Concrete Pump Good Quality 37m Truck-Mounted
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Concrete Pump Good Quality 37m Truck-Mounted
Product Details
Basic Info.
Model NO.:37m
Type:Concrete Pump
Machining Process:Hydraulic
Certification:ISO9001: 2000, CE
Condition:New
Boom Reach Height:34m
Chassis:HOWO
Emission Standard:Euro III,Euro IV
Export Markets:Global
Additional Info.
Trademark:Hongda Tielishi
Packing:Nake
Standard:CE, CCC
Origin:China
HS Code:870590909
Production Capacity:50
Product Description
37m concrete pump with boom –HD5291THB-37/4 | Unit | Parameter | |
Main Technical Parameters in Service | Theoretical Pumping Capacity | m3/h | 150 |
Theoretical Pumping Pressure | Mpa | 8.5 | |
Hopper Capacity | L | 700 | |
Feeding Height | mm | 1370 | |
Distributing Valve Form | S-pipe valve | ||
Max. Distributing Radius | m | 33.2 | |
Max. Distributing Height | m | 37.2 | |
Max. Distributing Depth | m | 24.3 | |
Height of Distributing Boom When Stretched | mm | 8450 | |
Distance between Front Landing Legs | mm | 6507 | |
Distance between Rear Landing Legs | mm | 6600 | |
Distance between Front and Rear Landing Legs | mm | 7179 | |
Diameter of Conveying Pipe | mm | 125 | |
Length of Tail Hose | m | 4 | |
RotaryRangeof Distributing Boom | 365° | ||
Number of Boom Sections | 4 | ||
Rotary Angle of Each Boom Section | ° | 92/180180//270 | |
Remote-control Distance | m | 200 | |
Main Technical Parameters in Traveling Condition | Max. Traveling Speed | km/h | 90 |
Min. Turning Radius | mm | 8800 | |
Brake Distance | m | 7 | |
Approach Angle | ° | 16 | |
Departure Angle | ° | 11 | |
Chassis Model | ZZ5307N4647C | ||
Wheel Base between the First and the Second Axle | mm | 4600 | |
Wheel Base between the Second and the Third Axle | mm | 1350 | |
Front Tread | mm | 2022 | |
Rear Tread | mm | 1830 | |
Max. Engine Power | kw | 247, 2200r/min) | |
Max Engine Torque | n.m | 1350(1100-1600r/min) | |
Max. Grade Ability | % | 35 | |
Fuel Consumption Limit | L/100km | 34 | |
Overall Dimension (L ×W× H) | mm | 12000×2490×3850 | |
Full-load Total Weight | kg | 29000 |
- Q: How does the cement slurry solidify inside the concrete pump?
- Be sure to stop the pump, and then add water and detergent to the pump or detergent or other additives, or other chemical reagents, the first positive pump cleaning, and then anti-pump cleaning, repeated several times, and finally
- Q: How to determine the concrete pump truck blocking the site
- Pumping action and hydraulic system are normal, no abnormal sound and vibration, the hopper has a larger aggregate or agglomeration, at the feed port stuck or arch and blocked.
- Q: How the concrete pump truck is fuel tank?
- A 90-degree connector and a check valve consisting of a one-way valve. The principle is that when the hydraulic oil is pumped from the cavity of a main cylinder (the active cylinder) the cylinder moves forward and the other side of the piston
- Q: How to prevent concrete pump blockage
- Improper operation: the operator to concentrate, to avoid abnormal pressure gauge readings; pumping speed to meet the equipment requirements; pumping more than the amount of material can not be lower than the stirring shaft; Tan degree to control in the 80-230mm; downtime control in 15
- Q: What is the lubrication of the concrete pump before it is transported to the concrete?
- Concrete pump to transport concrete before the pipeline lubrication
- Q: Why concrete pump down to play always block the tube
- do not for the convenience of the construction to enlarge the slump, down to fight the concrete The greater the slump, the easier it is to block
- Q: What is the meaning of cast - in - place concrete secondary grouting?
- Cast concrete is cast at the construction site. Unlike prefabricated concrete, most buildings are constructed using cast-in-place concrete.
- Q: How to deal with pumping concrete pump pipe pipe burst after the burst, the pump can not stop the situation?
- Some poor concrete, stop half an hour afraid of blocking the pump, some four hours are all right.The past is relatively poor concrete, stop the pump to block the pump
- Q: How much concrete construction is needed for concrete pump construction
- The pump body installed in the car chassis, and then equipped with retractable or inflected cloth rod, the composition of the pump.
- Q: What is the introduction of fine stone concrete pump
- especially in the narrow construction site. It has the advantages of high safety, high efficiency, good quality, low environmental pollution,
Send your message to us
Concrete Pump Good Quality 37m Truck-Mounted
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords