butterfly wing nut cast steel for building
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 pc
- Supply Capability:
- 10000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Model Number: | SD-4006A | ||||
Color: | white/yellow or as you want | Material: | ductile cast iron | Weight: | 0.3KG |
Name: | butterfly wing nut cast steel for building | Inner hole: | dia 15/17mm | Type: | scafolding parts |
Packaging & Delivery
Packaging Detail: | steel pallets or as you want |
Delivery Detail: | 20-45days or as your quantity |
Specifications
butterfly wing nut cast steel for building
Material:ductile cast iron
Weight:0.3KG
Type: scaffolding accessories
butterfly wing nut cast steel for building
Product details
Name:cast wing nut fastener
Material:Cast steel
Surface:zinc plate/electroplate
Standard:Iternational standard
Weight:0.3KG
Color:white/yellow or as you want
Package:steel pallets/plywood or as you need
Basic Information
Product/Service (We Sell): | Scaffolding Couplers,Scaffolding,Scaffolding Accessories,Formwork Accessories | |
Number of Employees: | 51 - 100 People |
Trade & Market
Main Markets: | Central America Africa South Asia Southeast Asia Oceania Southern Europe South America North America Eastern Asia Mid East Western Europe | |
Total Annual Sales Volume: | US$1 Million - US$2.5 Million | |
Export Percentage: | 81% - 90% |
- Q: Does anyone know the name of the song or perhaps have a link to the video if they have seen it on net for example on youtube.?
- try ain't goin down till the sun comes up
- Q: I want to know the classification of scaffolding in the building
- Steel tubular scaffold. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding and so on. ScaffoldingBowl buckle steel pipe scaffolding when using steel pipe, as a "single steel pipe scaffolding"; when using the steel cross bar, for the "steel pipe based scaffold".
- Q: What are the characteristics of disc scaffolding
- Disc scaffolding and scaffolding, for manufacturers, construction units, rental units refer to a scaffold, just two different names. The same scaffolding.
- Q: How to calculate the double wall scaffolding
- Calculation of bearing capacity of foundation:The average pressure of the bottom of the vertical rod foundation should meet the requirements of the formulaP = FGDesign value of foundation bearing capacity:FG = fgk x Kc = 200 kN/m2;
- Q: So I had a scaffold/industrial done about 10 weeks ago, and its been infected at the top hole only for about 3/4 weeks. It has like a little bubble near the hole and sometimes its filled with pus a little bit and sometimes its not. Well I went the doctors about 2 weeks ago and he prescribed me a weeks worth of antibiotics as well as anti-septic cream. So I took the pills for a week and it was clearing up, I was also applying the cream twice a day. But then yesterday I noticed the lump has gotten a little bit bigger. I don't know what to do, should I take it out? But I really don't want to. And plus the doc said to wait up to 3 weeks and if nothings changed to go back and take it out. If I continue to use the cream, will it eventually go? Thanks :)
- If so, its hypertrohic scarring, a common occurence in cartilaginous piercings caused by too much jewelry movement/improperly fitted jewelry. It can be treated by applying tea tree oil to the bump once or twice a day.
- Q: 21M high full scaffold erection scheme
- dismantle4.1 the accurate preparation before dismantling the scaffold shall comply with the following requirements:1 should be a comprehensive inspection of the scaffold fastener connection, even wall pieces, support system is in line with the requirements of the structure;
- Q: I really want to get one done and I would like it if someone could tell me how badly does it really hurt? During and after. I know everybody has different pain thresholds but on average? I'm just nervous to get it done but really want another piercing on my ears. I have my lobes and a cartilage on my right ear. How easy is it to clean? rate in numbers as well as a description. Thanks.
- My lip piercing did not harm in any respect. i've got not got an anti-tragus piercing, yet I do have a ordinary tragus piercing and that harm even under the lip. To be elementary, they are the two very tolerable. My navel piercing harm better than the two one in each of them.
- Q: A 520 kg box sits 1.4 m from the left end. What is the tension in the right hand side wire? (g = 9.8 m/s2) ____________ Newtons
- Because the scaffold is not moving, we can assume that the net Torque acting on the scaffold equals zero. Net Torque = 0 torque = Force x distance (d) Use the left end of the scaffold as the center point. This will eliminate the Torque caused by the left wire (d = 0, so torque = 0) There are now three forces creating torque on the scaffold. There is the weight (m x g) of the scaffold, at 3.5m from the left end. m1 x g x 3.5m There is the weight of the crate, located 1.4m from the left end: m2 x g x 1.4m These two torques are countered by the torque caused by the Tension (T) of the right wire, located 7m from the left side. T x 7m The sum of these torques is zero. (T x 7m) - (m1 x g x 3.5m) - (m2 x g x 1.4m) = zero solve for T T = ((m1 x g x 3.5m) + (m2 x g x 1.4m)) / 7m T = ((115kg x 9.8m/s^2 x 3.5m) + (520kg x 9.8m/s^2 x 1.4m)) = 1.58 x 10^3 N Hope this helps.
- Q: Which hurts less, the piercing at the top of the ear, or the piercing from one side of the upper ear to the other?Thanks. =)
- The first piercing of the scaffold will feel the same as getting your helix done. The second will hurt a bit more. The healing of a scaffold, however, will probably be more painful than just one helix piercing and will take a bit longer.
- Q: i am getting my industrial (scaffold) pierced on one ear and i want my cartilage on the other ear, how long do i have to wait between them? What are pros and cons for industrial (scaffold)? what are risks and stuff and how much is it? i want to get it so any information or anything i should know would be great thanks especially for industrial:)
- You can have both done in the same day if you can handle the pain and shock. Get the industrial done first, and if you still feel OK afterwords, you can get your other ear done by the same piercer. Talk to him/her and let them know what you want to do before you start. If you feel like you need to wait after the industrial, wait at least a day before getting the second piercing. It's all about what you can handle.
Send your message to us
butterfly wing nut cast steel for building
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 pc
- Supply Capability:
- 10000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords