Bungee feeding machine AWP8.2000/10.2000
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Dual Mast Aerial Work Platform
1KG=2.2LB 1INCH=25.4MM
Model No. | AWP8.2000 | AWP10.2000 | |
Lifting Height | mm | 8000 | 10000 |
Rated Capacity | Kg | 300 | 300 |
Platform Size | mm | 1200x600 | 1440x600 |
Power Source | V | 220~240 | 220~240 |
Motor Power | kw | 0.75 | 0.75 |
Outer Dimension | mm | 1530x840x1900 | 1750x840x1900 |
Net Weight | Kg | 570 | 728 |
Suit for 1-2 person to work upraised
With 300KG rated capacity
Maximum platform height (optional) :6m;8m;10m;12m
Power supply:Optional single phase AC(default) , DC
Heavy-duty Aluminium Mast
Equipped with an Emergency Stop
Free-maintenance Battery
Lifting and lowering are controlled well by Hydraulic system
Buttons inside of the controlling box are imported from U.S.A.
Conforms to EN292-1,EN292-2,En280
- Q: I am related to building and construction business. I want to buy new and second hand building and construction machinery like cairns and excavators. Can you tell me any good web site where I can check the prices and specifications of these machineries and buy them?
- not known.
- Q: have trouble doing anything as i injured my right hand an i'm right handed and live alone.
- You should be getting Workman's comp. Its an injury that happened at work, regardless whether it was from their negligence or not. If you sue and still wanna work there, they cannot fire you. At least, they would have to come up with some other reason for the dismissal but if you have been there for yrs and suddenly they fire you after you have filed suit, its seems pretty obvious. I would certainly consult an attorney.
- Q: Which prescription drug goes best with Jack Daniels when operating heavy machinery?
- Roofies
- Q: I swore into the Navy and i chose MR over a few other jobs, the other jobs sucked and they said this was the better one of them all. Do you know where MR's are usually stationed and if its a cool job? thanks
- You need a job that you can be happy with. Too many guys go in with no idea, and end up really mad at the system. The time they spend ends up being a waste. I liked being an ET. As a Computer System Analyst, anyone who thinks it is not the highest tech job is crazy. I wrote code and repaired circuits; so it was working on both hardware and software. Often trying to figure out which side the problem was on. I later got into Intell, and served as a Command Intelligence Officer. Which was also cool. I know a lot of Nucs too. Really it is all good. I do recommend that you consider subs. On subs your working with a better group of guys. More bubbleheads have degrees than you would see on a surface ship, and your more encouraged to finish a degree, or three. Also your more encouraged to invest and built a portfolio. Bubbleheads are paid more, and encouraged to attend courses on tax-planning and investing. So it is possible to come out at 20 years with multiple degrees and very wealthy. But the most important thing is to be happy with your choice.
- Q: i need to focus on the movement of machines and film them. such as car factories with arm robots, production lines, moving conveyabelt, anything relating to machines!!! please help.
- Set your camera up in front of your TV. Then, pop in any of the Terminator dvds.... I'm here to help. Just ask, kid.
- Q: I want to ask about a piece of machinery that looks like a handheld jackhammer, but instead of a chisel it has something that looks like a square plate, i dont know if it is pneumatic or electric, but i am sure that it operates the same way with a jackhammer. Does anyone know its name?
- Vulcan hammer maybe
- Q: What are the concrete construction machinery?
- Construction machinery and equipment for reinforced concrete works: 1. Steel bar: butt welding machine (butt steel bar), steel bending machine, electric welding machine. Two, bricklayer: concrete mixer, insert type vibrator, plate vibrator. Three. Shell planer: woodworking planer, sawing machine.
- Q: don't know where I'm going with this question, but I suppose the point of the question is,what are you doing with your life?Are you in control of your life and finding happiness,or are you miserable just waiting for the end?Is life a puzzle that you're putting the pieces together, learning something new every day and seeing the bigger picture - with you in it.I don't know that this is a clear or concise question, its intended as open ended, but a specific point - not that I'm making a sarcastic rhetorical point just that the point is - where are you emotionally in life
- what are you doing with your life? Are you in control of your life and finding happiness, or are you miserable just waiting for the end? I am trying to get a better job, going to college. Happiness? What's that? I usually wish the world would just hurry up and end so I don't have to put up with this place anymore. Technically I'm tired of it all.
- Q: There was an ozone storm and a mean looking green clown face truck involved. I think Lou diamond Phillips was in this movie. The humans ended up in a truck stop and all the trucks were circling the truck stop trying to get at the humans inside.
- Stephen Kings Maximum Overdrive
- Q: What types of machinery are needed to produce a computer and it's parts?BEST ANSWER 10 POINTS WITHIN THE HOUR!
- Like from scratch? All of the parts? I would start with a factory which can build chips. You will need to produce all the chips in your computer; CPU, RAM, and a bunch of other chips for I/O access etc. Then you will need to produce the motherboard PCB. Then another factory to build hard drives and optical drives. Then another factory to build the case. Oh, yes, another one to build power supplies. But nobody builds computers like this. A manufacturer will make some parts but buy the rest from suppliers.
Send your message to us
Bungee feeding machine AWP8.2000/10.2000
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords