• Best Price Hot Dip Galvanized Cuplock Scaffolding On Sales System 1
Best Price Hot Dip Galvanized Cuplock Scaffolding On Sales

Best Price Hot Dip Galvanized Cuplock Scaffolding On Sales

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
10000 pc
Supply Capability:
10000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details

Size:

500mm 1000mm 2000mm 3000mm etc

Material:

Q235 Q345

Surface Treatment:

H.D.G , Powder Coated , Painted

Thickness:

3.25mm

Diameter:

48.3mm

Key Word:

cuplock scaffolding

Lead Time:

3-4 Weeks

OME:

Offered

Packaging & Delivery

Packaging Detail:100pcs per bundle with strengthen strap
Delivery Detail:within 30 days after receiving your deposit

Specifications

cuplock scaffolding 
1.Q235 Q345 Material 
2.Diameter 48.3mm 
3.Wall Thickness: 3.0mm-3.5mm 
4. Finish: HDG , powder Coated

Best Price Hot Dip Galvanized Cuplock Scaffolding On Sales 

 

•Material: Q235 Q345 

 

•Surface Finish: H.D.G Powder Coated Painted 

 

•Standard : BS1139 EN74   

 

• Diameter : 48.3mm   

 

• Thickness: 3.25mm 

 

• Standard : 500mm 1000mm 1500mm 2000mm 2500mm 3000mm 4000mm   

 

• Ledger : 600mm 900mm 1000mm 1200mm 1250mm 1300mm 1500mm 1800mm 2000mm 2500mm 

 

• Intermediate Transom: 565mm 795mm 1300mm 1800mm  

 

• Hold Up Bracket: 291mm 565mm 795mm  

 

• Packaging Way: 100pcs per bundle with strengthen strap

 

• Delivery time:3-4 Weeks From Production Date 

 

• Minimum order: 1*20'Cintainer 

 

• Supply ability:   1,200 Tons/ Month 

NoItemData
1Brand
2Model
3MaterialQ235 Q345 
4Finish  Hot Dipped Galvanized/ Powder Coated/ Painted   
 5 Dia( Φ)48.3mm 
 6  Thickness3.0-3.5mm
7StandardBS1139 EN74 
8ComponentsStandard (Vertical) , Ledger , Transom, Brace , Bracket 
9Lead Time 3-4 Weeks 
 10OME Available 


Q: I have to write a 1 page commentary on a geographical issue for school, and, I've never done that before.Could someone please tell me or link me to a very simple 'writing commentary' scaffold for beginners?Please?Thankyou :)
A vegan alcoholic! A chuckle emerges, a laugh perhaps for a few more bobs. Absent the mind, nicely put.
Q: How to calculate the rental price of portal scaffolding
Fierce competition, is 2 yuan / sets / dayPulleys, pedals, and base are normally 1 yuan per day
Q: Sweeping rod, large cross bar, small cross bar, scissors brace, vertical pole, right angle fastener, rotating fastener, butt joint fastener, even wall piece! If there is a cantilever frame, the main beam, steel wire rope, such as pull down support
Mobile scaffolding is the main frame, cross frame, cross diagonal brace, foot board, adjustable base and other components. The cross rod is also called the diagonal pull rod, and is a cross connecting rod which is vertically connected with the two door frames. The part of both ends of the rod part is punched with a pin hole, and the locking pin on the vertical rod of the door and the frame is locked when assembling.
Q: What is the difference between Scaffolding and Zone of Proximal Development?
Taken from okorder: Vygotsky believed that when a student is at the zone of proximal development for a particular task, providing the appropriate assistance (scaffolding) will give the student enough of a boost to achieve the task. Once the student, with the benefit of scaffolding, masters the task, the scaffolding can then be removed and the student will then be able to complete the task again on his own.
Q: What are the common rules for calculating the amount of scaffolding works
The independent brick (stone column) less than 3.60M in height, scaffold to construct the core column multiplied by the circumference of high calculation, the implementation of masonry scaffolding in the shelf; column 3.60M with column wise, the structure of the circumference of the core column height calculated by multiplying plus 3.60M, the implementation of masonry scaffolding outside the shelf (single row). Where masonry height exceeds 1.5m of the masonry are required to calculate the scaffolding.
Q: Disc scaffolding and bowl buckle scaffolding which kind of bridge support better?
Characteristic1 Multi function. According to the specific requirements of construction, can be composed of multiple 0.6m module group frame size and load of single row, double row scaffolding, supporting frame, supporting the construction of equipment to enhance the function of frame columns, and other materials, and can do curve layout. Scaffolding can be adjusted with the bottom of the support, adjustable upper support, dual adjustable early demolition, pick beam, pick up the rack and other accessories with the use of various types of steel scaffolding can be used in conjunction with each other to achieve a variety of multi-functional
Q: Okay, quick question. I dropped into a couple of piercing studios yesterday to inquire about getting a scaffold done. Both places informed me that it's not a good idea to have it pierced with a bar straight off, as the pressure from the jewellery combined with the swelling when first pierced can seriously slow down the healing rate. Is this true? The second place said they will pierce both holes with rings, and these can be changed to a bar after around 6 to 8 weeks.Is this the best option? Thanks for any replies.
Having one bar can definitely put a lot of pressure on the piercing but it's the best way to go about getting an industrial piercing. It can be a difficult piercing to heal is all. If you get two rings it is very likely that one will slightly migrate in angle and that is going to make it impossible to properly fit a bar through the two holes. Plus, 6-8 weeks would be WAY way way too early to change a cartilage piercing. Try 6-12 months. And an industrial will never reject simply because of the bar, it will reject if it was pierced incorrectly or on someone's ear that is not anatomically correct for the piercing. And I promise, from someone who has had helix piercings done with rings and with straight barbells as well as having one single barbell through my industrial your hair can get caught on them all. If the bar fits properly the balls should fit pretty snugly against your ear.
Q: Why is it necessary to keep records of all inspection carried out on scaffolds as stated in Regulation 39?
To cover your A** in case of injury or an inspection.
Q: I got an industrial/scaffold piercing a few months ago and currently have captive bead rings in (The piercer put those in after he pierced it). The piercings are now healed enough for me to change the piercing, and I found an industrial bar on ebay which I'd really like to order. Only problem is, it has two choices on the gauge thickness and length, and I don't know which mine is.The gauge sizes available are 1.2mm (16g) or 1.6mm (14g) , and the length options are 32mm, 35mm, 38mm.Does anyone know which would be the best to get? Thanks.
Please ignore the the bigger the better idea. A longer bar can be as bad in an industrial piercing as a shorter bar can be. It really depends on what size you were pierced with...16g o 14g. Industrial piercings are typically done at 14g, 16g would be too small. The length depends on your anatomy...you really should go to a professional piercer to get the bar put in since your piercings aren't completely healed. That way everything can be 100% sterile and they will be able to fit the proper length of jewelry into your ear.
Q: scaffolding business?
scaffolding business would refer to building the business up in steps that are connected. A gradual increase, building up from what is already in place.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords