ACS50
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Description:
Auto-climbing system ACS50 is composed of formwork system, bracket system, hydraulic system, anchor system. It guarantees simple procedure of assembly and climbing without any lifting machine, so it is the best choice for the high rise building and bridges.
Competitive Advantage:
1. Perfect anchor system with high load bearing capacity.
As the picture shown, the anchor system is composed of five parts. The load bearing will firstly be transferred to tensile bolt①, then be transferred to climbing cone③, tensile tie④ and anchor plate⑤, that means the concrete structure will be the final force point. Therefore, the whole ACS system unit is very safe and stable.
2. Crane-independent
Crane-independent forming, striking and climbing speeds up the work procedures on the construction site and also makes them independent of each other. This means the planned sequences can be maintained along with guaranteeing high productivity levels. The crane can therefore be used for other tasks.
3. High bearing capacity and safe
The stable working platforms are able to carry large loads, e.g. the storage of reinforcing steel for the next climbing section. Generously-sized working platforms, the well thought-out design for handling very high wind loads and the patented control function of the climbing mechanism are some of the special details contained within the comprehensive safety concept.
4. Platforms adjusted to suit the angle of inclination
The horizontal working areas thus created provide safe and comfortable conditions for reinforcement work, shuttering and striking, concreting and finishing.
5. Outstanding economical efficiency
The ACF system climbing without any lifting machine and it guarantees the simple operation procedure. Time saving, labor saving, site saving, so economical construction is easily achieved.
- Q: What are the maintenance and maintenance of hydraulic climbing formwork
- Regular inspection of the climbing device should check the connections. In particular, the following parts of the site to focus on inspection and reinforcement: according to the design requirements of the bolt with spring washers
- Q: Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
- Climbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction. It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material. And in terms of security is also a big change for the traditional scaffolding. Highly developed in high-rise buildings.
- Q: The difference between the scaffold and the scaffold
- The difference between climbing frame and scaffolding is commonly used scaffolding from below has been set up, which is followed by building up climbing frame, the figure is upstairs, they have in common is that we are like scaffolding
- Q: Advantages and disadvantages of climbing frame and floor type scaffold
- 2) easy to install and disassemble, set up flexible. Because the length of the steel tube is easy to adjust and the fastener is convenient to connect, the utility model can be used for various buildings and structures with various planes and elevations.
- Q: The whole concrete wall climbing frame or good use of steel scaffolding
- Climbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction
- Q: What is an integrated climbing frame? What are the works? What are the advantages
- The climbing frame, which is also called the lifting frame, can be divided into several types, such as hydraulic, electric, manual and so on. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction.
Send your message to us
ACS50
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches