Asphalt Batching Plant with productivity of 120t/h
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m.t.
- Supply Capability:
- 1 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
LB1500 Asphalt Mixing Plant with capacity 120t/h
Item | Description | Remarks |
1 | Aggregate batching machine:4 units The bin capacity: 8M³ (flat hopper), total capacity 32M³;
| 1 set |
2 | The feeding belt conveyor | 1 set |
3 | Drying drum Dimension: Æ1900×7730 mm, the installation angel: 4°, the running speed 7.3rpm, rotation running through 4 units electric motor and cycloid reducer, the outer side wrapped with 50mm mineral wool thermal insulation layer with stainless steel. | 1 set |
4 | The burning system: Italy EBICO oil burner Fuel kinds :diesel& heavy oil, coal or gas; with a diesel tank (10t) and a heavy oil tank (10t). With China made Automatic burner ( as optional ) With China made coal burner ( as optional ) | 1 set |
5 | The inertial dust collector: Two-drum vertical cyclone dust collector | 1set |
6 | Bag dust collector ,The bag material:NOMEX America With water filter ( as optional ) | 1set |
7 | Hot aggregate elevator: adopts the double-chain elevating hopper, Hoisting capacity ≥130t/h | 1set |
8 | The vibration screen unit of the hot aggregate: four layers seven segments | 1 set |
9 | The hot aggregate bin:4 bin, 24 m3 totally | 1 set |
10 | The weighing system for the hot aggregate, filler and bitumen | 1 set |
11 | The mixer capacity: 1500 kg/batch; 30kw×2 | 1 set |
12 | The tower frame The main tower with supporting legs, repairing platform and guardrail | 1 set |
13 | The filler supplying system, capacity: 27m3; Capacity:20 tons/hour; Power elevator (as optional) | 1 set |
14 | The hot oil heating system and pipeline the hot oil heater capacity 60×104KCal/h (coal heater as optional) | 1 set |
15 | Asphalt tank and pipeline: 3 units of 25tons tanks (30 tons as optional) | 3 sets |
16 | Pneumatic control system | 1 set |
17 | The electric control system Siemens PLC control ,Main electric parts :Simens or Schneider brand Automatic and Manual control mode | 1 set |
18 | Control room: 5.19m×2.25 m× 2.50 m | 1 set |
19 | Finished asphalt storage silo ( 60tons, 120 tons ) as optional part | 1 set |
| Total power:385KW---469KW Total size: 34m*32m*19m(length*width*height) Price arange: (FOB Qingdao China) |
|
- Q: The main components of a mixing station
- The conveying system of materials is made up of three parts. Aggregate conveying; There are two ways of conveyance and belt conveyance. The advantage of hopper promotion is that the area is small and the structure is simple. The advantage of belt transport is that the transport is large, efficient and low. The belt conveyor mainly applies to the mixing stations that have aggregate storage, thereby increasing the productivity of the mixing stations. Powder conveying; The powder used in concrete is mainly cement, fly ash and mineral powder. The most commonly used powder conveyors are conveyors of screw conveyors, and the large mixing buildings are carried by pneumatic conveyer and scraper. The advantages of screw transport are simple structure, low cost and reliable use. Liquid transport mainly refers to water and liquid admixtures, which are delivered separately by water pumps
- Q: What is the concept of on-site concrete mixer station
- It's not a simple blender. It's not a simple blender. But an intensive production scale small and use the site concrete, according to the need to establish a set of automatic production line, divided into according to production output per hour 35 square (45), 50 square (60), 75 (90), 90 (120), the standard station with laboratory; To establish the corresponding scale of the stations according to the construction needs; This kind of mixing station can not only guarantee the quality of concrete, but not the time factor, which guarantees that 24 hours can produce the concrete needed for the site. He needs to have about 30, 000 or so in demand, and the site is suitable. This has low cost, convenient site management and mutual benefit!
- Q: What are the supporting facilities for the concrete mixing stations?
- Mixing station can be divided into single and double machine stand, as the name implies, stand-alone station each station has a mixing console, the double machine station has two mixing console, each mixing console has a discharging mouth, so double machine mixing plant is a stand-alone station 2 times of production capacity.
- Q: How much water does a concrete mixer use every day?
- Dosage, depending on your project and mixing station construction factory cleaning every day, because now the country's love the strict monitoring of environmental protection, to maintain clean our factory, is a lot of water to clean the work area. So the client had better prepare the pool to ensure the normal operation of the project.
- Q: How long does it take to build a concrete mixer station?
- Normally, between one and three weeks. Plan the main points of the stirring station Venue: single 2m3, 3m3, the equipment occupies an area of about 21mx51m. Add in the yard, parking lot, road, office building, repair shop, recycling pool and so on, usually need the site 40mx80m (the land of 5 acres). 2m3 and 3m3 stations usually require 60mx80m (7.5 acres). If the location is more complex, the layout of the equipment should be based on the utilization of the site. To reduce the cost of future operations, it is suggested that there be a river at the edge of the site so that it can be used to carry sand stones. Distance should consider the best range of concrete delivery vehicles, not too far away from the main site, but also for future development. Optional: choose according to the expected amount of concrete. In a year of 300 working days, eight hours a day, the actual efficiency is lower than the nominal value given the various factors that are affected. Considering the requirement of the equipment for regular maintenance and maintenance, and the requirement of the high demand in some period, it is suggested that the equipment should be purchased. In some areas, the construction of new concrete and concrete stations must be at least two.
- Q: What are the ingredients for the concrete mixing stations?
- Start with the glue: cement, coal ash, mineral powder, and various expansions! Sand: natural sand, mineral sand, fine sand; Stone: 5-10, 5-20 water reducer! And tap water
- Q: What is the special work of the concrete mixing station
- The ratio of the concrete particles to the surface area, the shape of particles, the density of the particles and the grading of the particles, etc., are very important to the liquidity of the slurry. Smaller than surface area, the particle shape is closer to the ball, bigger, more filling and more liquid. By optimizing these factors, you can obtain the most appropriate liquidity. In order to design the concrete mix according to the engineering requirement, the characteristics of the aggregate material must be mastered first. The properties of aggregates are determined by factors such as microstructure, prior exposure and processing, and these factors influence the properties of fresh and hardened concrete. The effect of aggregate properties on concrete performance should be considered, and the quality of concrete mixing equipment should be considered. Before installation, check the appearance quality of the equipment again, the platform bolts are not loose, the welding seam is not cracked, the oil leak, the water, the ash (the lump), etc. Clean the assembly of the whole machine and re-spray paint, rust and renovate. Prepare the all kinds of bolts, welding wire, iron plate, etc., to prepare tools and protective equipment, the use of more tools for several sets of parts can use pneumatic wrench, and provide timely acetylene cutting, electric welding equipment; Plan the entry time of the crane.
- Q: The average commodity concrete is mixed with a day to use how much fly ash
- That depends on how many square measures you do in a day, and you typically do 1,000 concrete words 80 to 90 t
- Q: What is the difference between a concrete mixer and a concrete mixer
- The bone material of the mixing tower is on the top, and the aggregate is measured directly into the mixer. The concrete bin of the commercial concrete station is below, and the bone material is measured and then transported into the mixer after being transported by the inclined belt (which also has some use of the elevator). In a popular way, it is called the building, which is called the second ascent. The steel structure will be larger and the diagonal belt will be relatively longer because of the bone material in the mixing building. But in productivity, the churn is about a fifth higher than the commercial concrete station. In operation, because the inclined belt of the commercial concrete station starts frequently, the energy consumption and the failure rate will increase, and the energy consumption of the mixing building is lower than the failure rate. In the end, because the production capacity of the concrete station is small, the structure is easily disassembled and can be made into a container transfer site, which is suitable for the construction site. The mixing tower is large and high in productivity, and can only be used as a fixed mixer, suitable for the supply of large water projects or large quantities of goods. So customers in the difference between commercial concrete, concrete stand and commodity concrete mixing floor, from aggregate (material), the production efficiency and so on, to choose and buy the right equipment.
- Q: The mixing time of the concrete mixer is in which standard
- The quality control standard gb50164-2011 should not be produced for 40 seconds in the winter of 30 seconds
Send your message to us
Asphalt Batching Plant with productivity of 120t/h
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m.t.
- Supply Capability:
- 1 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords