• CNBM- Bridge Girder Launching Gantry Truss Girder for Bridge Construction hot sale System 1
  • CNBM- Bridge Girder Launching Gantry Truss Girder for Bridge Construction hot sale System 2
CNBM- Bridge Girder Launching Gantry Truss Girder for Bridge Construction hot sale

CNBM- Bridge Girder Launching Gantry Truss Girder for Bridge Construction hot sale

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
2000 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Product Description:

 

Lifting Capacity: 60-200T

Span Length: 20-50M

Operation method: Pendant control, remote control, operating cabin

 

Design Features of Bridge Girder Launching Gantry Truss Girder for Bridge Construction

1. Reliable performance

a) Apply the latest separate pinned structure of triangular space truss to main girder, so as to improve the stiffness and strength of whole crane.

b) Main girder is made of Q345 high strength steel, and melt into the latest design to ensure the main girder can work under high strength mode safely.

c) Modern crane brand launching crane is pioneering in continuous one time operation during bridge launching progress in China. It is of the most complete function launching crane for single machine domestically.

d) Compared with similar products from other supplier, Moderncrane brand launching crane have its unique design concept to the most difficult hole-span during bridge erection, in the way of laying side beam. So, it is safer to operate under high difficult and risk condition.

e) Powerful front, middle beam and three transom crane connect together to ensure transverse stability during bridge erection fully.

f) There is separate stroke switch control to each traveling mechanism, so as to decrease mutual collision between each traveling mechanism.

g) Overload resistance system: there is high performance weight limiter on two sets of trolleys, so if the lifting girder is overloading, the weight limiter will stop it at once.

h) There are normally three legs from other supplier. But we have four legs, including one front leg, one middle leg, one rear leg and one temporary leg.

i) Apply inner shrink leg to one time erect side beam in position and have more safety.

 

2. More powerful corrosion resistance

a) Strictly execute standard painting process to ensure blasting and painting quality.

b) Apply H steel enclosed section for main girder chord. Web chord is made by customized square tube to realize enclosed welding, which can avoid inner rust.

 

3. Higher working efficiency

a) There is traveling rail together with main girder, trolley and longitudinal crane. So, it is no need to lay traveling rail more. In this way, a lot of auxiliary materials are saved and production time is also saved.

b) Modern crane launching crane has higher working efficiency, with 6~8 pieces girder erection every day, based on enough concrete plate supplying, skilled operator and good condition at site.

 

4. More flexibility

a) It is symmetrically designed. Two way girder erections can be realized without split and slewing at original place.

b) Use one meter of hydraulic jack for front leg and rear leg. This design improves working efficiency, safety and flexibility largely.

c) Erect skew bridge by inclined way. Apply rotary face flange to connect each mechanism and structure, to erect 0~45°skew bridge. Side beam can be positioned one time for over 320m curve radius bridge.

 

5. Easier assembly and disassembly

a) Each structure is connected by pins and bolts to facilitate assembly.

b) Normally one set of launching crane can be assembled within 7days.

 

CNBM- Bridge Girder Launching Gantry Truss Girder for Bridge Construction hot sale

Q: Do you mind if I operate heavy machinery under the influence of you?
Strange out there questions deserve strange out there answers :) so here goes, no I don't mind if you don't mind operating soft toys under me ha ha ha
Q: The machinery will be depreciated over ten years using the double-declining balance method. If depreciation is computed on the basis of the nearest full month, Foley should record depreciation expense for 2007 on this machinery of $20,800. $20,400. $20,550. $20,933.
Assume the machine useful life is 10 years Double-declining-balance method Rate: Double of straight-line rate 100%/10=10% x 2 =20% Depreciation Expense: Year 2006: $120,000 x 20% =$24,000 (whole year) $24,000/12=$2,000 (every month) There are only 8 months (May-Dec.) $2,000 x 8 = $16,000 Year 2007: ($120,000-16,000) x 20% = $20,800 Unlike the other depreciation methods, salvage value is ignored in determining the amount to which the declining balance rate is applied. Depreciationn stops when the asset's book value equals expected salvage value.
Q: This machine presses a sheet of Formica countertop over a piece of wood (mold). Its commercial machinery. Any help would be greatly appreciated.
Possibly a forming machine.
Q: Please tell me how to use the multimeter to measure those aspects when the working circuit of construction machinery is out of order
Measure the control circuit first, and then measure the motor to short-circuit the ground, then measure whether the interphase is short circuited and check step by step.
Q: A guy my husband works with has a fellow employee that operates a crane and him and his crane are the only cranes on the entire work site that a whole flock of bees in attracted to and he has gotten stung many times already and wants to know of anything natural or not that is cheap and easy that could repel the bees away. help plz...
Call in a local bee keeper, have the hive collected and moved.
Q: What about the marketing department of mechanical engineering students?
Construction machinery market is still very large... Mainly to lease sales of construction machinery to those construction units based.
Q: we have recently purchased some plant machinery such as back hoes front loaders and excavators, should have they come with a title or do we need to get one and how
I am not aware of a title for this type equipment. Normally you keep a copy of the machines serial numbers and bill of sale.
Q: Hi,Do you know where can i download the book 'Electrical Machinery by FITZGERALD 'thank yahoo for this service and thank you!
Due to copyright laws, very few books are available free. This book can be purchased at Amazon for $160. Alibris sells it for $122.
Q: Hi allI wonder if anyone out there has the answer to my question.My son got caught yesterday driving whilst on his mobile.. and yep he got caught by the police. He already has 9 points on his license so these 3 new points for using the mobile are going to automatically ban him for a year.He works as a ground worker and drives machinery ie: dumper truck and roller etcDoes anyone know if he can still drive the machinery???And ideas about how he may get off the 3 points.. can he take a course or something?Any ideas are gratefully accepted.Many thanks
He needs to do everything he can to avoid those points. His companies insurance may not allow him to drive any of the company vehicles (on road or off) with a suspended license.
Q: I would like an example workout routine thank you! :)
I like to take a deck of cards and make each suite represent a certain workout of my choice, and the number of the card tells me how many of them to do. for example: hearts = minutes of jogging in place, or anything cardio spades = pushups or anything upper body clubs = crunches or anything mid section diamonds = squats or anything lower body. and then for face cards jacks = 11 queens = 12 kings = 13 aces = 14 joker = 15 of everything It's like a game where the object is to get through the entire deck.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords