Concrete Pump Trailer Pump Diesel Engine HBTS30
- Loading Port:
- Lianyungang
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 50 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Product Description:
It is commonly referred to as a line pump or trailer-mounted concrete pump. This pump requires steel or flexible concrete placinghoses to be manually attached to the outlet of the machine. Those hoses are linked together and lead to wherever the concrete needs to be placed. Line pumps normally pump concrete at lower volumes than boom pumps and are used for smaller volume concrete placing applications such as swimming pools,sidewalks, and single family home concrete slabs and most ground slabs.
Main Product Features:
1. Powerful machine adopts DERTZ diesel engine (made in China).
2. Import generator is optional.
3. The high quality hydraulic valves and oil pump use Germen KAWASAKI products.
4. The valve for change-over from high pressure to lower pressure is designed to be easily controlled, which can adjust the condition of the pump easily in accordance with the requirement of job site. Dismantle the tube is not necessary so that it can avoid the pollution.
Product Specifications:
Parameter/ unit | HBT30 |
Max theory Output(m3/h) | 35 |
Max Pumping Pressure(MPa) | 10 |
Hydraulic system type | Open |
Power mode | Diesel engine |
Speed(r/min) | 1800 |
Power(kw) | 56 |
Valve type | S |
Diameter of oil cylinder(mm) | 180 |
High- lowe pressure switching | Yes |
Hydraulic oil tank capacity(L) | 115 |
Hopper capacity(m3) | 0.4 |
Hopper jeight(mm) | 1260 |
Total mass(kg) | 3100 |
Dimension: L*W*H(mm) | 5400/1860/1900 |
Our Advantages:
1.Training Solutions – we develop our people through high impact training. We increase the connective intelligence potential of individuals and teams through practical, solution-focused programs in areas such as innovation, team collaboration, management development, strategic thinking and decision making.
2. Coaching Solutions - we increase leadership potential with performance coaching. We increase the connective intelligence potential of our managers and key contributors, assessing and developing both their cognitive and emotional intelligence's (capabilities) as the latest research, and practical experience, indicates that both are needed to drive sustained performance.
3. Reward Solutions – We reward our deserving people based on performance (we ensure equitable treatment of employees because appraisals are based on result of performance) by providing the necessary incentives. Its components can be a combination of bonuses, a range of appropriate benefits such as International trips, commissions and Stock option incentive plan for management & senior workers.
FAQ:
Q1: How do we guarantee the quality of our products?
A1: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.
Q2: How soon can we receive the product after purchase?
A2: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon international and government factors, but is typically 30 to 60 workdays.
Q3: If we can produce some Trailer Pump according to customers request?
A3: Yes, we can produce Trailer Pump according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.
Q4: How to make a quick resolution for after service?
A4: OKorder and our manufacture both have overseas branches all-around of world, if necessary, the seller shall dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary facilities & skilled personnel at site for training.
- Q: Winter concrete pump pipe Zeyang insulation Yeah?
- Concrete winter preparation for the day when the minimum temperature below 0 ℃, should take the winter construction measures to prevent the construction of the construction work suffered frost damage
- Q: What is the difference between a concrete pump and a concrete pump
- The parameters of the main pump are used to determine the speed and transport height of the pump. The horizontal distance is determined by the length of the cloth rod. It is suitable for pouring concrete in fixed mode and can ensure the uniformity of concrete and increase the compactness.
- Q: 90KW concrete pump should be used in the number of generators?
- You should use 250KW unit, in order to ensure that your normal operation of the equipment foolproof.
- Q: What is the lubrication of the concrete pump before it is transported to the concrete?
- Concrete pump to transport concrete before the pipeline lubrication
- Q: What is the cause of concrete pump blockage?
- Take over, should first remove the air inside the delivery pipe, and then tighten the pipe end connector.
- Q: What is the meaning of cast - in - place concrete secondary grouting?
- Grouting large amount of multi-purpose mechanical, the main source of power for a large number of air compressors.
- Q: How is the mortar in concrete pumping concrete coexisting and distinguishing in a pump?
- When the pump starts to press the concrete, the speed should be slow, when the concrete is sent to the end of the pipe, the speed can be gradually accelerated, and transferred to the normal degree of pumping.
- Q: How much concrete can the pump pump pump for an hour?
- Construction speed in two ways: on the one hand is based on the pump master experience to effectively carry out construction operations.
- Q: What is the difference between the concrete pump and the concrete pump?
- The power of the concrete pump through the power transfer box to the engine power transmission to the hydraulic pump or rear axle, hydraulic pump to promote the piston to drive the concrete pump work. And then use the pump on the cloth rod and the delivery pipe, the concrete will be transported to a certain height and distance.
- Q: What are the requirements for the selection of concrete pump tubing and the setting of the bracket?
- The bracket shall be determined by calculation and, if necessary, the structure of the position shall be checked;
Send your message to us
Concrete Pump Trailer Pump Diesel Engine HBTS30
- Loading Port:
- Lianyungang
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 50 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords