• 2.0T-3.0T Four-pivot Battery Forklift-CPD20-30 System 1
  • 2.0T-3.0T Four-pivot Battery Forklift-CPD20-30 System 2
  • 2.0T-3.0T Four-pivot Battery Forklift-CPD20-30 System 3
2.0T-3.0T Four-pivot Battery Forklift-CPD20-30

2.0T-3.0T Four-pivot Battery Forklift-CPD20-30

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Electronic control system by the Italian ZAPI, mature and reliable electronic control system, electrical control installation using fully enclosed structure to ensure the electronic control and hydraulic components from contamination and water splash.
Key vehicle components, from the electronic control, instrumentation to the safety switches are well-known imported brands, key components through a rigorous reliability tests to ensure the stability of overall performance.
Wide view of the door frame design and optimization of the door frame structure, so that a more open view of the operator, operating efficiency and safety can be improved.
Spacious room for maneuver, adjustable steering wheel and seat, the operator can choose the best driving position.
Rational distribution of the control system, fully embodies the principles of ergonomics to improve comfort and reduce operator’s labor intensity.

Specifica
tion
ModelUnitCPD20CPD25CPD30
Drive typeZAPI ACCURTIS DCZAPI ACCURTIS DCZAPI ACCURTIS DC
Capacitykg200020002500250030003000
Load centre distancemm500500500500500500
Lift heightmm3000300030030003003000
Free liftmm160160160160165165
Fork size(L*W*T)mm1070*122*401070*125*45
Mast tilt(forward/backward α°/β°)Deg6/12
DimensionsLengthmm237523752400240026152615
Widthmm11501230
Height(mast lowered)mm20102075
Mast extended height (with safeguard)mm399039903990399041004100
Overhead load guard heightmm211021102110211021502150
Min turning radiusmm208020802100210022802280
Front overhang mm465465465465485485
Tread(F/B)mm960/9501000/980
Min ground clearancemm125125125125130130
wheelbasemm150015001500150016801680
Fork adjustable (Max/Min)mm250/1040250/1100
1000×1200 crosswaysmm381038103830383040354035
800×1200 lengthwaysmm394039403960396041654165
Performan
ce
Travel speed(laden)km/h121112111212
Travel speed(unladen)km/h12.512.512.512.512.513
Up speed(laden)mm/s290220290220250220
Down speed(unladen)mm/s440360440360400384
Gradeability(laden/unladen)%15/1515/1515/1515/1515/1515/15
N.W(Inc. battery)kg413041304300430050605060
Tyre(FrontX2)7.00-12-12PR28x9-15-12PR
Tyre(RearX2)18x7-8-14PR18x9-8-14PR
Drive
motor
Travel motorkw1171171210
Lift motorkw111011107.410
Travel motor*2kw────────────
Lift motor*2kw────────────
Battery (standard)V/Ah48/62048/60048/62048/60080/50080/500
ControllerTypeACDCACDCACDC
ManufacturerZAPICURTISZAPICURTISZAPICURTIS
OthersOperating pressure for attachmentMpa17.517.517.517.517.517.5


 

Q: what are the necessary machinery or equipments for a restaurant in the Philippines?
You would need industrial cooking range and industrial cooking utensils.
Q: Engineering machinery as the main means of project construction industry in recent years (including construction machinery, road construction machinery) and demand has increased rapidly, which stimulates the use of the manufacturing, engineering machinery, maintenance industry often demand. At the same time, the high-tech construction machinery, maintenance equipment maintenance maintenance numerous, complex process, high technical requirements and related mechanical engineering research and development, manufacturing, sales, use, maintenance and other personnel, enterprises generally reflect the lack of.
The profession is very good, employment is particularly easy, and if you do not hate physics, it is not so hard to learn. This year, the school is not circulated a piece of it, a large enterprise to recruit machinery students, the boss said: "you just do not have a diploma, as long as there are student cards, we want you.". It shows that employment is fairly good, but the fact that wages are not particularly high is a fact. For example, when you enter a bank, you can take 5K months, and the machines may look like 2K to 3K.
Q: How long did Noah take to design and build his 3 phase electronic machinery to build the Ark?
You are kidding me?
Q: Can anyone help me identify this logo/sign
no sorry.
Q: i need woood working machinery for my industry.i am looking for good indian supplier for iported machines.
You can find several trusted suppliers near by your region for easy and affordable transportation of your required woodworking machines.
Q: Farm machinery operates under very difficult situation in the field. For example, paddy fields are muddy with pesticide, fertilizer and other chemicals in which tractors containing steel and aluminum components operate. This results in corrosion of metallic component. Propose methodology for preventing corrosion in farm machinery.
For those parts which do not get heated up,apply coal tar,(Damar in Hindi),so that water can't come in contact with them.It will not wear off that easily. With those parts that get heated up,apply coconut oil,once in two or four days, depending upon machinery's use.Again clean with fresh water apply oil.In this way,both the metals are easily saved.
Q: Can the construction machinery mortgage?
Product features (1) expanded the scope of the pledge collateral, and solved the problem of insufficient guarantee for the production of small and medium-sized enterprises. (2) invigorated the fixed assets of enterprises and widened the financing channels for enterprises. (3) the scope of accepting collateral equipment is wide and suitable for different types of production small and medium-sized enterprises.
Q: In law, how many years of depreciation of construction machinery? (excavator)
People's Republic of China Enterprise Income Tax Law Implementation Regulations belongs to the country level legal norms, the provisions of the law as long as the Department has been abolished, according to the execution, not yet abolished, so in 2012 to continue to press the execution
Q: Machinery name
BUTTER AND GHEE MAKING EQUIPMENT Cream Storage Tank 1000/2000/5000 L Butter Churn 500/1000L S.S. Butter Trolley 300Kg/500Kg Butter Melting Vat 1000/2000L Ghee Boiler 500/1000/1500/2000L Ghee Settling Tank 500/1000/1500/2000L
Q: Machinery!
Check out library periodicals. I know that my school posts thousands of them online for any sort of subject you are looking for.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords