• Airtightness Film Waterproof Film Self-adhesive type for Sealing for Indoor Moisture Transmission System 1
  • Airtightness Film Waterproof Film Self-adhesive type for Sealing for Indoor Moisture Transmission System 2
  • Airtightness Film Waterproof Film Self-adhesive type for Sealing for Indoor Moisture Transmission System 3
Airtightness Film Waterproof Film Self-adhesive type for Sealing for Indoor Moisture Transmission

Airtightness Film Waterproof Film Self-adhesive type for Sealing for Indoor Moisture Transmission

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 m²
Supply Capability:
1000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Airtightness Film is especially suitable for sealing structural joints in solid structures and metal structures where connections are required to window and door frames.

Application

Applicable for waterproof sealing of door and window, wall gaps in passive buildings, prefabricated buildings, green buildings, etc.

Q: A complete set of basement waterproof construction program
2.2 site preparation 2.2.1 external wall of the pull bolts should be cut off in advance, wooden blocks removed after the use of cement mortar smooth. 2.2.2 grass-roots should be clean, concrete joints processing flat, made at the corner of the yin and yang ...
Q: What decoration materials, light and water, and the wall, the perfect combination of glass
Between the glass and the wall is generally waterproof with waterproof glue, the specific steps are as follows: First, clean the surface Remove the surface of the joints of water, grease, dust and other pollutants, with a clean cloth to clean all the residue, so that the surface clean and dry. (If it is waterproof glue, the surface should be flat and clean, plastic gap to slightly curved as well.)
Q: Find the construction steps for waterproof coatings
1, base surface treatment (1) roof structure After the completion of concrete pouring, should be repeated water compaction, so that the surface of the grass-roots level, the flatness with 2m to check the ruler, ruler and grass-roots gap of not more than 5 mm, and only allow gentle changes. (2) the base surface of the pores, rugged, honeycomb, gap, sand, etc., should be promptly treated, the base surface must be clean, no floating slurry, no water beads, no water; when the base surface appears more than 0.3 mm cracks , Should rush each 10 cm brushing 1 mm thick polyurethane coating waterproof layer, and then set the polyurethane cloth reinforcement layer, and finally brushing waterproof layer. (3) all the corners are used 5 × 5㎝ 1: 2.5 cement mortar for chamfering, the angle made R = 10 mm rounded corners.
Q: Waterproof mortar expensive or dry mortar expensive
Waterproof mortar more expensive. Because waterproof mortar compared to dry mortar, to add another waterproofing agent, emulsifier and other substances. Waterproof mortar regardless of the cost or transport are more cost-effective.
Q: Cabinet is to buy finished products, or directly to the decoration company to do?
Finished products to buy relatively easy to do some of the cabinet to do more solid material more assured because the plate is also a long-term environmental protection or woodworking directly do better feel that the company can quote their own under the woodworker comparison
Q: Home improvement waterproofing problem
1, you said the above three products are old products. It is recommended to use the latest dosage form of cf-2000 efficient composite waterproofing agent, is the latest cement-based crystalline products. Not only then to solve the leakage problem, and the composite waterproof agent in the active material in the water or moisture under the action, but also continue to penetrate into the concrete layer. The formation of 10 cm from the self-waterproof layer. If the self-waterproof layer due to external factors caused by small cracking, as long as there is water through, you can start the active substance of the secondary repair function, to automatically repair the crack water seepage.
Q: How do you make waterproofing in the kitchen and bathroom?
Kitchen and toilet to do waterproof, it is recommended to use kitchen and toilet waterproof paste, it is specifically for the kitchen and toilet water and easy to seepage yin and yang angle, pipe, sanitary ware, floor drain and other parts of the development, special materials, so waterproof Ordinary waterproof material is better, and waterproof coating construction is more convenient, only need to brush 2-3 times, the thickness of 1.2-1.5MM on it. Specific construction methods are as follows: 1, will penetrate the root, floor drain and other cracks, need to repair the site cut into "V" shape, and clean, sprinkler moist; 2, the [infiltration of crystalline repair mortar] add water (water and ash weight ratio of 1: 2 ~ 3) mixed evenly, in the early condensate before (5 minutes) to repair the construction, the root of the pipe, the floor drain, yin and yang, Should be made r angle; 3, repair mortar after the final setting, the [durable waterproof paste] powder and liquid material mixing evenly, put it aside for 3 minutes, and then stir evenly after brushing on the base surface, should be cross brush twice, and so on The first time after the dry, can be carried out the second time construction; 4, after the completion of anti-stamped, 48 hours after the closed water test.
Q: Do you use the waterproof material on the building to be harmful to the human body?
If you are out of the finished line, the best anti-static that can! I plant is the production of waterproof material, in addition to the internship when I went to the workshop, and now I do not go!
Q: FRP finished brush on what can be waterproof do not fade
On the surface of the gel coat it is, a lot of gel coat points, the specific performance of what you want, you can communicate with the supplier
Q: Waterproof material water leakage construction should pay attention to what
3, do the closed water test After the waterproof construction is completed, the water storage test. Will be blocked all the toilet outlet, the door at a pound of about 200mm high barrier, and then poured in the bathroom about 20mm ~ 30mm deep water, and 24 hours after the inspection of the walls and the ground around the leakage phenomenon , Waterproof test is to ensure the quality of the bathroom waterproofing the key, we must do. Such as after 24 hours without leakage as qualified. If you find a leak, you should immediately stop the water storage test, re-waterproof layer to improve the treatment, after passing the water test.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products