• Wind Turbine 300W for Street Light System 1
  • Wind Turbine 300W for Street Light System 2
Wind Turbine 300W for Street Light

Wind Turbine 300W for Street Light

Ref Price:
get latest price
Loading Port:
Shekou
Payment Terms:
TT or LC
Min Order Qty:
20 set
Supply Capability:
2000 units / month set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing
  1. Structure of Wind Turbine 300W for Street Light

    The wind-solar hybrid LED street light system including Maglev vertical axis wind turbine, wind-solar hybrid intelligent controller, 60W LED lamp, Solar Panel, Battery with Pole. Each parts detail introduce as below:

    (1) Maglev vertical axis wind turbine
    maglev technology personnel was our company integrating appearance design, practical design, mechanical, electrical engineering, power, wind tunnel test of atmospheric air, maglev technology, computer simulation fraction disciplines such as integrated, using maglev technology theory, without any mechanical friction in motor under the condition of wind loads, in turn, make fan motor startup, high grade 1 wind power generation, smooth operation
    (2) Wind-Solar hybrid intelligent controller
    The intelligent controller has three main functions:

    *Prevent battery overcharge and over discharge

    *Change AC into DC

    *Can be set time, RPM and light control with time control to street light

      (3) LED Lamp
Self-research and design, use CREE brand chip, high-strength tempered glass with better light transmission and UV resistance. Power efficiency was higher than 93%, 50000 hours life span with intelligent dimming function.
     (4) Solar Panel
Generally we use MONO silicon solar panel that it transform efficiency can be get 18% above
      (5) Battery
Used lead-acid or GEL batteries, usage time between 3 to 5 years. Wanted more battery usage time please use lithium iron phosphate battery
       (6)Light Pole
Used Q235 high-quality steel, the thickness of up to 9mm around, and after DACROMET technical treatment, can be anti-rust anti-acid, alkali

 

2. Main Features of Wind Turbine 300W for Street Light

 

• Gearless design: no need to replace worn-out or broken gear
• Brushless: motor brushes making high failure items results in regular replacements
• Bearing-free design: no need to lubricate or to replace worn-out bearings
• Magnetic levitation design: reduces rotational resistance to enhance power generation as well as prolong the turbine life.
• No yaw or furling mechanism required: allows for peak power output at any wind speed
• No cogging torque for cutting-in at low wind speed
• Direct-drive: Extends product life
• Blades can start rotating at very low wind velocity of 2.2 mph (1 m/s)
• Space-saving, aerodynamic airframe
• Heavy duty and industrial level construction
Wind Solar Hybrid Street Light System With Doulbe LED Lamps


 

3. Wind Turbine 300W for Street Light Specification

 

Rated power

Approx. 300Wh at 13 m/s (26 mph)

Swept Area

0.8 m2

Height / Diameter

1.23/1.09 m

Weight

27 kg

Shipping Dimensions

1160 x 520 x 790 mm  56 kg

Startup Wind Speed

1 m/s (2.6 mph)

Voltage

12, and 24 V AC

Turbine Controller

Smart Wind $ solar hybrid controller

Body

Permanent mold cast aluminum

Blades

(7) Injection-molded aluminum

Alternator

Permanent maglev generator

Overspeed Protection

3 phases short-circuit braking control

Survival Wind Speed

65m/s

Mount

Inner diameter 80MM 140mm outer diameter

Wind Speed Operating Range

1-15 m/s (8-49 mph)

Optimum Wind Speed Range (RPM)

8-10 m/s ( 750-800RPM)

 

4. Images of Wind Turbine 300W for Street Light

 Wind Turbine 300W for Street Light

5. FAQ

(1)Is the maglev wind turbine expensive?

Yes, it is more expensive than HAWT because of solid and durable materials, but it has higher power effficiency and longer lifespan than HAWT.

 

(2) How about the installation?

• Easy Installation: System can be assembled within one hour
• No welding
• Single or multiple unit connection for bigger power production
• Easy connection with PV systems


 

  •  



Q: Electric power automation equipment
Power grid dispatching automation, power system analysis and control, power electronics, power market, distribution automation,
Q: What is the installation equipment of the transformer on the power installation project
It is composed of oil immersed transformer, low voltage outlet cabinet, lightning arrester, conductor, concrete pole, insulator, hardware and iron accessories, concrete prefabricated components. Construction method:
Q: What are the necessary equipment for power line project?
First of all to have safety equipment, such as an electroscope, grounding wire, personal security line, an insulating rod, a nuclear phase device etc.
Q: All I know is a generator, a transformer. I also want to fully understand the power system related to the equipment, from power generation to end users (enterprises, factories, they will design the equipment, production equipment is not to say, but they will be transferred to the electricity, in use is the processing equipment, such as transformer, I only know this involved) equipment, detailed list, thank you ah
Two equipment: all kinds of relays, switchgear, PLC and other control equipment.The power plant and substation: electric energy metering, remote device (RTU monitoring and high frequency cutting machine), relay protection equipment (generator, transformer, bus lines and other equipment such as protection, differential protection, distance protection, over-current protection, earthing protection), automatic line monitoring device, are now in microcomputer protection the equipment.Enterprise side: the control of power supply system, DCS distributed control PLC programmable control; relay protection equipment (mainly over current protection); reactive power compensation cabinet overvoltage protection, reactive power compensation cabinet intelligent control components.
Q: The company has a number of power equipment to be exported, need to go through the sea, the technical requirements of three, I would like to ask what is the three here? How to check whether the complete sets of components used to do three treatment? Please exhibitions, grateful!
Three refers to the anti moisture, salt spray, anti mildew.According to the complete set of electrical as well as five: (1) to prevent the wrong points, close circuit breaker;2) to prevent the pull and load isolation switch;3) to prevent the electrification (hanging) grounding switch (line);4) to prevent the ground wire (switch) with circuit breaker (isolation switch);5) to prevent straying into the charged interval.
Q: Generator, shunt capacitorShunt reactorShunt capacitorStatic compensator
The equipment you have listed has this function. The generator and the camera belong to the rotation compensation equipment
Q: For example, EPS emergency power supply and so on, as well as those used in public emergencies.
The latest electric power emergency response and emergency plan for safety protection"Emergency treatment and safe latest power accident contingency plans to protect the implementation of manual" is based on the country's electricity production safety accident emergency system master, provides all levels of power supervision departments and the major power companies, power system, power grid to cope with major public emergencies working principle, organization system and operation mechanism, for guiding the competent departments and local governments at all levels in various industries and departments effectively deal with the power of public emergencies, protect public life and property safety, has an important role to reduce disaster losses.
Q: What is the redundancy of electrical equipment
I/O card: to the server, mainly refers to the network card and hard disk control card redundancy. Network card redundancy is inserted in the server dual network card. The card was large and redundant technology medium on technology, now has been owned by the PC server. PC server such as Micron's NetFRAME9200 up to 4 network card redundancy, the 4 network card each bear the network traffic of 25%. COMPAQ all ProSignia/Proliant servers have fault tolerant redundant dual nic.
Q: Pre checking and checking of goods in power system
Check: the full name is a regular inspection, with the role of pre trial is almost the same as the general power system is the two equipmentGoods inspection heard, just heard of items set is the item visit orderly, convenient for production work.
Q: Power equipment is required to replace the dimension, the state has no relevant provisions
If the customer has the ability to organize their own maintenance can also be replaced by Victoria

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches