• Busway Copper Electrical Compact Bus duct Busbar Trunking System Busway Bus Duct(400A 5P) System 1
  • Busway Copper Electrical Compact Bus duct Busbar Trunking System Busway Bus Duct(400A 5P) System 2
  • Busway Copper Electrical Compact Bus duct Busbar Trunking System Busway Bus Duct(400A 5P) System 3
  • Busway Copper Electrical Compact Bus duct Busbar Trunking System Busway Bus Duct(400A 5P) System 4
  • Busway Copper Electrical Compact Bus duct Busbar Trunking System Busway Bus Duct(400A 5P) System 5
  • Busway Copper Electrical Compact Bus duct Busbar Trunking System Busway Bus Duct(400A 5P) System 6
Busway Copper Electrical Compact Bus duct Busbar Trunking System Busway Bus Duct(400A 5P)

Busway Copper Electrical Compact Bus duct Busbar Trunking System Busway Bus Duct(400A 5P)

Ref Price:
get latest price
Loading Port:
QINGDAO
Payment Terms:
TT OR LC
Min Order Qty:
50 m
Supply Capability:
20000 m/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

The CY-L series housing one-piece processing and molding technology effectively solves the problem of weak protection ability of busbar joints in aluminum alloy housing, making the overall protection level of busbar reach IP65. The fully enclosed structure reduces the accumulation of dust in the busbar groove. The electrostatic spraying of polyester powder has excellent corrosion resistance performance.

Conductors are closely arranged, with overall heat dissipation, the bus duct has a lower temperature rise value; the bus duct structure is compact, occupying a smaller space in the building.



CY-L series busbar grounding system adopts advanced overall grounding method (IGB structure), with 50% phase line capacity. Ensure the integrity and continuity of the grounding line. When a high-capacity grounding fault occurs, it can effectively ground and protect the entire system, while reducing eddy current loss. The overall shell of the busbar is assembled by steel rivet with small pitch riveting, which makes the busbar have excellent short-term tolerance performance and higher safety. Safety eliminates the possibility of human electric shock.

Q: What are the two power distribution equipment?
Such as measuring instrument, relay, switch, button operation and automatic control to provide some of these devices the energy supply device, signal equipment, computer equipment, and control cable (such as batteries, silicon rectifier, etc.).
Q: AC distribution equipment including distribution box
protection of the power supply system is between the power supply and the load are connected, disconnected, conversion
Q: DC transmission equipment
DC screen commonly known as intelligent maintenance free DC power supply screen, referred to as DC screen, the general model is GZDW.
Q: What is the power equipment in the distribution room?
High voltage distribution room generally refers to the 6kV - 10kV high voltage switch room; low voltage distribution room is generally refers to the 10kV or 35kV station with variable line 400V distribution room
Q: What is the role of transmission system and distribution system in power grid
The distribution of power resources and power load centers in most countries in the world is inconsistent.
Q: Transmission lines are not electrical equipment?
Transmission lines are not electrical equipment? The answer is: the device is a function of the assembly
Q: An introduction to the interpretation of flexible AC transmission systems
The parallel compensation device, such as static var compensator (SVC), thyristor controlled braking resistor (TCBR), static
Q: Rural high voltage transmission line equipment ownership
You do not want to what the transformer behind the high-voltage line,
Q: Transmission and transformation equipment
High voltage has a very high risk, and the target electrical appliances do not need such a high voltage, which needs to reduce the voltage through the transformer
Q: Power distribution equipment should be prepared before the blackout?
after the high and low voltage power failure, the work must be carried out before the first inspection

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches