• Asphalt Batching Plant with productivity of 96t/h System 1
  • Asphalt Batching Plant with productivity of 96t/h System 2
  • Asphalt Batching Plant with productivity of 96t/h System 3
Asphalt Batching Plant with productivity of 96t/h

Asphalt Batching Plant with productivity of 96t/h

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 m.t.
Supply Capability:
1 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

LB1200 Asphalt Mixing Plant

Item

Description

Remarks

1

Aggregate batching machine:4 units

The bin capacity: 8M³ (flat hopper), total capacity 32M³;

1 set

2

The feeding belt conveyor

1 set

3

Drying drum

Dimension: Æ1700×7000 mm, the installation angel: 4°, the running speed 10.9rpm, rotation running through 4 units electric motor and cycloid reducer, the outer side wrapped with 50mm mineral wool thermal insulation layer with stainless steel.

1 set

4

The burning system: Italy EBICO oil burner

Fuel kinds :diesel& heavy oil, coal or gas;

with a diesel tank (10t) and a heavy oil tank (10t).

With China made Automatic burner ( as optional )

With China made coal burner ( as optional )

1 set

5

The inertial dust collector: Two-drum vertical cyclone dust collector

1set

6

Bag dust collector ,The bag material:NOMEX America

With water filter ( as optional )

1set

7

Hot aggregate elevator: adopts the double-chain elevating hopper, Hoisting capacity ≥120t/h

1set

8

The vibration screen unit of the hot aggregate: two layers four segments

1 set

9

The hot aggregate bin:4 bin, 10.9m3 totally

1 set

10

The weighing system for the hot aggregate, filler and bitumen

1 set

11

The mixer capacity: 1200 kg/batch; 22kw×2

1 set

12

The tower frame

The main tower with supporting legs, repairing platform and guardrail

1 set

13

The filler supplying system, capacity: 26m3;

Capacity:20 –30 tons/hour;

Power elevator (as optional)

1 set

14

The hot oil heating system and pipeline

the hot oil heater capacity 60×104KCal/h (coal heater as optional)

1 set

15

Asphalt tank and pipeline: 2 units of 25tons tanks (30 tons as optional)

3 sets

16

Pneumatic control system

1 set

17

The electric control system

Siemens PLC control ,Main electric parts :Simens or Schneider brand

Automatic and Manual control mode

1 set

18

Control room: .4.5m×2.25 m× 2.50 m

1 set

19

Finished asphalt storage silo ( 60tons, 120 tons ) as optional part

1 set

Total power:340KW

Total size: 37m*30.2m*15m(length*width*height)

Total weight: 115t

Price range: (FOB Qingdao China)

USD250000~360000$





Q: What kind of sand do you need for a concrete plant? I don't know where to start!
Which have so many requirements, sand silt content not too many, too many big rocks, soil, too much, artificial sand and river sand can, had better not use weathering sand, not according to the standard to which have the standard, is to see the skill of your lab
Q: The main components of a mixing station
The conveying system of materials is made up of three parts. Aggregate conveying; There are two ways of conveyance and belt conveyance. The advantage of hopper promotion is that the area is small and the structure is simple. The advantage of belt transport is that the transport is large, efficient and low. The belt conveyor mainly applies to the mixing stations that have aggregate storage, thereby increasing the productivity of the mixing stations. Powder conveying; The powder used in concrete is mainly cement, fly ash and mineral powder. The most commonly used powder conveyors are conveyors of screw conveyors, and the large mixing buildings are carried by pneumatic conveyer and scraper. The advantages of screw transport are simple structure, low cost and reliable use. Liquid transport mainly refers to water and liquid admixtures, which are delivered separately by water pumps
Q: What are the supporting facilities for the concrete mixing stations?
The facilities include concrete mixing equipment, concrete transportation equipment, experimental equipment, forklift truck, over-pound equipment, pump, and car pump etc. Concrete mixing station is mainly composed of mixing console, materials weighing system, material conveying system, material storage system and control system of large system and other ancillary facilities. Because building aggregate measurement compared with standing aggregate metering, reduced the four of the intermediate links, and the vertical blanking metering, saved measuring time, thus greatly improving the production efficiency, under the condition of the same model, mixing building production efficiency than mixing plant production efficiency by a third. Such as: HLS90 floor of production efficiency and production efficiency of HZS120 stand HLS120 floor of the production efficiency, production efficiency is equivalent to HZS180 stand HLS180 floor of the production efficiency is equivalent to the productivity of HZS240 station. Concrete mixers are a combination of concrete and concrete prefabrication. Because its mechanization, high degree of automation, productivity is high, and can guarantee the quality of concrete and cement, commonly used in concrete, long duration and site of quantities focus of large and medium-sized water conservancy, electric power, Bridges and other projects. Centralized with the development of municipal construction, stirring, provide commercial concrete mixing station has great advantages, and thus get rapid development, and to promote concrete pumping construction, the mixing, transportation, casting machinery joint operation to create the conditions.
Q: How much concrete is produced per hour by HZS180 concrete mixer?
One, 180 square of concrete per hour, 180 of HZS180 is its output per hour. The concept of concrete mixing stations: Concrete mixing station is mainly composed of mixing console, materials weighing system, material conveying system, material storage system and control system of large system and other ancillary facilities. Because building aggregate measurement compared with standing aggregate metering, reduced the four of the intermediate links, and the vertical blanking metering, saved measuring time, thus greatly improving the production efficiency, under the condition of the same model, mixing building production efficiency than mixing plant production efficiency by a third. Such as: HLS90 floor of production efficiency and production efficiency of HZS120 stand HLS120 floor of the production efficiency, production efficiency is equivalent to HZS180 stand HLS180 floor of the production efficiency is equivalent to the productivity of HZS240 station.
Q: How to choose a good concrete mixer station?
The concrete mixing station of choose and buy should focus on quality and quantity. Some users choose and buy when the concrete mixing station, don't know how should choose the equipment, now there are goods on the market of concrete mixing station, concrete mixing station, concrete mixing station. Users should choose different devices and different type of concrete mixing stations according to their own situation.
Q: What does HZS mean in the HZS120 concrete mixing station
HZ is the concrete mixing station. HZ is the concrete mixer. HZS is a concrete mixing station with a double sleeper shaft mixer
Q: How long does it take to build a concrete mixer station?
The core part of the stirring station: stirring the host, electronic control system, weighing element and instrument. The mixer should choose to use the stirring stability, the maintenance is simple and convenient, the service life is long, the match is supplied with the sufficient production plant. The electric component must choose the international brand products, preferably the imported original product, to guarantee the reliable; The software of the computer system shall be developed by the manufacturer in order to be upgraded and replaced in the future. And there should be a pro version of the software (piracy is prone to malfunctions and possible intellectual property lawsuits).
Q: What is the special work of the concrete mixing station
The ratio of the concrete particles to the surface area, the shape of particles, the density of the particles and the grading of the particles, etc., are very important to the liquidity of the slurry. Smaller than surface area, the particle shape is closer to the ball, bigger, more filling and more liquid. By optimizing these factors, you can obtain the most appropriate liquidity. In order to design the concrete mix according to the engineering requirement, the characteristics of the aggregate material must be mastered first. The properties of aggregates are determined by factors such as microstructure, prior exposure and processing, and these factors influence the properties of fresh and hardened concrete. The effect of aggregate properties on concrete performance should be considered, and the quality of concrete mixing equipment should be considered. Before installation, check the appearance quality of the equipment again, the platform bolts are not loose, the welding seam is not cracked, the oil leak, the water, the ash (the lump), etc. Clean the assembly of the whole machine and re-spray paint, rust and renovate. Prepare the all kinds of bolts, welding wire, iron plate, etc., to prepare tools and protective equipment, the use of more tools for several sets of parts can use pneumatic wrench, and provide timely acetylene cutting, electric welding equipment; Plan the entry time of the crane.
Q: Which staff does the concrete mixing station need?
Mainly depends on how big is your station, whether can fully staffed, mainly included: general manager, deputy general manager, technology, webmaster, laboratory (deputy) director of the general, the production manager, sales managers, salespeople, scheduling, lab team leader, the operator (inspection), quality inspection, proportioning design, the material inspector technicians, machine operators, resposible, site, monitor of overhaul, maintenance engineer, loadometer, finance, cashier, mixers, pump truck drivers, company drivers, forklift driver, the handyman, chef, etc These are the main people who want to help you.
Q: The mixing time of the concrete mixer is in which standard
The quality control standard gb50164-2011 should not be produced for 40 seconds in the winter of 30 seconds