• Aerial Work Platform TMSL-6 / TMSL-7.5 / TMSL-9 / TMSL-11 for construction System 1
  • Aerial Work Platform TMSL-6 / TMSL-7.5 / TMSL-9 / TMSL-11 for construction System 2
  • Aerial Work Platform TMSL-6 / TMSL-7.5 / TMSL-9 / TMSL-11 for construction System 3
Aerial Work Platform TMSL-6 / TMSL-7.5 / TMSL-9 / TMSL-11 for construction

Aerial Work Platform TMSL-6 / TMSL-7.5 / TMSL-9 / TMSL-11 for construction

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 PCS
Supply Capability:
50 PCS/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Scissors movement design to keep stable lifting and lowering, with high capacity and large working range, could be mainly used in construction area, maintenance for large warehouse, maintenance for street lamp and so on. Moreover, because of its big solid tire, it could work perfectly in rough ground.

1. Option: DC motor, driving systems and platform extension.

2. Very beautiful and smart appearance.

3. Big solid tires.

1.Training Solutions – we develop our people through high impact training. We increase the connective intelligence potential of individuals and teams through practical, solution-focused programs in areas such as innovation, team collaboration, management development, strategic thinking and decision making.

2.Coaching Solutions - we increase leadership potential with performance coaching. We increase the connective intelligence potential of our managers and key contributors,    assessing and developing both their cognitive and emotional intelligence's (capabilities) as the latest research, and practical experience, indicates that both are needed to drive sustained performance.

3.Reward Solutions – We reward our deserving people based on performance (we ensure equitable treatment of employees because appraisals are based on result of performance) by providing the necessary incentives. Its components can be a combination of bonuses, a range of appropriate benefits such as International trips, commissions and Stock option incentive plan for management & senior workers.

Mission & Vision: The following Core Values fulfillment is our objective.

1.Integrity and Professionalism.

2.Target and Action Oriented.

3.Service Quality & Customer Oriented.

4.Pro- Active to change.

5.Passion for Excellence.

 

ModelTMSL-6TMSL-7.5TMSL-9TMSL-11
Max. Platform heightmm60007500900011000
Rated capacitykg500500500500
Min. Platofrm heightmm1080120013601480
Platform size (L×W)mm2200×10002200×10002200×10002200×1000
Electric powerv220220220380
Lifting motorkw2.22.22.23
Machine size (L×W×H)mm2270×1300×11802270×1300×13002270×1300×14602270×1300×1580
Net weightkg950135016001800
Standard configure with AC motor
Option items1DC motor with battery.
2Driving sysetems.
3Platform extension.

Q: 1.Vibrator road roller, 2.Excavator(lt / tata hitachi), 3.Dozer, 4.Concrete vibrator, 5.Plate compactor, 6.Dumper7.Dozer, 8.Truck(full body), 9. Truck (407), 10.Tar boiler
Just like cars depends on the size of the machine. Is the Dozer a D11 or is it a D3? Is the truck a Toyota Tacoma or is it Peterbilt 357? What are you hauling? What size Engine? What climates are you operating at? Is the job site full of hills and what material are you working with?
Q: I have a few questions about this. I have 13 years experience driving all kinds of things. I use backhoe, front end loader, forklift and large trucks with trailers.Is there a demand for people with my skills in Denmark?How much money could I expect to make?Do any of the vehicles I use require a special license in Denmark?
Based on the terminology you used, I'm guessing that you're American. You'll need to be fluent in Metric, Danish, and have a Danish driver license to be considered for this type job. You will be against equally (or more) qualified drivers, and the employer must offer Danish jobs first to Danes, second to Nordic labour agreement citizens (SE, IS, NO, FI), third to qualifed EU citizens, then everyone else. Unless you have a very specialized skill in huge demand, I don't think you have much chance.
Q: I plan on wearing a suit but I am wondering if I can go a little casual and skip the tie.
Quite simply YES You should always dress smartly, whatever the work environment Catherine
Q: i need to know what are the machinery and equipment needed to start a pectin extraction job.any websites or additional information would be helpful.thanks
I don't know the exact names for the equipment but you'll need a pulverizer,(grinder) and a dryer. The best type of pectin comes from limes. See if any of this helps?
Q: 2. Prepare balance of Machinery account on following dataOpening Balance on 1 jan 2010 - 1,20000Purchase of new machinery in yr 2010- 60,000Destruction of machinery due to fire - 12000What is balance on Dec 2010
Assuming all this is at cost and we don't have to worry about depreciation, AND if the opening balance is 120,000, then Opening Balance on 1 jan 2010 - 120,000 + Purchase of new machinery in yr 2010- 60,000 - Destruction of machinery due to fire - 12000 = balance on Dec 2010 $168,000
Q: What kinds of construction machinery are used in the Three Gorges Project?
Hydraulic excavators and wheel loaders, bulldozers, graders, hydraulic drilling machine, truss boom crawler crane, truck crane, gantry crane, luffing cable cranes
Q: How do I make cacao butter using raw beans and no machinery?
Did okorder / . This is able to extremely manage one and all!
Q: Anyone know anything about Machinery Technician (MK) in the coast guard reserves? Is it true they would train you on working with engines? Anyone know if positions are guaranteed in CG or no? The website says 12 weeks in Yorktown, VA, *or* on the job training, has anyone ever gotten on the job training for this position instead and where at?
For information on Joining the Coast Guard write to: Coast Guard Recruiting 4200 Wilson Boulevard, Suite 450 Arlington, VA 22203 Telephone: 1-877-NOW-USCG
Q: Doctor said im unable to use certain machinery due to causing swelling in my hand but she didn't put me on medical leave but my employer did. Are they allowed to do this
yes they can. if you can't safely operate a machine they can take you off of it.
Q: In Australia, the original fauna never evolved to a bright height, the marsupials occupying the peak.Is it due to the harsh arid Australian environment?
Marsupials actually originated in North America 193 to 186 million years ago.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords