall dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary facilities & skilled personnel at site for training.
- Q: What is the difference between concrete conveyors and concrete conveyors?
- The parameters of the main pump are used to determine the speed and transport height of the pump. The horizontal distance is determined by the length of the cloth rod. It is suitable for pouring concrete in fixed mode and can ensure the uniformity of concrete and increase the compactness.
- Q: What parts are concrete pump parts?
- The concrete cylinder is connected with the main cylinder piston rod, under the action of the main cylinder hydraulic oil, for reciprocating motion, one cylinder is advanced, the other cylinder is retreated; the concrete cylinder outlet is connected with the hopper, the one end of the distribution valve is connected with the discharge port,
- Q: What is the main composition of concrete pump
- According to the structure is divided into piston type, squeeze type, water pressure diaphragm type.
- Q: What is the difference between fine stone concrete pump and tow pump?
- After the installation of spray accessories, but also do spray pump, for concrete, mortar, refractory materials and landscaping of the jet and throwing. British stone concrete pump.
- Q: Will the role of concrete towing pump, concrete raw materials are sand or sand?
- Production of concrete raw materials are sand, which also cement, admixtures, stones, fly ash and so on.
- Q: What are the brands of concrete pump trucks?
- On the other hand reflected in the performance of the concrete pump in the construction of the proposed Futian Liza pump, Futian Leisha pump using large diameter, long stroke of the cylinder and the smaller suction angle of the perfect combination of technology, the maximum pumping
- Q: Concrete pump truck hydraulic system open and closed the advantages and disadvantages of what
- Usually used in construction machinery walking, rotary, concrete pumping and other equipment.
- Q: Building concrete pump is how to bulk cement (concrete) to the high
- When the hydraulic system pressure oil enters a main cylinder, the piston rod is extended and the other piston rod is retracted by the pressure oil of the sealing circuit connecting the pipe.
- Q: How to deal with pumping concrete pump pipe pipe burst after the burst, the pump can not stop the situation?
- The time required for pouring concrete drains depends on the slump of concrete, the time of plasticizing, the height of pumping, the length of the pipe, the resistance to pumping, the temperature, and so on.
- Q: How much concrete construction is needed for concrete pump construction
- The concrete pump is retrofitted on a truck chassis, which is equipped with a sports and powertrain, a pump and a stirrer, a cloth, and other auxiliary devices on the chassis.
Send your message to us
Concrete Pump Trailer Pump Electric Motor HBTS30
- Loading Port:
- Lianyungang
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 50 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords