3 Phase Out UPS 80KVA with Double Convertion Online
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 Set set
- Supply Capability:
- 10000 Sets per Month set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Phase: Three Phase
Protection: Overcurrent
Weight: 78
Output Voltage: 380
Type: On-line
Application: Networking
Packaging & Delivery
Packaging Details: | wooden case for export package |
Delivery Detail: | 20 days |
Specificatons
1. Three phase in and out system, compatible with utility of 380/400/415V, 50/60Hz
2.Online double conversion,
Capacity | 6KVA | 12KVA | 18KVA |
Main Input | |||
Input voltage | 200V/208V (line to line), 50/60Hz | ||
Input connection | 3Ph+N+PE | ||
Power factor | >0.99 | ||
Input voltage window | +20%~-20%, full load | ||
-20%~-40%, power derating between 100% to 70% | |||
Frequency window | 40-70HZ | ||
Bypass input | |||
Bypass voltage | 200V/208V | ||
Bypass voltage window | +15%--20%, full load | ||
Frequency window | ±5Hz | ||
Battery | |||
Battery voltage | ±120VDC | ||
Charger power | 20%*Power | ||
Charger voltage precision | 1% | ||
Output | |||
Voltage precision | ±1% (balance load),2% (unbalance load) | ||
Output voltage transient | 5%(0~100% load step) | ||
Voltage THD(Total Harmonic Distortion) | THD<2%(linear load),THD<5%(nonlinear load) | ||
Power factor | 0.8 | ||
Frequency tracking range | 50/60Hz±3Hz, adjustable | ||
Frequency precision (free running) | ±0.02% | ||
Phase tolerance | 120°±0.5° (balance and unalance load) | ||
Voltage unbalance degree (100% unbalance load) | ±2% | ||
Frequency tracking speed | 0.5Hz/s to 5Hz/s, adjustable | ||
Crest factor | 3:1 | ||
Overload capabiltiy | 102% long time operation | ||
110%, transfer to bypass after 1hour | |||
125%, transfer to bypass after 10 minutes | |||
150%, transfer to bypass after 1 minute | |||
>150%, transfer to bypass after 200ms | |||
Bypass overload capability | 125%, long time operation | ||
125%< load<130%, last for more than 1 hour | |||
130%<load<150%,last for more than 6 minutes | |||
>1000%, last for more than 100ms |
- Q: Why is the UPS power supply ever alarming?
- One is the fault of the other is that you are fake
- Q: 30K of the UPS, need to delay half an hour, about how many batteries (how many security) is best to write how to calculate, in addition, I need to know what is the meaning of 32 output! There are two parallel hot backup means two UPS work together? Or a work ~, another machine to do it? I am not doing this line, but now there is a need to know this project, thank you, high score reward! Put away Added: UPS requires 32 output, what does it mean! Note: UPS is 30K
- Such as the mountain 3C3 30K UPS need 384V voltage, if half an hour, then 32 will be 32 hours when the 12V battery. APC voltage is not the same.
- Q: Uninterruptible power supply UPS advantages
- The main advantage of uninterruptible power supplies is its uninterrupted power supply capability. When the mains AC input is normal, the UPS rectifies the AC rectifier into DC power, and then converts the DC into a stable impurity-free alternating current, which is used for the post-stage load. Once the mains AC input exception, such as undervoltage or power outage or the frequency is abnormal, then the UPS will enable the backup energy - battery, UPS rectifier circuit will be shut down, the corresponding, will the battery DC into a stable Impurity of the alternating current, continue to use the post-class load. This is the UPS uninterrupted power supply origin.
- Q: There is a UPS battery that is 9V 2AH. Electricity equipment room voltage 24V power is 30W Will this battery is full of energy with how long. What is the calculation formula for this time?
- Ideal calculation: battery capacity: 9V * 2AH = 18WH, Time: 18WH / 30W = 0.6 hours. But the UPS loss, in addition, the battery can not completely put the end of the battery inside the loss. So full of electricity estimates can also use a 10 to 15 minutes. Another way to determine the method: power consumption of 30W equipment, consider a variety of losses, the battery output power of at least 36W, in accordance with the rated voltage calculation, the output current needs 4A, that is, 2C current discharge, refer to the battery information, you can probably know the time The
- Q: APC-ES500, there are electric also Di Di's ring. Took a laptop and cat, trouble. Is there any way to tune his voltage range. The sound of the uncomfortable.
- Ups power is always the reason for the drop: 1, UPS is in battery-powered state, please check whether the electricity is normal. 2, the UPS is battery-powered, the machine shows the power supply time is 0, please check the battery voltage is normal.
- Q: Which brand is good for uninterrupted power supply?
- The company was founded in 2005, the production plant is located in Foshan, Foshan, is a professional UPS power supply UPS power supply, low voltage distribution and precision air conditioning R & D and production enterprises, from the creation of uphold the quality of the first, the first service A concept, with excellent product quality, second to none after-sales service, has become the country's provincial computer peripheral products, one of the channels of wholesale suppliers, the company has a huge sales system.
- Q: What is the difference between UPS and battery?
- The And can only release the voltage of 12v. Just like an ordinary battery. Just big capacity! The
- Q: Small ups uninterruptible power supply, you can add an external battery?
- Hello, low-power UPS you want to take a large battery, then the following consequences may occur 1. battery charge dissatisfaction, the battery is not a long time to scrapped, because the small machine does not have a separate charge version, can not meet the battery charge. 2. With small and medium size batteries, may have a long charge after the discharge time, if the voltage instability, frequent power failure, the battery will be scrapped in advance. 3. Discharge when the battery trickle discharge, the battery scrapped. In summary, it is recommended not to change other models of the battery, or for UPS. Mountain has a huge MT500 charging capacity can have a long delay, you can outside the large battery. I hope my answer can help you, look forward to your praise.
- Q: When the electricity is used to put the battery in the battery with the electricity out of the USP automatically turned off by the open up with a one will put the electricity out of a power outage UPS can only work two minutes ago almost 10 minutes I used UPS with a Computer host and a liquid crystal display
- First put the electric finished, and no load charge.
- Q: Home use, desktop. UPS on the market there are many, what kind of UPS should be selected? Which brand is good? What should I pay attention to when buying?
- APC, Hills, the backup can be, 100 may not work. Taobao on the price is better, model Hill TG500, with the regulator K500. APC's BK500.
1. Manufacturer Overview
Location | Beijing,China (Mainland) |
Year Established | 2005 |
Annual Output Value | Above US$100 Million |
Main Markets | 50.00% Southeast Asia 20.00% Central America 20.00% Mid East 10.00% Africa |
Company Certifications | ISO 9001:2000;ISO 14001:2004;SA8000;OHSAS 18001 |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | Shanghai,Beijing,Shenzhen |
Export Percentage | 51% - 60% |
No.of Employees in Trade Department | |
Language Spoken: | English, Chinese, Spanish, German, Russian, Italian |
b) Factory Information | |
Factory Size: | 1,000-3,000 square meters |
No. of Production Lines | Above 10 |
Contract Manufacturing | OEM Service Offered Design Service Offered Buyer Label Offered |
Product Price Range |
Send your message to us
3 Phase Out UPS 80KVA with Double Convertion Online
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 Set set
- Supply Capability:
- 10000 Sets per Month set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords