• Black Scaffolding Tube 48.3*4.0 Q235 Steel Standard EN39/BS1139 for Sale CNBM System 1
  • Black Scaffolding Tube 48.3*4.0 Q235 Steel Standard EN39/BS1139 for Sale CNBM System 2
Black Scaffolding Tube 48.3*4.0 Q235 Steel Standard EN39/BS1139 for Sale CNBM

Black Scaffolding Tube 48.3*4.0 Q235 Steel Standard EN39/BS1139 for Sale CNBM

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m.t.
Supply Capability:
30000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

  • Quick Details of Black Scaffolding Tube 48.3*4.0mm Q235 Steel EN39/BS1139

  • Material :Q235 (Carbon 235 Steel)

  • Size : 48.3*4.0mm

  • Surface treatment :Black/Painted/Galvanized

  • Color : black

    Standard:EN39/BS1139

  • Black Scaffolding Tube 48.3*4.0 Q235 Steel Standard EN39/BS1139 for Sale CNBM

  • Black Scaffolding Tube 48.3*4.0 Q235 Steel Standard EN39/BS1139 for Sale CNBM


  • Futures of Black Scaffolding Tube 48.3*4.0mm Q235 Steel EN39/BS1139

  • Scaffolding tubes performance various functions in building & construction applications.

Especially recommended for high-floor construction & decoration projects with potential safety hazard, but requiring a convenient & safe decoration & construction operation with safeguard & perimeter safety nets.

  • Low cost & high load bearing capacity

  • Easy installation & operation& transport


  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Q: I'm gonna be getting piercings this weekend, so i know im already getting my nose. but i want to get my ear. like barbell? so what's the difference between Scaffold and Industrial?
Nothing... The piercer will use an extra long barbell, most likely a 14 gauge.. too.
Q: I want to get something pierced. My mom wont let me get anything on my face pierced but she will allow ear and body piercings. I thought about a belly ring but everyone has one amd i'm very skinny and scared it'd rip out. so i've been looking at ear piercings and really like a Targus piercing or a scaffold. But i don't know anything about them really. If you could which one is more painful, problems with them etc. please help, thank you
If you want to be different AND have something that looks really cute, get a micro dermal. Either on your collar bone, or lower back dimples if you have cute ones! Good luck hun!
Q: Electric basket accessories are generic
Electric basket full name is called electric gondola, the construction of electric basket is mainly suitable for high-rise buildings on the electric power from the electric hoist special basket, basket accessories have what those:
Q: what are two burdens for each character? What action does each character indicate that she or he is indeed free from their burdens?
Tell me what you know and I will elaborate. I had to read this book for a class and hated it, but I won't do your homework for you. I will help if you show you read it yourself and put in some effort we can see
Q: what do you think?pain wise? i know it's going to hurt as it's a peircing (duh) but will it hurt especially as it's two thick pieces of cartilage?
It's not going to hurt 'especially' don't worry. :) xoxox
Q: He pushes a can over the scaffold at 15 meters and it takes 3.25 seconds for it to land.I keep doing the problem over and over. the Correct answer is 20.5 m/s, however I keep arriving to the solution of 17 m/s. I solved it by doing Vf^2 = Vi^2 + 2adwhere the initial velocity is zero and the acceleration is -g. I made my coordinate system so that down is negative in which the distance will be negative. This however, did not give me the correct answer. Am I right or is the book right?
The initial velocity is not zero since the scaffold is moving upward when the can gets pushed over. And final velocity, vf, does not represent the speed of the scaffold (if that is what you're trying to solve). y = (vo)(t) - (1/2)gt? 15 m = (vo)(3.25 s) - (1/2)(9.81 m/s?)(3.25 s)? vo = +20.5 m/s
Q: So im a guyAnd I might get oneAnyone had one before/got one?Any advice?How much do they normaly cost?if you answer this i will love you forever :)
I think industrials look extremely sexy on guys! I have one in each ear, and they cost 75 each ask to get it pierced with a smaller gauge, they usually pierce with 14g and it looks too big on most people and is more likely to bubble over. Im a girl so this wont be a problem for you, long hair really sucks with these piercings so I suggest pinning it back. Get the ear pierced that you are less likely to sleep on, getting it pulled on while you sleep really agitated the piercing. Keep it clean, use medicated or anti bacterial soap at least five times a day. clean it with qtips. uhm that's all I can think of right now. Best of Luck!
Q: Im a wimp for pain and im looking to get my scaffolding done. i want to know how painful it isI already have both lobs pierced and stretched to an 8mm, will the pain be similar to that?
Depends on your pain tolerance, it's different for everyone. But generally cartilage piercings feel nothing like getting piercings stretched.
Q: i am getting my industrial (scaffold) pierced on one ear and i want my cartilage on the other ear, how long do i have to wait between them? What are pros and cons for industrial (scaffold)? what are risks and stuff and how much is it? i want to get it so any information or anything i should know would be great thanks especially for industrial:)
You can have both done in the same day if you can handle the pain and shock. Get the industrial done first, and if you still feel OK afterwords, you can get your other ear done by the same piercer. Talk to him/her and let them know what you want to do before you start. If you feel like you need to wait after the industrial, wait at least a day before getting the second piercing. It's all about what you can handle.
Q: I got my scaffolding approximately about 7 weeks ago maybe just a lil over, I want to know when is a good time to change the bar/take it out, I am keeping up with cleaning it 2 to 3 times a day with the saline solution, even though, it only requires to be cleaned 1-2 times a day to be fair though
Scaffold piercings, being two cartilage piercings connected by a single bar, take six months for initial healing and twelve months for a fully healed tunnel of flesh to be formed. Don't change it yet, I assure you, you will regret it. Just be patient, keep on cleaning, cleaning, salt-soaking.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords