Concrete Pump Trailer Pump Electric Motor HBTS40
- Loading Port:
- Lianyungang
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 50 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Product Description:
It is commonly referred to as a line pump or trailer-mounted concrete pump. This pump requires steel or flexible concrete placinghoses to be manually attached to the outlet of the machine. Those hoses are linked together and lead to wherever the concrete needs to be placed. Line pumps normally pump concrete at lower volumes than boom pumps and are used for smaller volume concrete placing applications such as swimming pools,sidewalks, and single family home concrete slabs and most ground slabs.
Main Product Features:
1. Import generator is optional.
2. The high quality hydraulic valves and oil pump use Germen KAWASAKI products.
3. The valve for change-over from high pressure to lower pressure is designed to be easily controlled, which can adjust the condition of the pump easily in accordance with the requirement of job site. Dismantle the tube is not necessary so that it can avoid the pollution.
Product Specifications:
Parameter/ unit | HBT40 |
Max theory Output(m3/h) | 55 |
Max Pumping Pressure(MPa) | 10 |
Hydraulic system type | Open |
Power mode | Electric Motor |
Speed(r/min) | 1480 |
Power(kw) | 55 |
Valve type | S |
Diameter of oil cylinder(mm) | 180 |
High- lowe pressure switching | Yes |
Hydraulic oil tank capacity(L) | 280 |
Hopper capacity(m3) | 0.4 |
Hopper jeight(mm) | 1260 |
Total mass(kg) | 3200 |
Dimension: L*W*H(mm) | 5400/1860/1900 |
Our Advantages:
1.Training Solutions – we develop our people through high impact training. We increase the connective intelligence potential of individuals and teams through practical, solution-focused programs in areas such as innovation, team collaboration, management development, strategic thinking and decision making.
2. Coaching Solutions - we increase leadership potential with performance coaching. We increase the connective intelligence potential of our managers and key contributors, assessing and developing both their cognitive and emotional intelligence's (capabilities) as the latest research, and practical experience, indicates that both are needed to drive sustained performance.
3. Reward Solutions – We reward our deserving people based on performance (we ensure equitable treatment of employees because appraisals are based on result of performance) by providing the necessary incentives. Its components can be a combination of bonuses, a range of appropriate benefits such as International trips, commissions and Stock option incentive plan for management & senior workers.
FAQ:
Q1: How do we guarantee the quality of our products?
A1: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.
Q2: How soon can we receive the product after purchase?
A2: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon international and government factors, but is typically 30 to 60 workdays.
Q3: If we can produce some Trailer Pump according to customers request?
A3: Yes, we can produce Trailer Pump according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.
Q4: How to make a quick resolution for after service?
A4: OKorder and our manufacture both have overseas branches all-around of world, if necessary, the seller shall dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary facilities & skilled personnel at site for training.
- Q: What is the performance of the 60-type concrete pump?
- Distribution valve type S pipe valve (integral casting)Concrete cylinderBore × travel mm 200 × 1650 specifications:
- Q: What is the price of concrete pump truck?
- A total of more than a dozen people dare to do pump, the price is very cheap, the cheapest 50 million or so, with the fake Dongfeng chassis, all the problems.
- Q: What parts are concrete pump parts?
- The concrete cylinder is connected with the main cylinder piston rod, under the action of the main cylinder hydraulic oil, for reciprocating motion, one cylinder is advanced, the other cylinder is retreated; the concrete cylinder outlet is connected with the hopper, the one end of the distribution valve is connected with the discharge port,
- Q: How to install concrete pump
- 2, after the operation of concrete pump, such as high-pressure filter transmitter in a red position, you need to replace the filter.
- Q: What measures should be taken in the construction of the underground garage
- 1. In the middle of the garage between the two beams with a sleepers into the channel for the pump on the top of the passage.
- Q: What factors will be taken into account when selecting the pump chassis?
- Strong competition in the construction sector, most pump users will think that well-known brands of vehicles will give them the advantage of business bidding;
- Q: What is the fuel consumption per vehicle per kilometer and the fuel consumption per pump when pumping?
- According to your situation, if it is Isuzu chassis pump that is quite fuel-efficient, 100 km fuel consumption is about 30-35 liters
- Q: What are the types of concrete pump trucks?
- More requirements for the venue. Followed by car pump. The advantage is that the occupying space is relatively small. The relative cost is relatively low. But the labor intensity is relatively large. The advantage is low operating costs. If the use of high-pressure pipe operations
- Q: What are the requirements for the selection of concrete pump tubing and the setting of the bracket?
- 3 delivery pump pipe fittings should be tightly connected to the pipeline to the pipeline should be smooth;
- Q: What is the purpose of concrete pump truck?
- Adapt to the urban construction, residential quarters, recreation venues, overpasses, airports and other construction of concrete construction.
Send your message to us
Concrete Pump Trailer Pump Electric Motor HBTS40
- Loading Port:
- Lianyungang
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 50 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords