Wind Turbine 300W for Street Light
- Loading Port:
- Shekou
- Payment Terms:
- TT or LC
- Min Order Qty:
- 20 set
- Supply Capability:
- 2000 units / month set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Structure of Wind Turbine 300W for Street Light
The wind-solar hybrid LED street light system including Maglev vertical axis wind turbine, wind-solar hybrid intelligent controller, 60W LED lamp, Solar Panel, Battery with Pole. Each parts detail introduce as below:
(1) Maglev vertical axis wind turbine
maglev technology personnel was our company integrating appearance design, practical design, mechanical, electrical engineering, power, wind tunnel test of atmospheric air, maglev technology, computer simulation fraction disciplines such as integrated, using maglev technology theory, without any mechanical friction in motor under the condition of wind loads, in turn, make fan motor startup, high grade 1 wind power generation, smooth operation
(2) Wind-Solar hybrid intelligent controller
The intelligent controller has three main functions:*Prevent battery overcharge and over discharge
*Change AC into DC
*Can be set time, RPM and light control with time control to street light
(3) LED Lamp
Self-research and design, use CREE brand chip, high-strength tempered glass with better light transmission and UV resistance. Power efficiency was higher than 93%, 50000 hours life span with intelligent dimming function.
(4) Solar Panel
Generally we use MONO silicon solar panel that it transform efficiency can be get 18% above
(5) Battery
Used lead-acid or GEL batteries, usage time between 3 to 5 years. Wanted more battery usage time please use lithium iron phosphate battery
(6)Light Pole
Used Q235 high-quality steel, the thickness of up to 9mm around, and after DACROMET technical treatment, can be anti-rust anti-acid, alkali
2. Main Features of Wind Turbine 300W for Street Light
• Gearless design: no need to replace worn-out or broken gear
• Brushless: motor brushes making high failure items results in regular replacements
• Bearing-free design: no need to lubricate or to replace worn-out bearings
• Magnetic levitation design: reduces rotational resistance to enhance power generation as well as prolong the turbine life.
• No yaw or furling mechanism required: allows for peak power output at any wind speed
• No cogging torque for cutting-in at low wind speed
• Direct-drive: Extends product life
• Blades can start rotating at very low wind velocity of 2.2 mph (1 m/s)
• Space-saving, aerodynamic airframe
• Heavy duty and industrial level construction
Wind Solar Hybrid Street Light System With Doulbe LED Lamps
3. Wind Turbine 300W for Street Light Specification
Rated power | Approx. 300Wh at 13 m/s (26 mph) |
Swept Area | 0.8 m2 |
Height / Diameter | 1.23/1.09 m |
Weight | 27 kg |
Shipping Dimensions | 1160 x 520 x 790 mm 56 kg |
Startup Wind Speed | 1 m/s (2.6 mph) |
Voltage | 12, and 24 V AC |
Turbine Controller | Smart Wind $ solar hybrid controller |
Body | Permanent mold cast aluminum |
Blades | (7) Injection-molded aluminum |
Alternator | Permanent maglev generator |
Overspeed Protection | 3 phases short-circuit braking control |
Survival Wind Speed | 65m/s |
Mount | Inner diameter 80MM 140mm outer diameter |
Wind Speed Operating Range | 1-15 m/s (8-49 mph) |
Optimum Wind Speed Range (RPM) | 8-10 m/s ( 750-800RPM) |
4. Images of Wind Turbine 300W for Street Light
5. FAQ
(1)Is the maglev wind turbine expensive?
Yes, it is more expensive than HAWT because of solid and durable materials, but it has higher power effficiency and longer lifespan than HAWT.
(2) How about the installation?
• Easy Installation: System can be assembled within one hour
• No welding
• Single or multiple unit connection for bigger power production
• Easy connection with PV systems
- Q: The insulation level of the electrical equipment in the neutral grounding system shall be consideredA. phase voltage;The square root of 2 phase voltage B.;The square root of 3 phase voltage C..Great God in the end this election? I am very tangled!
- According to the line voltage, the neutral grounding is star type connection, line voltage is 3 times the square root of the phase voltage, so the choice of C
- Q: When a fault occurs in power system, the circuit breaker tripping device near fault
- When a fault occurs in power system, the circuit breaker tripping device near the fault, in order to reduce the power outage, this is the relay protection ().A, selective B, reliability C, sensitivity D, non selectivity
- Q: The production and transportation process of electric power
- The equipment of the two system comprises a measuring device, a control device, a relay protection device, an automatic control device, a DC system and necessary auxiliary equipment. Power system voltage level has 220V, 380V (0.4 kV), 3 kV, 6 kV, 10 kV, 20 kV, 35 kV, 66 kV, 110 kV, 220 kV, 330 kV, 500 kV, 750kV, 1000kV. With the improvement of motor manufacturing process, 10 kV motor has been mass production, so the use of kV, 6 kV has been less than 20 kV, 66 kV is also rarely used. The power supply system is 10 kV and 35 kV. Transmission and distribution system to 110 kV or above. Power plant generator has 6 kV, 10 kV and, with a total of 20 kV, users are 220V, 380V (0.4 kV) low voltage system 20kV.
- Q: What is the specific name of the double name of the equipment in the electric work sheet? Know please enlighten me.It would be better if you had a sample ticket.
- Such as: 307DL. The device name is on the circuit breaker, numbered 307DL, together they should write off on the line: circuit breaker 307DL
- Q: I would like to open a company on the construction of power equipment, what needs to be prepared? (including qualification level, capital requirements, etc.) the more detailed the better
- In addition to the requirements of industrial and commercial registration, there are two industry qualification requirements. Both are the higher the level, the higher the level of examination and approval department, the highest level, respectively, need to be approved by the State Ministry of housing and national home appliances. The newly established enterprises with no performance can only start from the lowest level four.
- Q: Large engineering construction (such as buildings, factories, institutions) distribution room of the power equipment as required? What's the difference? For example, some requirements never power, and some to eliminate harmonics to improve power quality, the more detailed the better the program
- Construction of electricity, then it is necessary to look at the site to enter the electricity equipment, under normal circumstances, with 380, 220V power is enough
- Q: What equipment are used in the power, can help to divide some of the details, as well as the type of equipment under the type of equipment
- When drawing the main wiring diagram, the transformer, arrester, capacitor, neutral point equipment and carrier communication can be used to reflect the situation of power supply in normal and accident conditions. Electrical wiring is also known as the main electrical
- Q: In order to obtain the qualification test of power equipment, the company needs to have a hard condition
- The provincial electricity supervisor application; can only apply for five (10KV and below) or level Four (35KV and below) qualification, the first level of qualification can only apply for the first four to rise
- Q: The two devices of the power system have those
- Internal equipment:1, measuring meter, such as voltmeter, ammeter, power meter, electric energy meter for measuring electrical parameters in the circuit.2, insulation monitoring device.3, control and signal device.
- Q: What are the two devices in the power system
- Connect the two device circuit, called the two line. In the two line of DC is generally used for communication detection equipment, such as PABX, PDH, MUX, generally for 48V DC power supply, AC line for AC equipment use
Send your message to us
Wind Turbine 300W for Street Light
- Loading Port:
- Shekou
- Payment Terms:
- TT or LC
- Min Order Qty:
- 20 set
- Supply Capability:
- 2000 units / month set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches